# Neqsim Ncs Value Chain Optimization

> Multi-year, capacity-constrained NCS value-chain optimisation: forecasts fields from Sodir history, phases in discoveries, routes oil and gas through real trunklines, plants and terminals with a HiGHS LP, and returns production, curtailment, shadow prices, ullage, tie-in rankings and uplift lists for NeqSim follow-up. USE WHEN: maximising NCS value or production, finding the binding pipeline/plant and its capacity value, testing an outage or tie-in, or fitting discoveries into spare capacity.

- Skill: `equinor/neqsim-ncs-value-chain-optimization` (Agent Skill, multi-file: 12 files)
- Install (CLI): `npx get-skill add equinor/neqsim-ncs-value-chain-optimization`
- Raw SKILL.md: https://api.skillmd.com/api/skills/equinor/neqsim-ncs-value-chain-optimization/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: DevOps & Infra
- Author: equinor (https://skillmd.com/u/equinor)
- Updated: 2026-11-14
- Page: https://skillmd.com/skills/equinor/neqsim-ncs-value-chain-optimization

---


# NCS Value-Chain Optimisation

This skill optimises the Norwegian Continental Shelf as one system. It takes the
open-data export graph from `neqsim-ncs-infrastructure-network`, puts supply on
it for every year, and answers:

- how much each field and discovery should produce each year to maximise value
  when all fields share the same trunklines, plants and terminals;
- which elements bind, and what one more MSm3/d or Sm3/d of capacity is worth
  there (shadow price);
- how an outage, capacity change, price shift or new tie-in propagates;
- where spare capacity (ullage) opens up over time, and which discoveries use
  it best;
- which producing fields could ship more, and whether the field or the network
  limits them.

Everything is public screening data. Governed inputs (corporate forecasts, Gassled
tariffs, gas-quality specs, metered flows) enter through a scenario JSON
produced by a private enterprise binding skill (a company writes its own; see
the Enterprise Agent and Skill Repositories guide). This skill never reads company
systems.

## When to Use

- "Maximise NCS production/value for 2026–2040 given the pipeline system."
- "What is the most valuable debottleneck on the NCS, and when does it bind?"
- "If Kollsnes runs at 70% in 2027, what is lost and where does gas reroute?"
- "Which discoveries should be tied in first, into which host, and is there
  ullage?"
- "Which fields could produce more today, and what limits them?"
- Before a detailed NeqSim host process-model study: to get the rate targets
  the host must handle, including tie-ins.

## Inputs

- An `NcsNetwork` (bundled snapshot or a live rebuild).
- A scenario (`ncs_value_chain_scenario.v1`, see `scenario.py`) with these keys:
  - `years`;
  - `prices` (gas NOK/Sm3, liquid NOK/Sm3, exit-market factors);
  - `tariffs` (default and per arc);
  - `discount_rate`;
  - `capacity_overrides`;
  - `outages` (element, years, available fraction);
  - `forecast_overrides` (e.g. corporate forecast per field);
  - `include_discoveries`, `tieback_max_km`, `max_paths_per_entity`.
  All have stated public defaults.

## Outputs

`NcsValueChainOptimizer(network, scenario).run()` returns
`ncs_value_chain_result.v1`. For each year it holds:

- `produced` per entity (`u`, gas MSm3/d, liquid Sm3/d);
- `curtailed`, `element_flow` and `utilization`;
- `shadow_price_mnok_per_unit_yr`, and `exits` by market;
- `unsold` (production without a sales route, e.g. reinjection) and
  `unconnected` entities.

It also carries the horizon NPV, the tie-back host of each discovery, the
supply profiles with their method, and the stated assumptions.

`opportunities.py` turns this into:

- `bottlenecks`: elements ranked by discounted shadow value;
- `ullage_timeline`: spare capacity per element and year;
- `curtailment`: lost production by year and entity;
- `tiein_ranking`: discoveries by accepted discounted revenue, with host and
  distance;
- `stranded_discoveries`: no host within the tie-back radius;
- `production_uplift`: extra rate per field, limited by route headroom or
  demonstrated capability.

## Engineering Method

1. **Supply.** Sodir yearly net production up to the base year.
   - **Forecast:** an Arps decline fitted from peak, using
     `norwegian_continental_shelf_data.fit_arps_decline` (built-in exponential
     fallback), with a 4 %/yr minimum decline. Fields still on plateau hold their
     rate until about 60 % of remaining reserves are produced, then decline at
     12 %/yr.
   - **Cap:** cumulative future volume is capped at Sodir remaining reserves.
   - **Discoveries:** sized from Sodir recoverable volumes. Start year = base
     year + 2 (decided/approved), + 4 (clarification), + 7 (likely); not
     evaluated and unlikely are excluded by default. Profile: 50 % build-up
     year, then 12 %/yr of recoverable on plateau for 4 years, then 15 %/yr
     decline.
2. **Routing.** Up to 20 loop-free paths per entity and medium to markets. A
   discovery ties back to the nearest in-service processing host within
   `tieback_max_km` that has an export route.
3. **LP per year.**

   $$\max \sum_{e,p} \left(P_m f_{exit} - T_p\right) x_{e,p} \quad \text{s.t.} \quad \sum_p x^{m}_{e,p} = u_e R^{m}_e,\; \sum_{(e,p) \ni c} x_{e,p} \le C_c,\; 0 \le u_e \le 1$$

   Here $u_e$ couples a field's oil and gas, and $C_c$ is every trunkline and
   plant capacity after overrides and outages. Solved with SciPy HiGHS. Duals
   of the capacity rows are shadow prices in MNOK/yr per MSm3/d (gas) or per
   Sm3/d (liquid).
4. **Horizon value.** Annual objectives discounted at `discount_rate`. Years
   are independent: curtailed volume is lost, not deferred (conservative).

## Python Usage Pattern

```python
from ncs_infrastructure_network import NcsNetwork
from ncs_value_chain_optimization import (NcsValueChainOptimizer, make_scenario, bottlenecks,
                                          tiein_ranking, production_uplift, ullage_timeline)
from ncs_value_chain_optimization import neqsim_bridge as vb

net = NcsNetwork.load()
sc = make_scenario(years=[2026, 2040],
                   outages=[{"element": "KOLLSNES", "years": [2027], "available_fraction": 0.7}])
opt = NcsValueChainOptimizer(net, sc)
res = opt.run()                           # ~1 s for 15 years, 160 entities

bottlenecks(res)[:5]                      # KOLLSNES binds in 2027 at ~1090 MNOK/yr per MSm3/d
tiein_ranking(res, gas_price=3.0, liquid_price=4500.0)[:10]
production_uplift(opt, res, 2026)
ullage_timeline(res, ["LANGELED_SOUTH__SLEIPNER__EASINGTON", "KOLLSNES"])

# NeqSim hand-offs (pip install neqsim)
vb.value_objective_check(res, sc, 2026)   # ValueChainObjective reproduces the LP gross revenue
specs = vb.debottleneck_specs(opt, res, [{"element": "KOLLSNES", "added_capacity": 10, "capex_mnok": 3000}])
vb.run_debottlenecking(specs, sc)         # DebottleneckingAdvisor: NPV, B/C, payback
vb.process_model_targets(res, net, "GOLIAT")  # rate targets for the optimize-processmodel agent
```

## Validated NeqSim Path

| Step | NeqSim class | Bridge |
|------|--------------|--------|
| Economic basis | `neqsim.process.optimization.valuechain.EconomicParameters` | `economic_parameters` |
| Revenue cross-check | `ValueChainObjective.evaluate(gasSm3/d, oilSm3/d, powerKw)` | `value_objective_check` |
| Debottleneck ranking | `DebottleneckingAdvisor` + `DebottleneckCandidate` (year offsets from base year) | `debottleneck_specs`, `run_debottlenecking` |
| Tie-back screening | `fielddevelopment.tieback.TiebackAnalyzer` | `ncs_infrastructure_network.neqsim_bridge` |
| Trunkline deliverability | `equipment.network.LoopedPipeNetwork` | `ncs_infrastructure_network.neqsim_bridge` |
| Host process capacity | `ProcessAutomation.findMaxThroughputJson`, `AgenticProcessOptimizer` | `process_model_targets` → `optimize-processmodel` agent |
| Field-life investment timing | `LifeOfFieldOptimizer` | take a host's rate targets as its production basis |

## Validation Checklist

- [ ] Every year `status == "optimal"`; first-year shipped gas within a few % of
      the last historical year (the 2026 base case ships ~320 MSm3/d).
- [ ] `max(utilization) <= 1` in every year.
- [ ] `value_objective_check` relative difference below 1e-6 (the NeqSim
      economics and the LP agree).
- [ ] Shadow prices ≈ netback × 365 on binding gas elements (sanity: (3.0 − 0.12)
      × 365 ≈ 1051 MNOK/yr per MSm3/d).
- [ ] Discoveries used in rankings carry status and RC; start years reviewed.
- [ ] Prices and tariffs are labelled public defaults unless bound from
      governed data.

## Common Mistakes

- **Too few paths per entity.** With 8 paths the LP curtailed about
  19 MSm3/d of Troll gas that the network can carry. Keep ≥ 20.
- **Treating DebottleneckCandidate years as calendar years.** They are offsets
  from the base year; 2027 as a year discounts the benefit to zero.
- **Using duals for large capacity steps.** A dual is marginal. The bridge
  re-solves with the added capacity instead.
- **Reading profiles as a forecast.** Sodir layer 7300 is history only; the
  current year is year-to-date.
- **Mistaking zero curtailment for no bottleneck.** When supply declines faster
  than capacity, nothing binds. Check `ullage_timeline` for where tie-ins fit.

## Limitations

- Nameplate capacities; no line-pack, pressure-dependent capacity, gas-quality
  blending, Gassco nomination rules or NGL product constraints at Kårstø.
- Screening supply forecasts (decline + reserves cap). Replace them with corporate or
  operator forecasts through `forecast_overrides` for decisions.
- Tariffs and exit-market factors are placeholders until bound from governed
  commercial data.
- Years are independent (no deferral, storage or reservoir response to
  curtailment).
- Host processing capacity is not open data; the host process model must
  confirm tie-in rates.

## Related NeqSim Functionality

- `neqsim-ncs-infrastructure-network`: the graph, open-API clients, tie-back and
  hydraulics bridges.
- `neqsim-norwegian-continental-shelf-data`: `fit_arps_decline`, headline facts,
  carbon-cost basis.
- `neqsim-resource-classification-screening`: RC maturity behind discovery
  phasing.
- `neqsim-asset-value-npv-screening`, `neqsim-energy-emissions-screening`:
  project-level economics and emissions of a chosen tie-in or debottleneck.
- NeqSim `optimize-processmodel` agent: host plant confirmation of the rate
  targets.

## References

- Norwegian Offshore Directorate FactPages / DataService (NLOD 2.0).
- Norwegian Petroleum, "The oil and gas pipeline system" and "Resource accounts".