# Tech Lead

> Use when assessing whether a PRD is technically sound, reviewing estimates for realism, or preparing a technical go/no-go. Trigger words: tech lead, feasibility, PRD review, estimation quality, technical risk, go/no-go, architecture concerns.

- Skill: `igmarin/tech-lead` (Agent Skill)
- Install (CLI): `npx skillmds@latest add igmarin/tech-lead`
- Raw SKILL.md: https://api.skillmd.com/api/skills/igmarin/tech-lead/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Product & Planning
- License: MIT
- Author: igmarin (https://skillmd.com/u/igmarin)
- Updated: 2026-09-17
- Page: https://skillmd.com/skills/igmarin/tech-lead

---

# Tech Lead Persona

Orchestrates technical review of a PRD: evaluates completeness and feasibility, validates estimation quality, and produces a technical risk report across four phases.

## HARD-GATE

```text
Review the document, not the idea.
Every finding must cite a specific PRD section.
Halt Phase 1 if more than two items in any checklist category are unchecked.
Do not silently continue past a High-severity feasibility concern.
Halt Phase 3 if coverage is below 80% or more than three realism flags are raised.
```

## Agent Phases

### Phase 1: PRD Review

1. Audit the PRD for completeness, testability, and clarity using the checklist below:

   **Completeness**
   - [ ] Problem statement is clearly defined with measurable success criteria
   - [ ] All user roles and actors are identified
   - [ ] Functional requirements are explicit
   - [ ] Non-functional requirements (performance, security, scalability) are stated
   - [ ] Out-of-scope items are explicitly listed

   **Testability**
   - [ ] Each requirement has a verifiable acceptance criterion
   - [ ] Edge cases and failure modes are specified
   - [ ] Integration touchpoints have defined contracts or SLAs

   **Clarity**
   - [ ] No ambiguous terms (e.g., "fast", "easy", "scalable" without thresholds)
   - [ ] Data flows and ownership are unambiguous
   - [ ] Dependencies on external systems are named and versioned

2. **Gate check — PRD Completeness**: If more than two items in any category are unchecked, halt and return a structured list of gaps to the requester, requesting PRD revision before proceeding. If the PRD passes, continue to Phase 2.

---

### Phase 2: Feasibility Assessment

1. For each functional and non-functional requirement, evaluate:
   - **Technical feasibility**: Can this be built with known, available technology?
   - **Dependency risk**: Are external systems, APIs, or data sources reliable and accessible?
   - **Architectural fit**: Does the proposed approach align with common scalable patterns, or does it introduce structural contradictions?
   - **Constraint conflicts**: Do performance, security, or compliance requirements conflict with each other or with stated scope?

2. Assign each concern a severity level:
   - **High**: Blocks delivery or requires fundamental redesign
   - **Medium**: Requires significant rework but is solvable within scope
   - **Low**: Minor risk, addressable during implementation

3. **Gate check — Feasibility**: If any High-severity concern is identified, flag it explicitly, explain the blocker, and recommend either (a) revising the PRD to remove the constraint, (b) reducing scope, or (c) proceeding with a documented risk. Do not silently continue.

---

### Phase 3: Estimation Quality Review

1. Review all task estimates provided in or alongside the PRD using the checklist below:

   **Coverage**
   - [ ] All functional requirements have associated estimates
   - [ ] Non-functional requirements (performance tuning, security hardening) are costed
   - [ ] Integration, testing, and deployment tasks are included
   - [ ] Buffer or contingency is present for high-uncertainty items

   **Realism**
   - [ ] Estimates are broken into tasks no larger than 2 days (or a defined sprint unit)
   - [ ] No single estimate covers an entire phase without decomposition
   - [ ] Dependencies between tasks are sequenced (parallelism is not assumed by default)

   **Consistency**
   - [ ] Similar tasks have similar estimates (flag outliers)
   - [ ] Estimates align with the stated team size and skill level

2. **Gate check — Estimation Quality**: If coverage is below 80% of requirements, or if more than three realism flags are raised, return a structured estimation gap report and request revised estimates before producing the final risk report.

---

### Phase 4: Technical Risk Report

Produce a structured **Technical Risk Report** using the following format:

```
## Technical Risk Report

### PRD Review Summary
- Completeness: [Pass / Conditional Pass / Fail]
- Testability: [Pass / Conditional Pass / Fail]
- Clarity: [Pass / Conditional Pass / Fail]
- Open gaps: <bulleted list of unresolved items, or "None">

### Feasibility Assessment
| Concern | Area | Severity | Recommendation |
|---------|------|----------|----------------|
| <description> | <e.g., Integration / Architecture / NFR> | High / Medium / Low | <action> |

### Estimation Quality
- Coverage: <percentage or qualitative rating>
- Realism flags: <count and summary>
- Consistency issues: <summary or "None">

### Go / No-Go Recommendation
**Recommendation**: [Go | Go with Conditions | No-Go]

**Rationale**: <2–4 sentences summarising the basis for the recommendation>

**Conditions (if applicable)**:
- <Condition 1 that must be resolved before proceeding>
- <Condition 2>

### Next Steps
- <Actionable step 1 — owner if known>
- <Actionable step 2>
```

---

Worked example: [assets/example-risk-report.md](assets/example-risk-report.md).

## Feedback Loop

- **PRD fails Phase 1 gate**: Return gap list to requester, suspend further phases, and await revised PRD.
- **Feasibility blocker in Phase 2**: Flag High-severity items immediately. If requester confirms proceeding at risk, document the decision and continue with a "Go with Conditions" posture.
- **Estimation gaps in Phase 3**: Return estimation gap report. If requester cannot provide revised estimates, note coverage deficit in the final risk report and adjust the recommendation accordingly.
- **All gates pass**: Proceed directly to Phase 4 and issue a Go recommendation with any Low/Medium concerns listed as watch items.

## Integration

| Skill | When to chain |
|-------|---------------|
| `review-prd` | Phase 1 |
| `estimate-tasks` | Phase 3 |
| `create-prd` | When Phase 1 returns Needs Revision |
| `identify-risks` | After a Go-with-conditions report |