# PE-9_power-equipment-and-cabling

> Protect power equipment and power cabling for the system from damage and destruction.

- Skill: `cyberstrikeus/pe-9-power-equipment-and-cabling` (Agent Skill)
- Install (CLI): `npx skillmds@latest add cyberstrikeus/pe-9-power-equipment-and-cabling`
- Raw SKILL.md: https://api.skillmd.com/api/skills/cyberstrikeus/pe-9-power-equipment-and-cabling/raw
- Safety review: PASS (external: skill-scanner PASS, skillspector PASS)
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Coding & Dev Tools
- Author: cyberstrikeus (https://skillmd.com/u/cyberstrikeus)
- Updated: 2026-09-17
- Page: https://skillmd.com/skills/cyberstrikeus/pe-9-power-equipment-and-cabling

---


# PE-9 Power Equipment and Cabling

## High-Level Description

**Family:** Physical and Environmental Protection (PE)
**Framework:** NIST SP 800-53 Rev 5

Organizations determine the types of protection necessary for the power equipment and cabling employed at different locations that are both internal and external to organizational facilities and environments of operation. Types of power equipment and cabling include internal cabling and uninterruptable power sources in offices or data centers, generators and power cabling outside of buildings, and power sources for self-contained components such as satellites, vehicles, and other deployable systems.

## What to Check

- [ ] Verify PE-9 Power Equipment and Cabling is documented in SSP
- [ ] Confirm control is operating effectively
- [ ] Review evidence of continuous monitoring for PE-9

## How to Test

### Step 1: Review Documentation

Examine the System Security Plan (SSP) and related artifacts for PE-9 implementation details. Verify the organization has documented how this control is satisfied.

### Step 2: Validate Implementation

```
# For cloud environments, use cloud-audit-mcp tools
# For on-premises, review system configurations directly

# Example: Check if account management policies exist
grep -r "account.management\|access.control" /etc/security/ 2>/dev/null
```

### Step 3: Test Operating Effectiveness

Verify the control is actively functioning, not just documented. Check logs, configurations, and operational evidence.

## Tools

| Tool          | Purpose                           | Usage |
| ------------- | --------------------------------- | ----- |
| Manual Review | Documentation and interview-based | N/A   |

## Remediation Guide

### Control Statement

Protect power equipment and power cabling for the system from damage and destruction.

### Implementation Guidance

Organizations determine the types of protection necessary for the power equipment and cabling employed at different locations that are both internal and external to organizational facilities and environments of operation. Types of power equipment and cabling include internal cabling and uninterruptable power sources in offices or data centers, generators and power cabling outside of buildings, and power sources for self-contained components such as satellites, vehicles, and other deployable systems.

## Risk Assessment

| Finding                                          | Severity | Impact                                           |
| ------------------------------------------------ | -------- | ------------------------------------------------ |
| PE-9 Power Equipment and Cabling not implemented | Medium   | Physical and Environmental Protection            |
| PE-9 partially implemented                       | Low      | Incomplete Physical and Environmental Protection |

## CWE Categories

| CWE ID | Title                 |
| ------ | --------------------- |
| N/A    | No direct CWE mapping |

## References

- [NIST SP 800-53 Rev 5 - PE-9](https://csrc.nist.gov/projects/cprt/catalog#/cprt/framework/version/SP_800_53_5_1_1/home?element=pe-9)
- [NIST SP 800-53A Rev 5 (Assessment Procedures)](https://csrc.nist.gov/pubs/sp/800/53/a/r5/final)
- [NIST SP 800-53 Rev 5 Full Catalog](https://csrc.nist.gov/pubs/sp/800/53/r5/upd1/final)

## Checklist

- [ ] Control documented in SSP
- [ ] Implementation evidence collected
- [ ] Operating effectiveness validated
- [ ] Continuous monitoring in place
- [ ] Related controls (PE-4) reviewed

