# Masonry Risk Assessment

> Identify, score and control the risks in work for builders, homeowners and heritage organisations in construction sites and historic buildings. TRIGGERS - Use when a mason and bricklayer needs a risk assessment for builders, homeowners and heritage organisations in construction sites and historic buildings.

- Skill: `lionelsimai/masonry-risk-assessment` (Agent Skill)
- Install (CLI): `npx get-skill add lionelsimai/masonry-risk-assessment`
- Raw SKILL.md: https://api.skillmd.com/api/skills/lionelsimai/masonry-risk-assessment/raw
- Safety review: pending (external: skill-scanner PASS, skillspector PASS)
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Coding & Dev Tools
- License: MIT
- Author: lionelsimai (https://skillmd.com/u/lionelsimai)
- Updated: 2026-11-12
- Page: https://skillmd.com/skills/lionelsimai/masonry-risk-assessment

---

# Risk Assessment — Masonry

Identify, score and control the risks in work for builders, homeowners and heritage organisations in construction sites and historic buildings. The deliverable is a risk assessment with likelihood/impact scores, controls and owners.
This skill is written for a mason and bricklayer working with builders, homeowners and heritage organisations in construction sites and historic buildings.

## When to use
- You are a mason and bricklayer preparing, delivering or reviewing this part of your work in construction sites and historic buildings.
- You need a defensible, repeatable approach that produces a risk assessment with likelihood/impact scores, controls and owners.
- A colleague, auditor or client asks how this was done and what evidence supports it.

## Key Concepts
| Term | Meaning |
|------|---------|
| Lime mortar | a breathable mortar used on historic buildings |
| Course | a continuous horizontal layer of bricks or stones |
| Pointing | filling and finishing the joints between bricks or stones |

## Workflow
1. **Step 1** - Map the activity step by step and list what could go wrong at each stage for builders, homeowners and heritage organisations and staff
2. **Step 2** - Score each risk for likelihood and impact, giving special weight to structural defects from poor work
3. **Step 3** - For every high risk, define a control that removes, reduces or contains it, using trowels and levels where relevant
4. **Step 4** - Record the assessment in laying records, assign an owner to each control, and set a review date
5. **Step 5** - Brief everyone involved before work starts; stop and reassess if conditions in construction sites and historic buildings change

## Profession-Specific Components
| Component | Details for Masonry |
|-----------|-------------------------------|
| Core documentation | laying records; material specifications; job cards; survey notes |
| Core tools & equipment | trowels and levels; mixers; scaffolding; stone cutting tools |
| People involved | builders, homeowners and heritage organisations; the mason and bricklayer; colleagues and other services in construction sites and historic buildings |
| Primary record | laying records — keep it current, dated and attributable |

## Output Format
**Context:** [Situation in construction sites and historic buildings] | **Objective:** [What this must achieve] | **Audience:** [builders, homeowners and heritage organisations and other stakeholders]

The finished output is a risk assessment with likelihood/impact scores, controls and owners, structured as:
1. Summary of position and evidence
2. Detail, following the workflow above
3. Decisions, actions, owners and dates
4. Review point and escalation route

### Action Plan
1. **Immediate:** Confirm scope, consent and the evidence available in laying records.
2. **Short-term:** Complete the workflow steps and record outcomes against work completion rates.
3. **Medium-term:** Review results, close actions, and update local procedures in construction sites and historic buildings.

## Success Metrics
| Metric | Target | Method |
|--------|--------|--------|
| work completion rates | Agree a local target and track the trend | Measured from laying records and reviewed on a set cycle |
| defect rates | Agree a local target and track the trend | Measured from laying records and reviewed on a set cycle |
| material waste | Agree a local target and track the trend | Measured from laying records and reviewed on a set cycle |
| client satisfaction | Agree a local target and track the trend | Measured from laying records and reviewed on a set cycle |

## Guardrails & Quality Checks
- Never let this happen: structural defects from poor work.
- Never let this happen: falls and manual handling injuries.
- Never let this happen: heritage damage.
- Work only within the competence and authority of a mason and bricklayer; escalate or refer anything beyond it.
- Record facts and observations, not speculation, and keep records confidential to construction sites and historic buildings's rules.
- Verify names, dates, figures and measurements twice before anything is issued or signed off.
- Use only real, verified information from the case in hand — never invent results, credentials or evidence.

## Example (illustrative)
A mason and bricklayer in construction sites and historic buildings applies this workflow for builders, homeowners and heritage organisations: they open
laying records, work through the five steps using trowels and levels, and close by recording
the outcome against work completion rates and agreeing the next review date. (Illustrative example only —
replace with the real details of the case in hand.)

