# Backlog

> Manage the rpm backlog (long-term project tasks in docs/rpm/future/tasks.org — distinct from Claude's native TaskCreate list, which is session-scoped). Add, list, review, postpone, or complete entries. TRIGGER on natural-language backlog operations — phrasings like "backlog X", "add X to backlog", "add to backlog", "backlog the following", "what's on the backlog", "show/list backlog", "review backlog", "postpone N", "done N", "mark N done", "defer X" all qualify and must route through this skill instead of editing tasks.org directly. Also use when the user wants to reorder execution sequence, defer to the bottom of a group, or evaluate backlog health.

- Skill: `dppdppd/backlog` (Agent Skill)
- Install (CLI): `npx skillmds@latest add dppdppd/backlog`
- Raw SKILL.md: https://api.skillmd.com/api/skills/dppdppd/backlog/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Product & Planning
- Author: dppdppd (https://skillmd.com/u/dppdppd)
- Updated: 2026-09-17
- Page: https://skillmd.com/skills/dppdppd/backlog

---


# /backlog

Manage the **rpm backlog** — persisted at `docs/rpm/future/tasks.org`.
All operations read and write this file using org-mode format.

## Project Amendments

At the start of every invocation, check whether
`docs/rpm/skills/backlog.md` exists in the consuming project. If it
does, read it and apply its contents as additional project-specific
instructions for this skill. Amendments may add band orderings,
extra parent groups, or custom triage rules. They cannot remove or
override plugin defaults — on conflict, this SKILL.md wins.

The backlog is sorted in **execution order** (top-to-bottom = the
order in which tasks need to get done). "Take from the top" is the
expected read pattern.

Within each `* Parent` group, keep this band order top-to-bottom:

1. **Actionable** — `** IN-PROGRESS` or `** TODO` with all
   `:BLOCKED_BY:` deps DONE
2. **Blocked** — `** BLOCKED`, or `** TODO` with unresolved
   `:BLOCKED_BY:`
3. **Postponed** — `** TODO` with a `:POSTPONED:` stamp

Closed entries (`** DONE` / `** CANCELLED`) are archived to
`docs/rpm/future/done.org` by `/session-end` and do not live in
tasks.org long-term. `/backlog done` toggles `TODO → DONE` in place;
the archive sweep runs at the next session-end.

Blocked and postponed items drift to the bottom of their band
automatically whenever this file is written (during `add`,
`postpone`, `review`, or session-end Phase 3b). Moves are mechanical
— no user question. Preserve relative order within each band.
New `add` entries land at the bottom of the **actionable band**
(not the absolute bottom); user promotes upward explicitly if
something needs to happen sooner.

**Pivot capture (automatic, no user question).** When the user
redirects mid-session to new multi-step work that meets the
`TaskCreate` bar, the LLM must insert a `** TODO` at the **top** of
the actionable band AND update `docs/rpm/~rpm-session-start` to set
the `task:` field to the new work. The ask IS the confirmation —
don't prompt. Skip for tactical single-step follow-ups. Rationale:
the backlog should always represent current state, so a dropped
session (without `/session-end`) still hands off accurately. Full
rule lives in `plugin/hooks/_directives.sh`.

## Routing

Parse `$ARGUMENTS`:

- `add <description>` → **Add** below
- `list` → **List** below
- `review` → **Review** below
- `postpone <task text or number>` → **Postpone** below
- `done <task text or number>` → **Done** below
- empty or natural language → infer intent from context. If unclear,
  show usage:

  ```
  /backlog add <description>   — add a backlog entry
  /backlog list                — show all entries with statuses
  /backlog review              — evaluate and reorganize
  /backlog postpone <task>     — defer to the bottom of its group
  /backlog done <task>         — mark an entry complete
  ```

---

## Add

**Do NOT call `TaskCreate` for backlog additions.** Your rpm backlog
is long-term; native tasks (`TaskCreate`/`TaskList`) are reserved for
work actually happening *this session*. Adding to your rpm backlog
without a mirrored native task is the correct, intended behavior.

**3 body lines max per entry, plus the org `:PROPERTIES:` drawer.**
The drawer is its own thing — it doesn't count toward the body
budget. Body content (heading + any inline notes) caps at 3 lines;
default is just the heading.

Standard shape:

```
** TODO <description> [[file:YYYY-MM-DD-slug.md]]
   :PROPERTIES:
   :ID: <slug>
   :END:
```

Add `:BLOCKED_BY: <other-slug>` inside the drawer when there's a
dependency. Add up to 2 inline body lines (under the drawer) only
when something can't reasonably live in the detail file — most of
the time the detail file is the right home for everything beyond
the heading.

What does **not** belong inline in tasks.org:
- Bullet lists describing the task
- Prose explaining "why", "how", or "defer until"
- Implementation notes, links to related files, status commentary

All of that goes in the detail file at
`docs/rpm/future/YYYY-MM-DD-slug.md` — never as 5+ lines of body
under the heading. Subagents dispatched by `/next` actionable-
backlog read the detail file, so information isn't lost — it's
just not in the line-scannable index. Multi-line entries turn
the backlog into prose-reading and break the SessionStart menu
+ `/next` priority scan, both of which need "topmost unblocked"
to fit a glance.

1. Read `docs/rpm/future/tasks.org` to see existing parent headings
   and task structure.
2. Determine the parent heading:
   - If an existing heading fits, suggest it (or ask when ambiguous).
   - If none fits, **create a new `* Parent` group**. When the new
     group names a coherent objective (a deliverable, capability, or
     area of work with a demonstrable done-state), **propose a
     `Goal:` body line for it** — don't silently create a goalless
     group. State the proposed goal as a **demonstrable test** (a
     pass/fail artifact that PROVES it met — "N cases pass
     end-to-end vs reference", "trace 38/38" — not a gap-list or a
     vague description like "launch ready"). The user accepts,
     edits, or declines; on accept, write it as a `Goal:` body line
     directly under the `* Parent`. **Skip the proposal** for pure
     status bands (`Active`, `Blocked`) or catch-all buckets
     (`Misc`, `Maintenance`, `Ideas`) where a success metric doesn't
     apply.

   For any `* Parent` that carries a `Goal:` / `Success:` line (new
   or existing), keep the metric a **demonstrable test** and ensure
   the goal's chain terminates in a **verify/sign-off** task — file
   that terminus now if it's missing, with the build gap-tasks as
   its `:BLOCKED_BY:` deps. Don't leave a goal defined only by its
   build gaps.
3. Add as `** TODO <one-sentence description>
   [[file:YYYY-MM-DD-slug.md]]` followed by the standard
   `:PROPERTIES: / :ID: <slug> / :END:` drawer, at the bottom of
   the **actionable band** in the chosen heading (above any
   blocked / postponed / DONE entries).
4. Create the detail file at `docs/rpm/future/YYYY-MM-DD-slug.md`
   with everything that would otherwise be inline: title,
   description, action steps, scope, estimate, related links. Ask
   the user for details if the task is complex.
5. If the task has obvious dependencies on existing tasks, add
   `:BLOCKED_BY: <other-slug>` inside the drawer (still
   structured metadata, not body).
6. **Research offer (when warranted).** If the task crosses into a
   domain or technology new to the project, hinges on external or
   factual unknowns (APIs, libraries, standards, landscape/competitor
   facts, best practices), or is a selection/evaluation/comparison
   ("X vs Y", "which approach"), **offer to run the `research` skill
   (`rpm:research`) on it first** — upfront research de-risks a
   new-domain task before build effort is committed, and its saved
   report (`docs/rpm/research/<slug>/`) can be linked from the detail
   file. Offer only; don't auto-run (matches the research skill's own
   Offer gate). Skip the offer for internal/mechanical work fully
   scoped by the existing codebase (refactors, bugfixes, renames,
   doc/test edits) or when the domain knowledge is already in hand.
7. Confirm: print the new entry and its location.

---

## List

1. Read `docs/rpm/future/tasks.org`.
2. Print a summary line and the active task list:

   ```
   ## Tasks — N in-progress · N todo · N blocked

   <Parent Heading>
      1. [TODO] <description>
      2. [IN-PROGRESS] <description>
         blocked-by: <id>
   ```

   Grouped by parent heading. Number sequentially for reference.
   Closed entries live in `docs/rpm/future/done.org` — read that
   file directly if the user asks for history.

---

## Review

1. Read `docs/rpm/future/tasks.org` and all linked detail files.
2. Evaluate:
   - **Organization:** tasks under logical parent headings?
   - **Dependencies:** relationships correct? Missing or circular?
   - **Staleness:** TODOs with no activity across multiple sessions?
   - **Scope:** any tasks too large for one session (~35 min)?
     Suggest decomposition.
   - **Duplicates:** overlapping tasks?
   - **Demonstrable goals:** for any `* Parent` carrying a `Goal:` /
     `Success:` line, that metric must be a **demonstrable test** (a
     pass/fail artifact that PROVES it met — "N cases pass end-to-end
     vs reference", "trace 38/38"), not a gap-checklist or a vague
     description ("launch ready"). Every `[NOT MET]` goal's task chain
     must **terminate in a verify/sign-off task** (with the build
     gap-tasks as its `:BLOCKED_BY:` deps), not merely list build
     gaps. Flag goals whose `Success:` is a gap-list/description or
     whose chain has no terminal proof task. A metric reconcile/split
     must add the "prove it" terminus in the **same** edit.
   - **Order:** work is sorted top-to-bottom by execution order
     (when it needs to get done)? Anything that should happen sooner
     than what's currently above it?
   - **Deferrals:** anything the user has set aside or signaled they
     want to come back to later? Surface as candidates for **Postpone**.
3. Present findings and proposed changes. Wait for confirmation
   before editing. For postpones, apply the move using the
   **Postpone** procedure below.

---

## Postpone

Defer a task to the bottom of its `* Parent` group. Status stays
`TODO` (the task isn't dropped, just moved later in the execution
order). Adds a `:POSTPONED: YYYY-MM-DD` property so the deferral is
auditable.

1. Read `docs/rpm/future/tasks.org`.
2. Match the argument to a task — by number (from most recent
   `/backlog list`), by text match, or by asking if ambiguous.
3. Identify the task's `* Parent` heading. Find the last `**` task
   under that parent (any status — active, blocked, or postponed).
4. Edit the file to move the matched task's heading + its property
   drawer to just below that last sibling. **Do not change status**;
   keep `** TODO`.
5. Add (or update) `:POSTPONED: YYYY-MM-DD` inside the property
   drawer with today's date. Create the drawer if the task didn't
   have one.
6. Confirm: print the moved task's new position.

If the task is already at the bottom of its group, just stamp the
`:POSTPONED:` property and note "already at bottom".

---

## Done

1. Read `docs/rpm/future/tasks.org`.
2. Match the argument to a task — by number (from most recent
   `/backlog list`), by text match, or by asking if ambiguous.
3. Change `** TODO` to `** DONE` and append today's date:
   `** DONE <description> :CLOSED: [YYYY-MM-DD]`
4. Confirm what was marked done.