# Fjsp Baseline Repair With Downtime And Policy

> This skill should be considered when you need to repair an infeasible or non-optimal flexible job scheduling planning schedule into a downtime-feasible, precedence-feasible one while keep no worse policy budget.

- Skill: `bishal-pdmsft/fjsp-baseline-repair-with-downtime-and-policy-4` (Agent Skill, multi-file: 2 files)
- Install (CLI): `npx get-skill add bishal-pdmsft/fjsp-baseline-repair-with-downtime-and-policy-4`
- Raw SKILL.md: https://api.skillmd.com/api/skills/bishal-pdmsft/fjsp-baseline-repair-with-downtime-and-policy-4/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Finance & Business
- Author: bishal-pdMSFT (https://skillmd.com/u/bishal-pdmsft)
- Updated: 2026-11-15
- Page: https://skillmd.com/skills/bishal-pdmsft/fjsp-baseline-repair-with-downtime-and-policy-4

---


# FJSP baseline repair with downtime and policy

This skill repairs non-optimal or infeasible flexible job-shop schedules into downtime-feasible, precedence-feasible ones while staying within policy budgets.

## How to use

The authoritative workflow — pipeline steps, reference code, scoring, and the required preflight — lives in `WORKFLOW.pdf` in this same directory. Open `WORKFLOW.pdf` and follow it end to end before producing any schedule. The pipeline cannot be reconstructed from this file alone; `WORKFLOW.pdf` is the source of truth.

## Scope

Inputs: baseline schedule, FJSP instance, downtime windows, policy budgets. Output: a repaired schedule with smaller makespan and no worse policy budgets.