# Agile Roadmap

> Maps multi-phase trajectories with dependencies into clear, sequenced roadmaps. Use when work has multiple phases that need sequencing, when decisions today affect future decisions, when stakeholders need to see the whole journey, or when external dependencies exist. Applicable regardless of total duration — a 4-week multi-phase initiative benefits as much as a quarterly roadmap.

- Skill: `djalmajr/agile-roadmap` (Agent Skill, multi-file: 2 files)
- Install (CLI): `npx skillmds@latest add djalmajr/agile-roadmap`
- Raw SKILL.md: https://api.skillmd.com/api/skills/djalmajr/agile-roadmap/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Product & Planning
- Author: djalmajr (https://skillmd.com/u/djalmajr)
- Updated: 2026-09-17
- Page: https://skillmd.com/skills/djalmajr/agile-roadmap

---


# Roadmap Planning

Use this skill to transform broad objectives into clear, prioritized roadmaps connected to the executable backlog.

Initial context received via slash: $ARGUMENTS

If `$ARGUMENTS` is filled, use as starting point (e.g., intake, initiative list, period).
If empty, ask for the roadmap objective.

## Language

Write the artifact in the user's language. Apply correct grammar and any required diacritics or script-specific characters. If the user's language is unclear, ask before generating output. Templates are in English — translate headers and content to match.

## Project root

This skill writes artifacts at paths relative to the **project root** (the repo where the work happens), not the agent's current working directory.

- If invoked from inside the project, use the relative paths shown in this skill.
- If invoked from another directory (e.g., a sibling repo, or when the project lives elsewhere), prepend `<project-root>/` to every artifact path.
- When the project root is ambiguous, confirm with the user via the harness question tool before writing.

## Prompting

Follow the project-wide convention in `CLAUDE.md` / `AGENTS.md` ("Skill Prompting Conventions"). Use the harness's structured-question tool — `AskUserQuestion` (Claude Code), `ask_user_question` (Codex), or `question` (OpenCode) — for the decision points below. Use free-form text only where a path/name/value cannot be enumerated.

| Decision point | Why structured | Suggested options |
|---|---|---|
| Roadmap type | Affects template variant | Trajectory · Quarterly |
| Next initiative to decompose | Branches the next skill | first initiative · pick from list |

Free-form prompts (no structured tool):

- Period bounds (if quarterly)
- Initiative descriptions

No-pause mode: if the user has explicitly disabled mid-skill clarification, convert every structured prompt into an entry under *Open questions* (or equivalent) and proceed without blocking.

## When to use

Roadmap is defined by **trajectory complexity**, not by duration. Use this skill when 2+ apply:

- Multiple initiatives/phases need sequencing (can't all run in parallel)
- Decisions today affect future decisions (local optimization can become tech debt)
- Stakeholders need to see the whole journey before approving individual steps
- External dependencies (other teams, vendors, deadlines)
- Total complexity exceeds what fits in a single epic

A 4-week initiative with 5 sequenced phases **also benefits** from a roadmap — don't dismiss it as "too short".

## When NOT to use

- Isolated, self-contained initiative (single epic covers it)
- Single epic with no ramifications — go straight to `/agile-epic`
- Team already has the trajectory clear in mind and no stakeholder needs the map

## Scope (types of roadmap)

- **Trajectory roadmap:** multi-phase initiative with dependencies between phases (any duration)
- **Initiative roadmap:** phases, stories, unblocks, and delivery order for a named initiative
- **Quarterly roadmap:** direction alignment, period objectives, and macro priorities (one specific type — not the only one)

## Operating rules

- Roadmap must focus on results and capabilities, not extensive technical lists.
- Every roadmap item must indicate expected value, dependencies, and progress signal.
- The roadmap must show what is a commitment, what is a risk, and what is outside the period.
- Whenever possible, each initiative should point to a corresponding epic.

## How to build a trajectory roadmap (default)
1. Declare the overarching objective of the journey.
2. List 2-5 phases or initiatives (sequenced or parallel).
3. Order by dependency and value — make sequencing explicit.
4. For each phase: expected outcome, dependencies, progress signal, risks.
5. Register what is a commitment, what is a risk, and what is out of scope.
6. Validate that the narrative is observable and stakeholder-ready.

## How to build a quarterly roadmap (specific type)
Same as above, with period objective (quarter) as the time boundary.
Use when stakeholders expect a period-based view (common for product/exec audiences).

## How to build a roadmap by epic
1. Declare the epic objective.
2. Define phases or delivery waves.
3. Relate stories by phase.
4. Make unblocks, risks, and intermediate validations explicit.
5. Confirm that the roadmap guides execution without replacing plans.

## Where to save

- Initiative/trajectory roadmap: `planning/<initiative>/roadmap.md`
- Quarterly roadmap: `planning/roadmaps/Q<N>-YYYY.md`

## Collaborative work

When the team has 2+ developers, the roadmap should:
- Identify parallel tracks (e.g., Backend, Frontend, AI Engineering) so devs can work simultaneously
- Define interface contracts between tracks to minimize blocking
- Show which stories/phases can run in parallel in the timeline
- Ask about team size and composition during roadmap creation

### Solo dev

For solo-dev work, parallelism does not apply at execution time. The parallel-track structure still helps for future-proofing — annotate tracks that *could* split if a second dev joins later, but pick a serial sequence for actual delivery. Mermaid `flowchart` (dependencies) fits solo work better than `gantt` (schedules).

## Chaining

At the end of the roadmap, offer **only** `/agile-epic`:
- "Do you want me to run `/agile-epic` to decompose the first initiative into stories?"

> **Important:** The roadmap identifies initiatives at a macro level. Each initiative should be decomposed via `/agile-epic` before execution.

## Template

Use `templates/roadmap.md` from this skill as base.

## Relationship with the flow

```mermaid
flowchart LR
    A["/agile-intake"] --> B["/agile-roadmap"]
    B --> C["/agile-epic"]
    C --> D["/agile-story"]
    D --> E[execution]
    E --> F["/agile-status"]
```

This skill connects strategy and execution. For decomposition, use `/agile-epic`. For execution planning, use `/agile-story`.

