# Carpentry Metrics Review

> Track, interpret and act on the outcome metrics that matter for a carpenter. TRIGGERS - Use when a carpenter needs a metrics & outcomes review for homeowners, builders and commercial clients in workshops and construction sites.

- Skill: `lionelsimai/carpentry-metrics-review` (Agent Skill)
- Install (CLI): `npx get-skill add lionelsimai/carpentry-metrics-review`
- Raw SKILL.md: https://api.skillmd.com/api/skills/lionelsimai/carpentry-metrics-review/raw
- Safety review: pending (external: skill-scanner PASS, skillspector PASS)
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Coding & Dev Tools
- License: MIT
- Author: lionelsimai (https://skillmd.com/u/lionelsimai)
- Updated: 2026-11-12
- Page: https://skillmd.com/skills/lionelsimai/carpentry-metrics-review

---

# Metrics & Outcomes Review — Carpentry

Track, interpret and act on the outcome metrics that matter for a carpenter. The deliverable is a metrics dashboard definition and an interpretation/action review.
This skill is written for a carpenter working with homeowners, builders and commercial clients in workshops and construction sites.

## When to use
- You are a carpenter preparing, delivering or reviewing this part of your work in workshops and construction sites.
- You need a defensible, repeatable approach that produces a metrics dashboard definition and an interpretation/action review.
- A colleague, auditor or client asks how this was done and what evidence supports it.

## Key Concepts
| Term | Meaning |
|------|---------|
| Snagging | fixing small defects at the end of a job |
| Mitred joint | a joint cut at an angle, typically 45 degrees |
| Stud wall | a framed internal wall of timber uprights |

## Workflow
1. **Step 1** - Define each metric precisely — start with job completion times — including source data in cutting lists and collection method
2. **Step 2** - Set review cadence and comparison baselines so trends, not single data points, drive decisions
3. **Step 3** - Investigate movements before celebrating or panicking: check data quality, case mix and one-off causes
4. **Step 4** - Link metric movements to practice changes and to risks such as machinery injuries; test one change at a time where possible
5. **Step 5** - Report results honestly to stakeholders in workshops and construction sites, including where outcomes fell short and what changes

## Profession-Specific Components
| Component | Details for Carpentry |
|-----------|-------------------------------|
| Core documentation | cutting lists; job specifications; measurement records; invoices |
| Core tools & equipment | power saws; routers; measuring tools; workshop machinery |
| People involved | homeowners, builders and commercial clients; the carpenter; colleagues and other services in workshops and construction sites |
| Primary record | cutting lists — keep it current, dated and attributable |

## Output Format
**Context:** [Situation in workshops and construction sites] | **Objective:** [What this must achieve] | **Audience:** [homeowners, builders and commercial clients and other stakeholders]

The finished output is a metrics dashboard definition and an interpretation/action review, structured as:
1. Summary of position and evidence
2. Detail, following the workflow above
3. Decisions, actions, owners and dates
4. Review point and escalation route

### Action Plan
1. **Immediate:** Confirm scope, consent and the evidence available in cutting lists.
2. **Short-term:** Complete the workflow steps and record outcomes against job completion times.
3. **Medium-term:** Review results, close actions, and update local procedures in workshops and construction sites.

## Success Metrics
| Metric | Target | Method |
|--------|--------|--------|
| job completion times | Agree a local target and track the trend | Measured from cutting lists and reviewed on a set cycle |
| material waste rates | Agree a local target and track the trend | Measured from cutting lists and reviewed on a set cycle |
| snagging rates | Agree a local target and track the trend | Measured from cutting lists and reviewed on a set cycle |
| customer satisfaction | Agree a local target and track the trend | Measured from cutting lists and reviewed on a set cycle |

## Guardrails & Quality Checks
- Never let this happen: machinery injuries.
- Never let this happen: measurement errors wasting material.
- Never let this happen: structural work done wrong.
- Work only within the competence and authority of a carpenter; escalate or refer anything beyond it.
- Record facts and observations, not speculation, and keep records confidential to workshops and construction sites's rules.
- Verify names, dates, figures and measurements twice before anything is issued or signed off.
- Use only real, verified information from the case in hand — never invent results, credentials or evidence.

## Example (illustrative)
A carpenter in workshops and construction sites applies this workflow for homeowners, builders and commercial clients: they open
cutting lists, work through the five steps using power saws, and close by recording
the outcome against job completion times and agreeing the next review date. (Illustrative example only —
replace with the real details of the case in hand.)

