# AU-12(1)_system-wide-and-time-correlated-audit-trail

> Compile audit records from [organization-defined] into a system-wide (logical or physical) audit trail that is time-correlated to within [organization

- Skill: `cyberstrikeus/au-12-1-system-wide-and-time-correlated-audit-trail` (Agent Skill)
- Install (CLI): `npx skillmds@latest add cyberstrikeus/au-12-1-system-wide-and-time-correlated-audit-trail`
- Raw SKILL.md: https://api.skillmd.com/api/skills/cyberstrikeus/au-12-1-system-wide-and-time-correlated-audit-trail/raw
- Safety review: PASS (external: skill-scanner PASS, skillspector PASS)
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Security
- Author: cyberstrikeus (https://skillmd.com/u/cyberstrikeus)
- Updated: 2026-09-17
- Page: https://skillmd.com/skills/cyberstrikeus/au-12-1-system-wide-and-time-correlated-audit-trail

---


# AU-12(1) System-wide and Time-correlated Audit Trail

> **Enhancement of:** AU-12

## High-Level Description

**Family:** Audit and Accountability (AU)
**Framework:** NIST SP 800-53 Rev 5

Audit trails are time-correlated if the time stamps in the individual audit records can be reliably related to the time stamps in other audit records to achieve a time ordering of the records within organizational tolerances.

## What to Check

- [ ] Verify AU-12(1) System-wide and Time-correlated Audit Trail is documented in SSP
- [ ] Confirm control is operating effectively
- [ ] Review evidence of continuous monitoring for AU-12(1)
- [ ] Verify enhancement builds upon base control AU-12

## How to Test

### Step 1: Review Documentation

Examine the System Security Plan (SSP) and related artifacts for AU-12(1) implementation details. Verify the organization has documented how this control is satisfied.

### Step 2: Validate Implementation

```
# For cloud environments, use cloud-audit-mcp tools
# For on-premises, review system configurations directly

# Example: Check if account management policies exist
grep -r "account.management\|access.control" /etc/security/ 2>/dev/null
```

### Step 3: Test Operating Effectiveness

Verify the control is actively functioning, not just documented. Check logs, configurations, and operational evidence.

## Tools

| Tool            | Purpose                      | Usage                            |
| --------------- | ---------------------------- | -------------------------------- |
| cloud-audit-mcp | Check logging configuration  | `cloud_audit_logging`            |
| AWS CLI         | Review CloudTrail/CloudWatch | `aws cloudtrail describe-trails` |

## Remediation Guide

### Control Statement

Compile audit records from [organization-defined] into a system-wide (logical or physical) audit trail that is time-correlated to within [organization-defined].

### Implementation Guidance

Audit trails are time-correlated if the time stamps in the individual audit records can be reliably related to the time stamps in other audit records to achieve a time ordering of the records within organizational tolerances.

## Risk Assessment

| Finding                                                              | Severity | Impact                              |
| -------------------------------------------------------------------- | -------- | ----------------------------------- |
| AU-12(1) System-wide and Time-correlated Audit Trail not implemented | Medium   | Audit and Accountability            |
| AU-12(1) partially implemented                                       | Low      | Incomplete Audit and Accountability |

## CWE Categories

| CWE ID  | Title                |
| ------- | -------------------- |
| CWE-778 | Insufficient Logging |

## References

- [NIST SP 800-53 Rev 5 - AU-12(1)](https://csrc.nist.gov/projects/cprt/catalog#/cprt/framework/version/SP_800_53_5_1_1/home?element=au-12.1)
- [NIST SP 800-53A Rev 5 (Assessment Procedures)](https://csrc.nist.gov/pubs/sp/800/53/a/r5/final)
- [NIST SP 800-53 Rev 5 Full Catalog](https://csrc.nist.gov/pubs/sp/800/53/r5/upd1/final)

## Checklist

- [ ] Control documented in SSP
- [ ] Implementation evidence collected
- [ ] Operating effectiveness validated
- [ ] Continuous monitoring in place
- [ ] Related controls (AU-8, SC-45) reviewed

