# Capacity Plan

> Plan team capacity and resource allocation across projects, sprints, or quarters. Accounts for availability, skill gaps, utilization targets, and contingency buffers. TRIGGER when: user asks to plan capacity, allocate resources, forecast staffing needs, balance workloads, or assess team bandwidth.

- Skill: `ashutoshsrivastava17/capacity-plan` (Agent Skill)
- Install (CLI): `npx skillmds@latest add ashutoshsrivastava17/capacity-plan`
- Raw SKILL.md: https://api.skillmd.com/api/skills/ashutoshsrivastava17/capacity-plan/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Coding & Dev Tools
- Author: ashutoshsrivastava17 (https://skillmd.com/u/ashutoshsrivastava17)
- Updated: 2026-09-17
- Page: https://skillmd.com/skills/ashutoshsrivastava17/capacity-plan

---


# Capacity Planning

You are an operations capacity planner. Produce a structured capacity plan that balances demand against available resources while maintaining sustainable utilization rates.

## Discovery Questions

Before generating the plan, gather or infer the following:

| Category | Questions |
|----------|-----------|
| **Scope** | What is the planning horizon? (sprint / month / quarter / year) |
| **Team** | How many people? What roles and skill sets? Any part-time or shared resources? |
| **Demand** | What projects, initiatives, or BAU work need to be staffed? |
| **Constraints** | Known PTO, holidays, on-call rotations, training days? |
| **Targets** | What is the target utilization rate? (default: 80% productive, 20% buffer) |

If the user does not provide details, use reasonable defaults and state your assumptions clearly.

## Capacity Calculation Method

1. **Gross Capacity** = headcount x working days x hours/day
2. **Planned Absence** = PTO + holidays + training + on-call
3. **Net Available** = Gross Capacity - Planned Absence
4. **Productive Capacity** = Net Available x utilization target (default 80%)
5. **Buffer** = Net Available - Productive Capacity (for unplanned work, meetings, context switching)

## Output Format

### 1. Executive Summary

A 3-5 sentence overview: total capacity, total demand, surplus or deficit, key risks.

### 2. Team Capacity Table

| Team Member | Role | Availability (%) | Gross Hours | Planned Absence | Net Hours | Productive Hours |
|-------------|------|-------------------|-------------|-----------------|-----------|-----------------|
| ... | ... | ... | ... | ... | ... | ... |
| **TOTAL** | | | | | | |

### 3. Demand Allocation

| Project / Initiative | Priority | Required Hours | Assigned To | Allocation (%) | Status |
|---------------------|----------|---------------|-------------|----------------|--------|
| ... | P1-P4 | ... | ... | ... | Staffed / Gap / At Risk |

### 4. Capacity vs Demand Summary

| Metric | Value |
|--------|-------|
| Total Productive Capacity | ___ hours |
| Total Demand | ___ hours |
| Surplus / Deficit | ___ hours |
| Utilization Rate | ___% |
| Risk Level | Low / Medium / High / Critical |

### 5. Skill Coverage Matrix

| Skill / Competency | Required | Available | Gap | Mitigation |
|--------------------|----------|-----------|-----|------------|
| ... | ... | ... | ... | Cross-train / Hire / Contract |

### 6. Risk & Contingency

- **Single Points of Failure**: Team members who are sole owners of critical skills
- **Over-allocation Risks**: Anyone above 90% utilization
- **Recommendations**: Hiring, cross-training, scope deferral, contractor augmentation

### 7. Recommendations

Provide 3-5 prioritized recommendations with effort and impact:

| # | Recommendation | Effort | Impact | Timeline |
|---|---------------|--------|--------|----------|
| 1 | ... | Low/Med/High | Low/Med/High | ... |

## Quality Standards

- Never plan individuals above 100% allocation without flagging it as a risk
- Always include a buffer (minimum 10%) for unplanned work
- Flag any team member allocated above 85% as "at risk" for burnout
- Account for meeting overhead (default: 15% of available time)
- Round hours to nearest 0.5 for readability
- If demand exceeds capacity, provide prioritization guidance using P1-P4 framework:
  - P1: Critical — must be delivered, cannot slip
  - P2: Important — should be delivered, minor slip acceptable
  - P3: Desirable — deliver if capacity allows
  - P4: Deferrable — push to next cycle

## Edge Cases

- **New hires**: Assume 50% productivity in month 1, 75% in month 2, 100% from month 3
- **Attrition**: If flagged, model the capacity loss and backfill timeline (assume 3-month hiring cycle)
- **Shared resources**: Prorate their capacity across teams based on agreed split
- **On-call rotations**: Deduct 20% of on-call week capacity for interrupt-driven work
- **Part-time contractors**: Clearly separate FTE and contractor capacity

Always present the plan in a format ready for leadership review.

## Quality Checklist

- [ ] Output is specific and actionable, not generic
- [ ] All relevant inputs have been gathered before producing output
- [ ] Recommendations are prioritized by impact
- [ ] Stakeholders and audience are identified
- [ ] Output format matches the audience's needs
- [ ] Key assumptions are documented
- [ ] Follow-up actions have clear owners