# Releaseaudit

> Forensic release & shipping-safety audit v1 (Gestalt-Popper). 20-phase deep analysis of whether shipping is SAFE and REVERSIBLE: CI/CD pipeline integrity, build reproducibility (deterministic, hermetic, lockfile-pinned), semantic versioning correctness, changelog accuracy (does it match the diff?), database migration safety (forward AND rollback, expand-contract, backfill ordering), blue-green / canary / rolling deployment strategy, the rollback procedure (does it actually exist, is it tested, is it one command?), feature-flag hygiene (stale flags, kill switches, default-safe), deploy gates (required checks, approvals, smoke tests), secret handling in the pipeline (no plaintext in logs, masked, least-privilege deploy tokens), post-deploy verification (health checks, 200 probe, error-budget burn), artifact provenance & supply-chain signing, environment parity (dev/staging/prod drift), zero-downtime guarantees, dependency-on-deploy ordering, plus verdict, fix plan, fix execution, re-audit, and a deploy-safety g

- Skill: `agentik-os/releaseaudit` (Agent Skill)
- Install (CLI): `npx skillmds@latest add agentik-os/releaseaudit`
- Raw SKILL.md: https://api.skillmd.com/api/skills/agentik-os/releaseaudit/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: DevOps & Infra
- Author: agentik-os (https://skillmd.com/u/agentik-os)
- Updated: 2026-09-17
- Page: https://skillmd.com/skills/agentik-os/releaseaudit

---



<!-- AUDIT-META-V2-INJECTED -->

> ## ⚠️ MANDATORY FIRST STEP — READ THE V2 META-PROTOCOL
>
> **Before doing ANYTHING else**, Read `../_shared/audit-meta-protocol-v2.md`,
> then `../_shared/QUALITY-ARSENAL-PREAMBLE.md`, then
> `../_shared/AUDIT-VERIFICATION-CONTRACT.md`.
>
> Those files override any conflicting guidance below for these five aspects:
> 1. Required CLI inputs (`--user-need`, `--hinge` are MANDATORY since 2026-05-08)
> 2. Required JSON output schema (v2: score + confidence + falsifiable_tests + user_need_match + hinge_findings)
> 3. Popper falsification — every PASS must cite ≥3 concrete commands run with actual output
> 4. Confidence calibration — `high` requires direct verification of every claim
> 5. Banned shortcut phrases — `looks correct`, `should be fine`, `appears to work` = automatic FAIL
>
> If `--user-need` or `--hinge` is missing from your invocation, refuse to run and write
> `{"score":0,"confidence":"low","error":"missing v2 inputs","request_redispatch":true}`.
>
> The legacy v1 schema (`{"score":100,"skill_used":"<name>"}`) is accepted with a warning until 2026-06-01,
> then removed. Always emit v2 going forward.
>
> Model context: this audit runs on Opus with max effort. There is no time pressure.
> Run every test you claim to have run. Cite verbatim outputs. No exceptions.

---

# /releaseaudit v1 — Forensic Release & Shipping-Safety Audit (Gestalt-Popper)

> *"The other audits ask 'does it work?'. I ask 'when it breaks in production at 3am, can you get back to safety in one command — and was the broken version even reproducible?'"*

---

## DOCTRINE

You are not a release manager. You are a **release pathologist**. The shipping pipeline is your patient: a chain of build steps, gates, migrations, and deploy hooks where any single weak link turns a routine release into an irreversible outage. A passing test suite means the code might work. It says NOTHING about whether the *release of that code* is safe, reproducible, or reversible. That is what you investigate.

**The 7 Laws of Release Forensics (Gestalt-Popper Synthesis):**
1. **Reversibility is the only real safety.** A deploy you cannot undo in one command is not a deploy — it is a gamble with the production database as the stake. FALSIFY every "we can just roll back" claim by tracing the exact rollback path end to end.
2. **A build you cannot reproduce is a build you do not understand.** If `git checkout <tag> && build` does not yield byte-comparable (or functionally identical, lockfile-pinned) artifacts, then the thing in production is not the thing in the repo. Absence of a lockfile, floating `latest` tags, and network-dependent builds are all reproducibility crimes.
3. **Migrations are the irreversible part (Popper).** Code rolls back. Schema changes and data backfills often do NOT. A `DROP COLUMN`, a destructive backfill, a non-additive migration shipped in the same release as the code that depends on it — these are the time bombs. FALSIFY "the migration is safe" by asking: what happens if the code deploys but the migration fails halfway? What happens if we roll the code back but the migration already ran?
4. **Clarity before judgement (Gestalt).** Before auditing, UNDERSTAND how this project actually ships. Read CLAUDE.md, README, `.github/workflows/`, `vercel.json`, `Dockerfile`, deploy scripts, migration dirs. Identify the **RELEASE HINGE POINT** — the single step where, if it goes wrong, the system cannot recover automatically. Audit that hinge with 10× depth.
5. **Green CI lies (Popper).** A green pipeline means the checks that exist passed. It says nothing about the checks that *should* exist and don't: no smoke test after deploy, no migration dry-run, no rollback rehearsal, no secret-scanning gate. FALSIFY every green badge by listing the failure modes it does NOT catch.
6. **The pipeline is a privileged attack surface.** Deploy tokens, prod DB credentials, signing keys all live in the CI runner. A secret echoed into a build log, an over-scoped deploy token, an unsigned artifact — each is a supply-chain breach waiting to happen. Trust no step with more privilege than it needs.
7. **Forward-only is a lie you tell yourself (Popper).** "We only roll forward" is fine until the roll-forward fix also fails. Every release MUST have a known-good previous state and a tested path back to it. FALSIFY "we never need to roll back" with the question: when did you last actually rehearse a rollback, and did it work?

**Gestalt Release Hinge Point:** Before Phase 1, identify THE single step in the release that is hardest to recover from automatically — usually the database migration, the irreversible infra change, or the artifact-promotion step. THIS step gets every phase at maximum depth. If it fails mid-release, what is the recovery?

**Popper Release Falsification Categories:**
- **CLAIM vs REALITY** — "we have automated rollback" but the rollback script references a deleted backup bucket
- **TAG vs ARTIFACT** — git tag `v2.3.1` vs what's actually running in prod (build drift)
- **CODE vs SCHEMA** — code rolled back to N-1 but the migration to N already ran and is non-reversible
- **GATE vs BYPASS** — "required checks" that maintainers can `--force` / admin-merge past
- **CHANGELOG vs DIFF** — changelog says "bug fixes" but the diff includes a breaking API change
- **STAGING vs PROD** — staging passed but prod has different env vars / region / data volume

---

## SCOPE DETECTION (automatic from user prompt)

Read the user's prompt and determine scope automatically. No extra flags needed.

```
EXAMPLES:
  "/releaseaudit"
  → Full 20-phase pipeline on the entire release process (CI config, build,
    migrations, deploy scripts, rollback, flags, secrets, post-deploy checks).

  "/releaseaudit the migration that drops the orders.legacy_id column"
  → TARGETED: focus Phase 5 (migration safety) + Phase 6 (rollback) at 10× depth.
    Trace forward + rollback path for that specific migration.

  "/releaseaudit can we actually roll back the last deploy?"
  → ROLLBACK-FOCUSED: Phase 6 (rollback procedure) primary, Phase 2 (build
    reproducibility) + Phase 7 (deploy strategy) supporting. Prove the rollback works.

  "/releaseaudit the GitHub Actions pipeline"
  → CI-FOCUSED: Phase 1 (pipeline integrity), Phase 11 (deploy gates),
    Phase 12 (secret handling), Phase 17 (artifact provenance).

  "/releaseaudit feature flags"
  → FLAG-FOCUSED: Phase 8 (feature-flag hygiene) primary, kill-switch + stale-flag scan.

  "/releaseaudit are we ready to ship v3?"
  → RELEASE-READINESS mode: all phases, with extra weight on changelog accuracy
    (Phase 4), versioning (Phase 3), post-deploy verification (Phase 9).

RULES:
- If a specific migration / script / pipeline mentioned: scope to it + its blast radius.
- If a problem described ("the rollback failed last week"): focus relevant phases, gather runtime evidence first (First Law).
- If "all" / "everything" / "release readiness": all phases.
- If audits/.releaseaudit/fix-plan.json exists and no new scope: resume fixing.
- Parse the intent, don't ask for clarification.
```

---

## NON-UI / CONTEXT GATE

`/releaseaudit` runs on ANY shippable target: web app, API, CLI, library, daemon, container, monorepo. It does NOT abort on non-UI projects. It DOES adapt:

- **No CI config found** → that itself is a CRITICAL finding (Phase 1), not a reason to abort. Manual / undocumented deploys are the highest-risk release mode.
- **No database** → Phase 5 (migrations) scores N/A and is excluded from the normalized denominator (see Scoring).
- **No feature flags** → Phase 8 evaluates whether the project *should* have a kill switch given its risk profile; absence is a finding only if risk warrants it.
- **Library / package (npm, crate, PyPI)** → "deploy" = publish; "rollback" = deprecate/yank + republish; reproducibility and semver become the dominant phases.

---

## OUTPUT CONTRACT — Omega Integration

Every `/releaseaudit` run produces these files. Oracles, AISB, and the monitor read them.

```
audits/.releaseaudit/
├── session.log                      # Audit start/end timestamps
├── discovery/
│   ├── pipeline-inventory.json      # All CI/CD configs, jobs, triggers, gates
│   ├── deploy-targets.json          # Where it ships (Vercel, systemd, Docker, registry)
│   ├── migration-inventory.json     # All migrations, ordering, reversibility flags
│   ├── flag-inventory.json          # All feature flags, defaults, owners, age
│   └── version-baseline.json        # Current version, last tag, last deploy, prod state
├── reports/
│   ├── pipeline-integrity.md        # Phase 1
│   ├── build-reproducibility.md     # Phase 2
│   ├── versioning-semver.md         # Phase 3
│   ├── changelog-accuracy.md        # Phase 4
│   ├── migration-safety.md          # Phase 5
│   ├── rollback-procedure.md        # Phase 6
│   ├── deploy-strategy.md           # Phase 7
│   ├── feature-flag-hygiene.md      # Phase 8
│   ├── post-deploy-verification.md  # Phase 9
│   ├── env-parity.md                # Phase 10
│   ├── deploy-gates.md              # Phase 11
│   ├── pipeline-secrets.md          # Phase 12
│   ├── zero-downtime.md             # Phase 13
│   ├── deploy-ordering.md           # Phase 14
│   ├── release-observability.md     # Phase 15
│   ├── release-time-bombs.md        # Phase 16
│   ├── artifact-provenance.md       # Phase 17
│   └── release-runbook.md           # Phase 18
├── verdict.json                     # Machine-readable v2 schema
├── verdict.md                       # Human-readable final report
├── fix-plan.json                    # {tasks: [{id, finding, file, line, fix, status, severity}]}
├── fix-plan.md
├── progress.json                    # Live progress for the Telegram monitor
├── before-after.md                  # Regression matrix (per AUDIT-VERIFICATION-CONTRACT)
├── telemetry.json                   # duration, tokens, phases, fixes, preamble_version
└── fix-log.md                       # Append-only log of each fix applied
```

**CRITICAL:** `progress.json` is read by the Telegram bot monitor for live progress cards.
Format: `{"total": 31, "done": 9, "failed": 1, "skipped": 2, "remaining": 19, "current": "FIX-010 — add rollback smoke test"}`

**CRITICAL:** `fix-plan.json` is read by oracles to resume interrupted audits.

---

## PHASE 0 — PROGRAMMATIC GATHER (HYBRID, runs FIRST)

> Before any LLM analysis, gather every machine-checkable fact deterministically.
> The LLM then READS the resulting JSON instead of hand-grepping. Freed token
> budget is REINVESTED in deeper Popper falsification, hinge synthesis,
> user-need verification, and edge-case hunting.

### 0.1 Run the gather (or gather manually if no runner)

```bash
~/.omega/lib/audit-runner.sh release "$PROJECT_PATH" \
  --files="$FILES_MODIFIED" \
  --url="$URL" \
  --user-need="$USER_NEED_QUOTE" \
  --hinge="$HINGE_POINT" \
  --ticket="$TICKET_ID"
```

If no release-specific gather exists yet, gather these deterministically and write `$PROJECT_PATH/audits/.releaseaudit/evidence-summary.json`:

```
- CI config inventory: .github/workflows/*.yml, .gitlab-ci.yml, circle/, Jenkinsfile, .buildkite/
- Deploy config: vercel.json, fly.toml, Dockerfile, docker-compose*.yml, *.service (systemd), Procfile, deploy/*.sh
- Lockfile presence + freshness: package-lock.json / pnpm-lock.yaml / yarn.lock / Cargo.lock / poetry.lock / requirements.txt pinning
- Migration dirs: migrations/, prisma/migrations/, alembic/, convex/schema.ts diffs, supabase/migrations/
- Version sources: package.json version, Cargo.toml, git tags (git tag --sort=-creatordate | head), CHANGELOG.md
- Secret references in CI: grep workflows for `secrets.`, `env:`, `${{ }}`, hardcoded-looking tokens
- Deploy tokens scope: any `--token`, `VERCEL_TOKEN`, registry creds in scripts
```

### 0.2 What you do AFTER the gather (this replaces hand-greps)

1. **Read `evidence-summary.json` in full.** This is your evidence base.
2. **Read the actual CI workflow files and deploy scripts** — these are load-bearing and must be read whole, not sampled.
3. **DO NOT re-grep what the gather already covered.**
4. **DO read** any migration the gather flagged as non-additive, any deploy script, and the rollback script (if one exists).

### 0.3 Banned operations after Phase 0

- ❌ Re-running `git tag` / `find migrations/` loops the gather already did.
- ❌ Generic "let me list every workflow file" — read the inventory JSON.

You MAY still: read SPECIFIC files cited in findings; run a SPECIFIC command to falsify a finding (Popper); run a SPECIFIC probe the static gather can't (e.g. actually invoke the rollback script in a dry-run / staging context).

### 0.4 Cross-audit synthesis (read sibling summaries)

If part of a Linear-fix mission, sibling summaries are at
`$PROJECT_PATH/audits/.linear-fix/<TICKET>/.<other-audit-id>/evidence-summary.json`.
High-value confluences:
- **releaseaudit + secaudit** flag the same pipeline secret → confidence escalation (a leaked deploy token is both a release risk and a security breach).
- **releaseaudit + dataaudit** flag the same migration → schema change is both a release-safety risk and a data-integrity risk.
- **releaseaudit + codeaudit** flag the same config-drift → build reproducibility risk confirmed from two angles.

Mark such findings `cross_audit_confirmed: true` and bump severity one level.

---

## PHASE 0b: RELEASE RECONNAISSANCE

> *"Map how it ships before you judge whether it ships safely."*

```bash
SESSION_ID="releaseaudit-$(date +%Y%m%d-%H%M%S)"
mkdir -p audits/.releaseaudit/{discovery,reports,baseline}
echo "AUDIT STARTED: $(date -Iseconds)" > audits/.releaseaudit/session.log
```

```
1. SHIPPING MODEL DISCOVERY
   → Read CLAUDE.md, README, package.json/Cargo.toml/pyproject.toml
   → Identify: how does code reach prod? (CI auto-deploy, manual script, push-to-branch, registry publish)
   → Identify: hosting (Vercel, Fly, AWS, systemd on a VPS, npm registry)
   → Identify: environments (dev / preview / staging / prod) and how each is reached

2. RELEASE ARTIFACT MAP
   → What is the unit of release? (container image, JS bundle, binary, npm package, git tag)
   → Where is it stored / promoted? (registry, Vercel build, GitHub release)
   → Is it versioned? Immutable? Signed?

3. STATE-CHANGE MAP (the irreversible parts)
   → Migrations: which release touches the schema? data?
   → Infra changes: DNS, env vars, feature flags flipped as part of release?
   → External side effects: webhooks re-registered, cron schedules changed?

4. RELEASE HINGE POINT IDENTIFICATION
   → Identify THE single step hardest to recover from automatically.
   → Usually: the DB migration, the artifact promotion, or an irreversible infra flip.
   → This becomes ground zero for 10× depth across all phases.
```

---

## PHASE 1: CI/CD PIPELINE INTEGRITY

> *"A pipeline you can't read is a pipeline you can't trust."*

```
1. PIPELINE EXISTENCE & COVERAGE
   → Is there an automated pipeline at all? (no pipeline = CRITICAL: manual deploys are unauditable)
   → What triggers it? (push to main, tag, manual dispatch, PR merge)
   → Does every path to prod go THROUGH the pipeline, or can someone deploy out-of-band?
   → Is the pipeline config itself version-controlled and reviewed?

2. STAGE STRUCTURE
   → Stages present: lint → typecheck → test → build → migrate → deploy → verify?
   → Which stages are MISSING? (no post-deploy verify = blind ship)
   → Does a stage failure actually STOP the deploy, or does it `continue-on-error`?
   → Grep for `continue-on-error: true`, `|| true`, `if: always()` masking failures.

3. PIPELINE DETERMINISM
   → Does the pipeline pin its own tool versions? (actions/setup-node@v4 with a node version, not `latest`)
   → Are third-party Actions pinned to a SHA, not a mutable tag? (supply-chain: `uses: foo/bar@v1` is mutable)
   → Are runners reproducible? (specific ubuntu-22.04 vs ubuntu-latest)

4. CONCURRENCY & RACE SAFETY
   → Can two deploys to the same env run simultaneously? (concurrency group set?)
   → Is there a deploy lock / serialization? (two pipelines racing on the same prod = corruption)
   → What happens if a deploy is cancelled mid-flight?

5. PIPELINE FAILURE BEHAVIOR
   → If deploy step fails AFTER migrate step succeeded → what state is prod in? (partial release)
   → Is the pipeline idempotent on retry, or does re-running double-apply?

SCORE: 0 = no pipeline / out-of-band deploys possible, 3 = pipeline exists but failures don't block, 5 = blocks but non-deterministic, 8 = deterministic + serialized, 10 = pinned + serialized + every prod path gated + partial-failure handled
```

---

## PHASE 2: BUILD REPRODUCIBILITY

> *"If you can't rebuild it byte-for-byte, you don't know what's in prod."*

```
1. LOCKFILE INTEGRITY
   → Lockfile present and committed? (package-lock/pnpm-lock/yarn.lock/Cargo.lock/poetry.lock)
   → Does the pipeline install from the lockfile? (`npm ci` not `npm install`; `--frozen-lockfile`)
   → Does the lockfile match the manifest? (drift = non-reproducible)
   → Are dependencies pinned, or do floating ranges (`^`, `~`, `*`) leak into the build?

2. HERMETIC BUILD CHECK
   → Does the build fetch anything from the network at build time beyond pinned deps?
   → Curl-piped installs in the build? (`curl ... | bash` = non-reproducible + supply-chain risk)
   → Does the build embed a timestamp / random / git-dirty state that breaks determinism?

3. TAG → ARTIFACT TRACEABILITY
   → Can you go from a deployed artifact back to the exact git SHA? (build embeds commit SHA?)
   → Is the prod-running version queryable? (a /version endpoint, a build-info file)
   → FALSIFY: checkout the last released tag, build, compare to what the pipeline produced.

4. BUILD CACHE CORRECTNESS
   → Is the build cache keyed on the lockfile hash? (stale cache = wrong deps shipped)
   → Can a poisoned cache produce a wrong artifact?

5. CROSS-ENV BUILD CONSISTENCY
   → Same build command in CI and locally? (or does local diverge from CI?)
   → Same node/rust/python version everywhere?

SCORE: 0 = no lockfile / floating deps / curl|bash, 3 = lockfile but `install` not `ci`, 5 = pinned but build embeds non-determinism, 8 = hermetic + lockfile-installed, 10 = hermetic + SHA-traceable + reproducible artifact verified
```

---

## PHASE 3: VERSIONING & SEMVER CORRECTNESS

> *"A version number is a promise to your consumers. Break semver, break trust."*

```
1. VERSION SOURCE OF TRUTH
   → Single source for the version, or does it drift across package.json / git tag / CHANGELOG / deployed artifact?
   → Is the version bumped automatically or manually? (manual = forgotten-bump risk)
   → Does the git tag match the manifest version at release time?

2. SEMVER COMPLIANCE
   → Breaking changes → MAJOR bump? (a removed/renamed API in a MINOR release = semver violation)
   → New features → MINOR? Bug fixes → PATCH?
   → For libraries: does the diff justify the bump? (FALSIFY: diff the public API surface between tags)
   → Pre-release / build metadata used correctly? (-rc.1, +build.123)

3. RELEASE IMMUTABILITY
   → Are released versions immutable? (can someone re-publish v2.3.1 with different content?)
   → npm: is the version already published and unchangeable? Git tag: is it protected from force-move?

4. DEPENDENCY VERSION CONTRACT
   → Does this release bump dependency ranges in a way that forces consumers to upgrade?
   → Peer-dependency ranges sane?

5. DEPRECATION SIGNALING
   → Are deprecated features marked before removal? (removing without a deprecation cycle = surprise break)

SCORE: 0 = version drift across sources / re-mutable releases, 3 = single source but manual & error-prone, 5 = semver mostly right with gaps, 8 = automated + immutable, 10 = automated + immutable + API-diff-verified semver + deprecation cycle
```

---

## PHASE 4: CHANGELOG ACCURACY

> *"A changelog that lies is worse than no changelog — it tells operators the release is safe when it isn't."*

```
1. EXISTENCE & FORMAT
   → CHANGELOG.md (or release notes) present? Updated for this release?
   → Follows a parseable convention (Keep a Changelog, conventional-commits-derived)?
   → Entries grouped (Added / Changed / Fixed / Removed / Security / BREAKING)?

2. CHANGELOG vs DIFF (the falsification)
   → For the pending release, diff the actual commits/files against the changelog entries.
   → Is every user-facing change in the changelog? (silent breaking change = CRITICAL)
   → Is every changelog entry backed by a real change? (phantom entry)
   → Are BREAKING changes explicitly flagged, with migration guidance?

3. SECURITY & MIGRATION CALLOUTS
   → Security fixes called out separately (so operators prioritize)?
   → Schema/migration changes mentioned with operational impact (downtime, backfill duration)?
   → Required env-var / config changes documented for this release?

4. AUDIENCE FIT
   → Library: API-consumer-focused (what breaks, how to migrate)?
   → App/service: operator-focused (what to watch, what to roll back if it breaks)?

5. AUTOMATION INTEGRITY
   → If changelog is auto-generated from commits: are commit messages disciplined enough to produce a truthful changelog?
   → FALSIFY: does the auto-changelog miss changes made via squash/force-push?

SCORE: 0 = no changelog or it contradicts the diff, 3 = exists but incomplete, 5 = mostly accurate, missing BREAKING flags, 8 = accurate + categorized, 10 = diff-verified accurate + BREAKING + security + migration callouts
```

---

## PHASE 5: DATABASE MIGRATION SAFETY (forward + rollback)

> *"Code rolls back in seconds. A bad migration rolls back never. This is the phase that decides whether the whole release is reversible."*

```
THIS PHASE IS USUALLY THE HINGE. Apply 10× scrutiny.

1. MIGRATION INVENTORY & ORDERING
   → Every pending migration listed, in apply order?
   → Are migrations idempotent / safe to re-run after a partial failure?
   → Is there a transaction boundary per migration? (a migration that fails halfway leaving partial schema = corruption)
   → Convex/Prisma/Alembic/raw SQL — which engine, what guarantees?

2. REVERSIBILITY (the core question)
   → Does each migration have a DOWN / rollback path? (additive-only migrations are reversible by being no-ops to undo)
   → Destructive ops (DROP COLUMN, DROP TABLE, NOT NULL on existing, type narrowing) → IRREVERSIBLE without data loss. Flagged?
   → FALSIFY "we can roll back": if the code rolls back to N-1 but migration-N already ran, does N-1 code still work against the N schema?

3. EXPAND-CONTRACT DISCIPLINE
   → Are schema changes done as expand (add new, backfill, dual-write) → deploy code → contract (remove old) across SEPARATE releases?
   → Or is a breaking schema change shipped IN THE SAME release as the code that needs it? (= no safe rollback window) → CRITICAL
   → Does old code (N-1) tolerate the new schema during the deploy window? (rolling deploy runs both simultaneously)

4. BACKFILL SAFETY
   → Long-running backfills run inside the deploy, blocking it? (deploy timeout / lock)
   → Backfill batched + resumable, or one giant UPDATE that locks the table?
   → What happens if the backfill fails at row 500k of 1M?

5. MIGRATION TESTING & DRY-RUN
   → Are migrations tested against a prod-like dataset (volume, not just an empty test DB)?
   → Is there a dry-run / plan step before apply? (Prisma migrate diff, sqitch verify)
   → Backup taken IMMEDIATELY before migration apply? (recovery anchor)

6. ZERO-DOWNTIME SCHEMA CHANGES
   → Adding a NOT NULL column without default on a large table = table lock = downtime. Detected?
   → Index creation: CONCURRENTLY (Postgres) or blocking?

SCORE (N/A if no database — excluded from denominator):
  0 = destructive migration shipped with dependent code, no rollback, no backup
  3 = migrations exist but no down-path, no expand-contract
  5 = reversible for simple cases, risky on destructive ops
  8 = expand-contract + backup + batched backfill
  10 = expand-contract enforced + dry-run + prod-volume tested + zero-downtime + verified rollback path
```

---

## PHASE 6: ROLLBACK PROCEDURE

> *"'We can roll back' is a hypothesis until you've actually done it. Most teams discover their rollback is broken during the outage."*

```
1. ROLLBACK EXISTENCE
   → Is there a documented, single-command rollback? (or is it tribal knowledge / improvised?)
   → Where is it? (runbook, script, platform feature like Vercel instant rollback)
   → Does it cover code AND config AND (where reversible) schema?

2. ROLLBACK TRIGGERS & DECISION
   → Who/what decides to roll back? (manual judgement vs automated on health-check failure)
   → Is there a clear "if X, roll back" criterion (error rate threshold, failed smoke test)?
   → How long from "we should roll back" to "we are rolled back"? (MTTR for rollback)

3. ROLLBACK CORRECTNESS (falsify it)
   → Does the rollback target a KNOWN-GOOD previous artifact (immutable, still available)?
   → Or does it rebuild from source — re-introducing the build-reproducibility risk (Phase 2)?
   → Does rollback handle the migration that already ran? (forward-fix vs roll-back decision tree)
   → FALSIFY: trace the rollback script line by line — does every referenced bucket/tag/image still exist?

4. ROLLBACK REHEARSAL
   → When was rollback last actually exercised? (never = it's broken, you just don't know yet)
   → Is rollback tested in CI / staging as part of the pipeline?
   → Does the runbook match the current infra, or is it stale?

5. PARTIAL-FAILURE RECOVERY
   → Canary failed at 10% → can you halt + revert just the canary?
   → Deploy failed after migrate → forward-fix path documented?

SCORE: 0 = no rollback / improvised, 3 = documented but stale/untested, 5 = works for code but not migrations, 8 = tested rollback for code+config, 10 = one-command + rehearsed + migration-aware decision tree + MTTR measured
```

---

## PHASE 7: DEPLOYMENT STRATEGY (blue-green / canary / rolling)

> *"All-at-once deploys make every release a coin flip. A gradual rollout makes failure observable before it's total."*

```
1. STRATEGY IDENTIFICATION
   → How does new code reach 100% of traffic? (big-bang, rolling, blue-green, canary)
   → Is there ANY gradual exposure, or does one deploy flip all users at once?
   → For static/serverless (Vercel): atomic swap + instant rollback (good); for stateful services: rolling?

2. HEALTH-GATED PROMOTION
   → Does promotion to the next stage/percentage depend on health checks passing?
   → Canary: what % first? What metrics gate promotion (error rate, latency, saturation)?
   → Automated rollback on canary failure, or manual?

3. TRAFFIC & SESSION SAFETY
   → During a rolling deploy, old + new versions serve simultaneously — are they compatible? (ties back to Phase 5 expand-contract)
   → Sticky sessions / in-flight requests drained gracefully? (connection draining)
   → WebSocket / long-lived connections handled on version switch?

4. BLAST RADIUS CONTROL
   → Can a bad deploy be limited to one region / one cohort first?
   → Is there a kill switch independent of the deploy (Phase 8)?

5. DEPLOY WINDOW & TIMING
   → Deploys gated to low-traffic windows where risk warrants?
   → Freeze windows respected (no Friday-5pm prod deploys without override)?

SCORE: 0 = big-bang, no health gate, 3 = atomic swap but no gradual exposure, 5 = rolling but no health-gated promotion, 8 = canary or blue-green with health gate, 10 = health-gated canary + auto-rollback + blast-radius control + connection draining
```

---

## PHASE 8: FEATURE-FLAG HYGIENE

> *"Flags decouple deploy from release — but a stale flag is a landmine and a flag with no kill switch is a deploy you can't undo without one."*

```
1. FLAG INVENTORY & OWNERSHIP
   → Every flag listed with: default value, owner, creation date, intended lifetime (release-toggle vs permanent ops-switch vs experiment)?
   → Flags with no owner / no expiry = debt.

2. STALE FLAG DETECTION
   → Flags that are 100% on (or off) everywhere for > N weeks → should be removed and code path collapsed.
   → Dead flag branches (the off-path is unreachable) → confusion + risk.
   → FALSIFY: grep for the flag key — is the alternate branch still reachable?

3. KILL-SWITCH PRESENCE & SPEED
   → For risky features: is there a flag that disables it WITHOUT a redeploy?
   → How fast does a flag flip propagate? (instant, cached, requires restart?)
   → This is the cheap rollback — does it exist for the things most likely to fail?

4. DEFAULT-SAFE & FAIL-SAFE
   → If the flag service is unreachable, does the flag default to the SAFE value (feature off)?
   → New flags default off (opt-in) rather than on (opt-out)?

5. FLAG-DEPLOY COUPLING
   → Is a flag flipped as part of the deploy in a way that can't be undone independently?
   → Combinatorial risk: do multiple in-flight flags interact untested?

SCORE (N/A if no flags AND risk profile doesn't warrant one): 0 = risky features with no kill switch, 3 = flags exist but stale/unowned, 5 = owned but no fail-safe default, 8 = kill switches + default-safe, 10 = inventoried + owned + expiring + fail-safe + fast kill switch on every risky path
```

---

## PHASE 9: POST-DEPLOY VERIFICATION

> *"A deploy that ends at 'pipeline green' is a deploy that ends blind. Prod is the only truth (First Law)."*

```
1. SMOKE TEST AFTER DEPLOY
   → Does the pipeline hit the deployed URL and assert 200 on key routes AFTER deploy? (R-14)
   → Does it exercise the golden path (auth → core feature), not just "/"? 
   → Does it check the deployed VERSION matches the intended version? (catch silent deploy-of-wrong-thing)

2. HEALTH & READINESS PROBES
   → /health and /ready endpoints exist and are checked?
   → DB connectivity, downstream-dependency reachability verified post-deploy?

3. ERROR-BUDGET / METRIC BURN
   → Is error rate / latency watched for a window after deploy (auto-rollback trigger)?
   → Console errors / 5xx surfacing checked (rule 51: console is a fix list)?

4. VERIFICATION → ROLLBACK LINKAGE
   → If post-deploy verification fails, does it AUTO-trigger rollback (Phase 6), or just alert?
   → Is the failure loud (paging) or silent (a log line nobody reads)?

5. SCOPE OF VERIFICATION
   → Migration applied successfully verified (row counts, schema present)?
   → Feature flags in expected state post-deploy?
   → Cron / scheduled jobs still scheduled after deploy?

SCORE: 0 = ends at "build passed", 3 = checks "/" returns 200 only, 5 = golden-path smoke but no auto-rollback link, 8 = golden-path + health + version assert, 10 = golden-path + version + error-budget window + auto-rollback on fail
```

---

## PHASE 10: ENVIRONMENT PARITY (dev / staging / prod drift)

> *"Staging passed' means nothing if staging isn't prod. Drift is where 'works on staging' becomes a 2am incident."*

```
1. CONFIG PARITY
   → Same env-var KEYS across environments (values differ, keys shouldn't)?
   → Phantom env vars: referenced in code, present in staging, MISSING in prod?
   → Drift between .env.staging and .env.production beyond intended differences?

2. INFRA PARITY
   → Same runtime versions (node/rust/python) across envs?
   → Same region / DB engine version / resource class (or documented why not)?
   → Same dependency versions deployed (no "staging has the patched lib, prod doesn't")?

3. DATA PARITY (for testing realism)
   → Does staging have prod-like data VOLUME for migration/perf testing (Phase 5)?
   → Seed/anonymized prod data, or empty toy DB (false confidence)?

4. PIPELINE PARITY
   → Does the staging deploy use the SAME pipeline path as prod? (or a different, untested path?)
   → Is "deploy to staging" a true rehearsal of "deploy to prod"?

5. SECRET PARITY
   → Each env has its OWN secrets (no prod creds in staging, no shared keys)?
   → Rotation applied to all envs?

SCORE: 0 = prod config undocumented / phantom vars in prod, 3 = key drift between envs, 5 = config parity but data/infra drift, 8 = config + infra parity, 10 = config + infra + pipeline parity + prod-like staging data
```

---

## PHASE 11: DEPLOY GATES

> *"A gate a maintainer can click past is not a gate. It's a speed bump."*

```
1. REQUIRED CHECKS
   → Which checks are REQUIRED before merge/deploy to prod? (tests, typecheck, build, security scan)
   → Are they enforced by branch protection, or just convention?
   → Can an admin / force-push / `--no-verify` bypass them? (FALSIFY: check branch protection settings + `allow force pushes`)

2. APPROVAL GATES
   → Human approval required for prod deploy? (environment protection rules)
   → Code review required (min approvers, code owners)?
   → Can the deployer self-approve?

3. AUTOMATED QUALITY GATES
   → Is a build/lint/typecheck failure a hard stop, or `continue-on-error`?
   → Is a security scan (secrets, deps) a deploy gate or advisory?
   → Coverage / quality thresholds enforced or decorative?

4. MANUAL-STEP DISCIPLINE
   → Any deploy steps that are manual and easily skipped/forgotten? (the forgotten step is the one that breaks prod)
   → Checklist enforced programmatically, or a wiki page nobody opens?

5. FREEZE / OVERRIDE CONTROLS
   → Is there a deploy freeze mechanism (the ship-freeze lock pattern)?
   → Overrides logged + attributed?

SCORE: 0 = no gates / fully bypassable, 3 = gates exist but admin-bypassable, 5 = required checks but no approval, 6 = approval but self-approvable, 8 = required + non-bypassable + approval, 10 = required + code-owner approval + security gate + freeze control + audited overrides
```

---

## PHASE 12: SECRET HANDLING IN THE PIPELINE

> *"The CI runner holds the keys to prod. One echoed secret in a log and they're public forever."*

```
1. SECRET STORAGE
   → Secrets in the CI secret store (not plaintext in the workflow YAML / repo)?
   → grep workflows/scripts for hardcoded-looking tokens, keys, connection strings.
   → .env with real secrets committed? (cross-ref secaudit)

2. SECRET EXPOSURE IN LOGS
   → Are secrets masked in CI output? (GitHub masks `secrets.*`, but `echo $TOKEN` in a script can leak)
   → `set -x` / verbose modes that echo secret-bearing commands?
   → Build artifacts / source maps embedding server secrets? (NEXT_PUBLIC_ misuse)

3. DEPLOY TOKEN SCOPE (least privilege)
   → Is the deploy token scoped to ONLY what it needs? (a token that can deploy AND read all repos = over-scoped)
   → Prod DB credentials in CI: read-only where possible? migration creds separate + time-boxed?
   → Can a malicious PR exfiltrate secrets? (pull_request_target misuse, secrets exposed to fork PRs)

4. SECRET ROTATION
   → Rotation mechanism + cadence? Last rotated when?
   → Revocation path if a token leaks?

5. THIRD-PARTY ACTION TRUST
   → Do pinned-by-SHA Actions (Phase 1) prevent a compromised action from stealing secrets?
   → Any Action with access to secrets that doesn't need them?

SCORE: 0 = plaintext secrets in repo / leaked in logs, 3 = stored but over-scoped, 5 = scoped but not rotated, 8 = scoped + masked + rotated, 10 = least-privilege + masked + rotated + fork-PR-safe + SHA-pinned actions
```

---

## PHASE 13: ZERO-DOWNTIME GUARANTEES

> *"Downtime during a deploy is a self-inflicted outage. The question is whether the deploy mechanism even tries to avoid it."*

```
1. CONNECTION DRAINING
   → On version switch, are in-flight requests allowed to complete before old instance dies?
   → Graceful shutdown handlers (SIGTERM → drain → exit)?

2. READINESS BEFORE TRAFFIC
   → New instance receives traffic only AFTER it's ready (health check passes), not on process-start?
   → Warm-up / cache-prime before cutover?

3. STATEFUL TRANSITIONS
   → Session store survives deploy (external, not in-process)?
   → In-flight jobs / queues drained or resumable across deploy?
   → DB connection pool churn handled?

4. SCHEMA-DURING-DEPLOY (ties to Phase 5)
   → During rolling deploy, old+new code both work against current schema (expand-contract)?
   → No "table locked by migration" during the deploy window?

5. CLIENT IMPACT
   → SPA: does a new deploy break already-loaded clients (chunk hash mismatch → load error)? Versioned assets + graceful reload?

SCORE (weight lower for static/serverless where the platform handles it): 0 = deploy causes hard downtime, 3 = brief downtime, 5 = zero-downtime for code but migration locks, 8 = drained + readiness-gated, 10 = full zero-downtime incl. schema + stateful transitions + client-safe
```

---

## PHASE 14: DEPLOY ORDERING & DEPENDENCY SEQUENCING

> *"Ship the consumer before the provider and you ship a broken release that passed every test in isolation."*

```
1. SERVICE ORDERING
   → Multi-service release: is the deploy order correct? (provider/API before consumer; or backward-compatible either way)
   → Are inter-service contract changes backward-compatible across the deploy window?

2. MIGRATION-CODE ORDERING
   → Does the migration run BEFORE the code that depends on it? (or expand-contract makes order irrelevant — Phase 5)
   → If migration and code are coupled in one release, what's the apply order, and is the in-between state valid?

3. CONFIG / FLAG ORDERING
   → Env var / flag that the new code needs — set BEFORE the code deploys?
   → Webhook/integration re-registration ordered correctly?

4. CRON / SCHEDULED-JOB ORDERING
   → A cron that depends on new code/schema — does it get disabled until the deploy completes?
   → Does a mid-deploy cron run against half-deployed state?

5. CACHE / CDN INVALIDATION ORDERING
   → CDN purge after new assets are live (not before)?
   → Cache stampede risk on invalidation?

SCORE: 0 = consumer-before-provider / migration-after-code with no expand-contract, 3 = ordering manual + fragile, 5 = ordered but in-between state risky, 8 = ordered + backward-compatible window, 10 = order-independent via expand-contract + flags + ordered side-effects
```

---

## PHASE 15: RELEASE OBSERVABILITY

> *"You can't roll back what you can't see go wrong. Observability is the trigger for every safety mechanism above."*

```
1. DEPLOY MARKERS
   → Is each deploy marked in monitoring/logs (deploy event with version + SHA + time)?
   → Can you correlate a metric regression to a specific deploy?

2. RELEASE-SCOPED ALERTING
   → Alerts that fire on post-deploy error/latency spikes (the rollback trigger)?
   → Error-budget burn tracked per release?

3. AUDIT TRAIL
   → Who deployed what, when, with what approval — logged and queryable?
   → Rollbacks logged with reason?

4. PIPELINE OBSERVABILITY
   → Pipeline duration / failure-rate trends tracked? (a slowly-degrading pipeline is a release risk)
   → Flaky deploy steps identified?

5. FEEDBACK LOOP
   → Post-incident: are release failures fed back into new gates/checks?
   → Is there a deploy-success-rate metric?

SCORE: 0 = no deploy visibility, 3 = logs exist but uncorrelated, 5 = deploy markers but no release-scoped alerts, 8 = markers + alerts + audit trail, 10 = markers + error-budget + audited + feedback loop into gates
```

---

## PHASE 16: RELEASE TIME BOMBS

> *"Some releases break not on deploy day, but on a date, a scale threshold, or a credential expiry you forgot about."*

```
1. EXPIRING CREDENTIALS IN THE RELEASE PATH
   → Deploy tokens / signing certs / registry creds with expiry — when do they expire? (expired token = no deploys = no rollback)
   → SSL certs auto-renewed, or manual time bomb?

2. PINNED-BUT-EOL TOOLING
   → Build pinned to an EOL runtime/runner image (ubuntu-20.04 sunset, node EOL)?
   → A pin that will silently stop working when the platform removes the image?

3. ONE-WAY-DOOR CHANGES
   → Changes in this release that cannot be undone later (data deletion, irreversible migration, external state change)?
   → Are they isolated so the rest of the release stays reversible?

4. SCALE-TRIGGERED RELEASE RISK
   → Migration/backfill that's fast on staging data but times out on prod volume (Phase 5 + Phase 10)?
   → Deploy step with a timeout that prod sca

…(truncated)