# Safe AI Dlc

> Plan and run programs using the SAFe x AI-DLC fusion. Use when turning an audit, epic, or initiative into Linear structure (initiative, projects, milestones, issues, sub-issues), organizing work as Units of Work and Bolts, wiring a dependency DAG, or running a Bolt swarm with a human-in-the-loop gate. Applies when work spans multiple issues and needs cadence, not just a single ticket.

- Skill: `bybren-llc/safe-ai-dlc` (Agent Skill, multi-file: 2 files)
- Install (CLI): `npx skillmds@latest add bybren-llc/safe-ai-dlc`
- Raw SKILL.md: https://api.skillmd.com/api/skills/bybren-llc/safe-ai-dlc/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Security
- Author: bybren-llc (https://skillmd.com/u/bybren-llc)
- Updated: 2026-09-10
- Page: https://skillmd.com/skills/bybren-llc/safe-ai-dlc

---


# SAFe x AI-DLC Skill

> **📋 TEMPLATE**: This skill uses `{{TICKET_PREFIX}}` and `{{MAIN_BRANCH}}` as placeholders.
> Replace with your project's ticket prefix (e.g., `WOR`, `PROJ`) and base branch (e.g., `dev`, `main`).

## Purpose

Encode the SAFe x AI-DLC fusion so agents structure multi-issue programs consistently: SAFe supplies
the hierarchy and guardrails, AI-DLC supplies the cadence and the human checkpoint. Inside a program
that adopts this fusion, sprints give way to **Bolts**, because agent teams elaborate, build, and
verify in hours rather than weeks. Adopting the fusion is a per-program choice; the standard sprint
path stays valid, and single isolated tickets route to `safe-workflow` instead.

## When This Skill Applies

Invoke this skill when:

- Turning an audit, epic, or initiative into an executable program
- Structuring work in Linear as initiative, projects, milestones, issues, and sub-issues
- Breaking an initiative into Units of Work and sequencing them into Bolts
- Wiring dependencies so gates land before the fixes they verify
- Running a Bolt: elaborate, validate with the human, construct, verify gates are real, evidence, merge

Do NOT use it for a single isolated ticket with no program context — use `safe-workflow` for that.

## The Fusion Model

SAFe gives hierarchy, WSJF, roles, DoD, and dependencies. AI-DLC gives cadence (Bolts) and the
human-in-the-loop. See `docs/guides/SAFE-AI-DLC-METHODOLOGY.md` for the full rationale.

| SAFe               | AI-DLC                                | Linear                                    |
| ------------------ | ------------------------------------- | ----------------------------------------- |
| Portfolio Epic     | The Program                           | Initiative                                |
| Epic/value stream  | Program stream                        | Sub-initiative, or project priority       |
| Feature            | Unit of Work                          | Project                                   |
| PI increment       | Bolt                                  | `bolt:N` label + target date              |
| Phase gate         | Inception / Construction / Operations | Project Milestone (3 per project)         |
| Story/Enabler      | Story                                 | Issue                                     |
| Task               | Mob task                              | Sub-issue                                 |
| WSJF/Role/DoD      | prioritization / mob role / gate      | description + `agent:*` labels + AC/DoD   |

**The loop:** AI plans → AI asks clarifying questions → **HUMAN validates business context** → AI
executes. Never skip the human validation step.

## How to Structure Linear

Build top-down:

1. **Initiative** = the program. One per program.
2. **Projects** = Units of Work. One coherent outcome each.
3. **Milestones** = the three AI-DLC phases (Inception, Construction, Operations). Create all three
   per project.
4. **Issues** = Stories. Each carries the issue template below. Label with `bolt:N` and `agent:*`
   (lead role).
5. **Sub-issues** = Mob Elaboration tasks. Create during Inception, not before.
6. **Dependencies** = `blocks` / `blockedBy` edges forming the dependency DAG.

Program streams map to **sub-initiatives** where the Linear plan supports them; where it does not,
encode the stream as **project priority** instead (highest-risk stream = Urgent/High).

Use `linear-sop` for the exact MCP tool calls, label prerequisites, and evidence templates.

## Issue Template

Every issue description block contains:

```text
Header:      <ID> — <title>  [{{TICKET_PREFIX}}-XXX]
WSJF:        <score>   MoSCoW: <Must|Should|Could|Won't>
Finding:     <source refs, e.g. audit finding IDs>
Phase:       <Inception | Construction | Operations>
Bolt:        <bolt:N>
Role:        <agent:* lead>
AC:          - acceptance criterion (testable)
DoD:         - merged to {{MAIN_BRANCH}}; relevant gate REAL and green; evidence in Linear;
               no silent suppression
Deps:        blocks: [...]   blockedBy: [...]
Sub-issues:  (Mob Elaboration tasks, added during Inception)
```

## Dependency-Wiring Rules

Wire `blocks` / `blockedBy` so the enforcement lands **before** the thing it enforces:

- **Fix the gate before the fix it verifies.** Harden CI or un-mask a check before landing the fix
  that check is supposed to catch.
- **Rotate before scrub.** Rotate a leaked credential before scrubbing it from history.
- **Capture before alert.** Error capture or health check blocks the alerter and the poller built on
  top of it.
- **Upgrades before re-baseline.** Framework and SDK upgrades block audit re-baselining, which blocks
  the scheduled recurring audit.

Dependency chains are usually rooted at CI hardening — one keystone issue tends to unblock a whole
stream. Identify it and sequence its Bolt first.

## Running a Bolt

1. **Open and elaborate** every issue in the Bolt (Mob Elaboration: sub-issues, unknowns, questions).
2. **Validate with the human** on all business, security, and policy decisions before Construction.
3. **Construct** in dependency order on `{{TICKET_PREFIX}}-` branches with SAFe commits, rebase-first.
4. **Verify gates are real** — a green check that still masks a failure is not an exit.
5. **Post evidence** to Linear (dev/staging/done) per `linear-sop`.
6. **Merge** — RTE prepares the PR; the human (HITL) merges. Exit = merged + real gates green +
   evidence posted.

## Human-Gate Checklist

Route to the human, with options and a recommendation, whenever a decision is:

- A **secret or credential** action (what to rotate, when, blast radius)
- A **security policy**: CSP allow-list, auth behavior, headers
- A **CI or branch-protection** decision: which checks become required
- A **severity or risk policy**: dependency-audit thresholds, fix-vs-suppress budget
- An **SOP exception** (e.g. a migration deviating from the documented process)
- **Signing the Definition of Done**

If a decision changes business, security, or risk posture, it is the human's — surface, recommend,
stop.

## Anti-Patterns (Do NOT use)

```text
Forcing an ambiguous epic into one Bolt    (run a spike instead — elaboration is the hard part)
Creating sub-issues before Inception       (Mob Elaboration produces them, not the other way round)
Bolts as calendar sprints                  (a Bolt exits on evidence, not on a date)
Skipping human validation to move faster   (the loop is the method; without it this is just SAFe)
Treating a green check as an exit          (verify the gate enforces, not that it merely passed)
```

## Authoritative References

- `docs/guides/SAFE-AI-DLC-METHODOLOGY.md` -- Methodology guide (rationale, worked example)
- `specs_templates/program_template.md` -- Program document scaffolding
- **AI-DLC source**: <https://aws.amazon.com/blogs/devops/ai-driven-development-life-cycle/>

## Routes To

- `linear-sop` — MCP tool calls, program structure, issue creation, evidence templates
- `safe-workflow` — branch, commit, and PR conventions; HITL merge
- `orchestration-patterns` — multi-agent swarm coordination for a Bolt
- `pattern-discovery` — find existing code and doc patterns before constructing

