# Igce Builder Cr

> Cost-reimbursement IGCE scaffold for CPFF, CPAF, and CPIF with fee caps and estimated-cost structure (BLS + CALC+ + per diem MCPs). USE WHEN the user asks to "build a CPFF IGCE", "cost reimbursement estimate", "CPAF fee cap", "CPIF incentive structure", "CR IGCE", or "estimated cost plus fee". DO NOT USE FOR FFP (`igce-builder-ffp`) or T&M (`igce-builder-lh-tm`).

- Skill: `bdm-15/igce-builder-cr` (Agent Skill)
- Install (CLI): `npx skillmds@latest add bdm-15/igce-builder-cr`
- Raw SKILL.md: https://api.skillmd.com/api/skills/bdm-15/igce-builder-cr/raw
- Safety review: PASS (external: skill-scanner PASS, skillspector PASS)
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Coding & Dev Tools
- License: MIT
- Author: BdM-15 (https://skillmd.com/u/bdm-15)
- Updated: 2026-08-19
- Page: https://skillmd.com/skills/bdm-15/igce-builder-cr

---

# IGCE Builder — Cost-Reimbursement

## Capture-insights adapter (contractor seat)

**Run** from Agent Skills or chat — mirrors [1102tools IGCE Builder CR](https://1102tools.com/tools) for **bidder** estimated-cost + fee planning.

- **Detects** CPFF / CPAF / CPIF signals from vault clause text.
- **Fee caps:** CPFF 10%, CPAF ~6% base, CPIF incentive envelope (documented in JSON).
- **Outputs:** `03_capture/igce_cr.json`, `.md`, `.xlsx`.

## When to Use

- "CPFF estimated cost + fee buildup."
- "Cost-reimbursement IGCE scaffold."
- "What fee headroom under FAR 16.306?"

## Operating Discipline

- Separate **estimated cost** (direct + ODC proxy) from **fee** line.
- Cite inferred CR type and cap in `totals.fee_cap_note`.
- Contractor uses this to sanity-check proposal cost volume — not to file a government IGCE.
