# Uplan

> Use after design to turn a validated spec into a lean implementation plan. Outputs the `## Plan` section of the task file — files, line numbers, class/method names, invariants, test strategy, order. Ends with a scope-creep / simpler-way check.

- Skill: `megabadcoder/uplan` (Agent Skill)
- Install (CLI): `npx skillmds@latest add megabadcoder/uplan`
- Raw SKILL.md: https://api.skillmd.com/api/skills/megabadcoder/uplan/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Productivity
- Author: MegaBadCoder (https://skillmd.com/u/megabadcoder)
- Updated: 2026-09-22
- Page: https://skillmd.com/skills/megabadcoder/uplan

---


# Plan

Convert the approved Design into a lean, concrete implementation plan. Output fills the `## Plan` section of `docs/tasks/<slug>.md`. The plan is the contract that `up:uexecute` will follow.

## What a plan is

Plan answers: how do we get from where we are now to the Design's vision? It's the delta — the concrete path from current code to the approved spec. Design owns what it should be; Plan owns how we get there from here.

A plan is the minimum information an engineer needs to implement the Design without re-doing the thinking. That means:

- Concrete locations: exact file paths, line number ranges, class/method/interface names. "Modify `parser.py`" is not enough — `parser.py:120-160, Parser.tokenize()` is.
- Per-file change bullets: what changes in each file, by name. Not prose.
- Interface signatures: new or changed function/method signatures. No bodies.
- Phases with commits: ordered phases, one commit per phase minimum.
- Test strategy: the behaviors to cover, not test code.
- Snippets only where words fail: one regex, one tricky algorithm, one non-obvious API call. Never full implementations.

If an engineer could read your plan and implement the wrong thing, the plan is incomplete. If they need to re-derive the Design to understand the plan, the plan is bloated.

## Scope is decided in design, not here

By the time you plan, the task's scope is fixed. If you discover a subsystem-split issue now, it means design missed it — stop planning, go back to the user, and decide whether to re-open design or keep the current scope.

Do **not** silently split the task here. Do not silently expand it either.

## Output

Fill `## Plan` in `docs/tasks/<slug>.md`. Do not create a separate plan file.

## Brevity

<required>
Before writing the Plan, read `skills/_brevity.md`. Apply its five principles (omit / evidence-on-surprise / don't-re-narrate / one-sentence / soft-caps). Treat every subsection in the Format block below as optional — include only when the content is non-default. Failures, deviations, deferrals, and known risks always include evidence.
</required>

## Process

<required>
1. Read the task file's `## Context`, `## Design`, `### Invariants` (IV), `### Principles` (PC), `### Assumptions` (AS), `### Unknowns` (UK). Know what you're planning for.
2. Sketch the file structure — which files change, which are new, which classes/methods. Fold an in-scope or easy-win smell you pass into a phase; record the rest to `## Code smells` (see `_principles.md` → Incidental code smells).
3. Break into phases. Each phase is a coherent commit.
4. Write phase-by-phase plan entries. Concrete locations, per-file bullets, interfaces.
5. Write test strategy (per task's TDD decision).
6. Write order + dependencies, open questions, risks, rollback.
7. Add snippets only for the single most critical component per phase.
8. Backwards-compat check — restate Design's compat risks in concrete plan terms.
9. Self-review inline (placeholders, consistency, invariants, spec coverage).
10. Scope-creep / simpler-way check — see below. This is the final step before handoff.
11. Present the plan to the user. In interactive mode, wait for approval, then invoke `up:uexecute`. In hands-off mode (task-file `**Mode:** hands-off`), auto-invoke `up:uexecute` after presenting, and log `- uplan: plan auto-approved (hands-off)` to `## Conclusion → ### Hands-off decisions`.
</required>

## Required contents

Required always:
- Approach: 1-2 sentences on the strategy and why it fits the Design
- File structure: for each file, `path/to/file.ext:lineA-lineB` (create|modify) + affected class/method names
- Per-file bullets: what changes, by name
- New/changed interfaces: signatures only
- IV/PC/AS referenced by ID: which Design entities each phase preserves or relies on

## ID conventions in Plan

Plan introduces two entity types, numbered within the task file:

- PH1, PH2, … — Phases. Each phase heading is `### PH<N> — <name>`.
- RK1, RK2, … — Risks. Each is one sentence.

References to Design entities use IDs (IV3, AS1, UK2) — never re-quote the full sentence.

Required when relevant (omit the subsection when it would say "single phase, no deps", "none", or similar):
- Test strategy: behaviors to cover. If `TDD: yes`, list the failing tests to write first.
- Order + dependencies: phases, what blocks what
- Open questions / risks / rollback: what could go wrong, how to back out
- Interfaces: declare cross-phase contracts when ≥2 phases share a signature / anchor / API shape. Omit for single-phase plans.
- Interface graph: declare phase shape when ≥2 phases exist. Omit for single-phase plans.

Optional:
- Code snippets: only for the most critical component per phase. If tempted to include full code, you're over-planning.

## Format

```markdown
## Plan

Approach: <1-2 sentences>

### PH1 — <name>

- **1.1** `path/to/file.ext:lineA-lineB` (create|modify)
  - `ClassName.method_name(arg: Type) -> Ret` — <what changes, by name>
  - Respects: IV2, AS1
- **1.2** ...
- Commit: `<message>`

### PH2 — <name>
...

### Test strategy   (optional — omit if no tests / doc-only)
<behavior list, per file or per phase>

### Order & dependencies   (optional — omit for single-phase or obviously-sequential plans)
<what blocks what, parallelizable phases>

### Risks / rollback   (optional — omit if none non-trivial)
- RK1 — <one-sentence risk and mitigation>
- RK2 — <...>

### Interfaces   (optional — omit for single-phase plans)
- IF1 — `<signature>` — <contract sentence>
- IF2 [blocks] — `<signature>` — <contract sentence> (consumer must wait for producer; see "Blocking interfaces" below)

### Interface graph   (optional — omit for single-phase plans)
- PH1              -> IF1, IF2   @ skills/foo/SKILL.md
- PH2  IF1         -> IF3        @ skills/bar/SKILL.md
- PH3  IF2, IF3 ->               @ agents/baz/AGENT.md
```

## When to declare interfaces

- An interface is a cross-phase contract: a function/method signature, a shared SKILL.md section anchor, or any API shape that one phase produces and another phase consumes.
- The consume arrow (`IF<N> ->`) means runtime coupling — one phase's output is the other phase's input. Doc-only phases that merely reference a prior phase's plan text are sources, not consumers; leave the consume side empty (the line starts with `PH<N>  -> <produces>`).
- `@ <paths>` marks the filesystem boundary for each phase. Paths declared by phases in the same wave must be disjoint; `up:uexecute` uses this to detect boundary violations after each commit.
- Waves are derived from the graph by topo-sort over `[blocks]` edges only — non-blocking IF edges (the default) do not create wave boundaries, since the IF declaration is sufficient context for the consumer. Phases linked only by non-blocking IFs land in the same wave and run in parallel. Do not hand-declare waves; declare the graph and the blocking flags, and let the executor derive them.
- Omit both `### Interfaces` and `### Interface graph` for single-phase plans.

## Blocking interfaces

By default, an IF is non-blocking: its declared signature is the contract, and a consumer can be implemented in parallel with the producer (the wiring check reconciles any drift after the wave). Mark an IF `[blocks]` when:

- The consumer needs the producer's actual output, not just the signature — e.g. a generated config file, an applied DB migration, a fixture that must exist on disk, a doc anchor that must resolve at lint time.
- The producer is large, risky, or critical enough that the planner does not want dependent work running concurrently — better to land it, verify it, then build on top. Planner/dispatcher discretion.

Use `[blocks]` sparingly — every block reduces parallelism. The default of non-blocking is correct for ordinary code interfaces (function signatures, class shapes, SKILL.md anchors) where the IF declaration carries the contract.

## Self-review (inline, no subagent)

<required>
1. Spec coverage — every IV / PC / AS / UK item maps to at least one plan bullet, or is explicitly deferred to execute / verify.
2. Placeholder scan — no "TBD", "handle edge cases", "add validation", "similar to task N", "write tests for the above".
3. Consistency — method/class names match across bullets; later phases' interfaces reference what earlier phases define.
4. Leanness — plan size should fit the task. If it exceeds ~1 screen per day of expected work, trim.
5. IV / AS coverage — each IV and AS has a referencing bullet somewhere (by ID).
6. If `### Interface graph` is present: every phase declares `@ <paths>`; paths declared by phases in the same wave are disjoint (where waves are derived by topo-sort over `[blocks]` edges); every IF consumed by any phase is defined in `### Interfaces`; every IF defined is produced by exactly one phase; every `[blocks]` annotation has a stated reason in the IF's contract sentence.
</required>

Fix issues inline. No re-review loop.

## Backwards-compat check — restate the design's risks in plan terms

<required>
Design should already have surfaced backwards-compat risks. In the plan, restate each one with its concrete phase and the mitigation step. If you discover a new break the Design missed (schema rename in phase 2, config key no longer read, output format drift), stop planning and go back to the user — don't smuggle it in.
</required>

<good-example>
"Phase 3 renames `log_level` → `logging.level`. Per Design decision, Phase 3 also adds a one-release compat read of the old key with a deprecation warning. Removal is out of scope for this task."
</good-example>

<bad-example>
Plan includes a schema migration with no mention of the compat strategy. Execute runs the migration; the old service version in prod breaks on the next deploy.
</bad-example>

If the task is greenfield, skip this check explicitly in one line.

## Default principles

<required>
Read `skills/_principles.md` before sketching phases. Every phase must be consistent with GPC1–GPC8; where a phase deviates, the bullet names the GPC and the reason in one line (e.g. "breaks GPC3 — single call site, split would obscure the flow").
</required>

## Final check — scope creep, elegance, simpler way

<required>
Before handing off to the user, check:

1. Scope creep: is every phase directly serving the Design, or have I snuck in "while I'm here" refactors, extra validation layers, speculative generality?
2. Elegance: can any pair of phases merge? Are there accidental duplicate data paths? Does the plan introduce abstractions that aren't pulling their weight?
3. Simpler way: is there a one-paragraph alternative plan that gets 90% of the value with 30% of the work? If yes, propose it to the user as an option.
</required>

<good-example>
"Plan says 7 phases. It's really 3 — phases 4-7 are a generalization layer for a second caller that doesn't exist. Cut to 3, flag the generalization as future work."
</good-example>

<bad-example>
"Plan is 12 phases. I'll just hand it off — the user can decide what to cut." No. That's the agent's job here, not the user's.
</bad-example>

If this check surfaces real simplifications, rewrite the plan. Don't stack warnings on top of a bloated plan.

## Hands-off mode

See `up:handsoff` for the full contract. Stage-specific delta: skip the approval wait — present the plan highlights, log `- uplan: plan auto-approved` to `### Hands-off decisions`, invoke `up:uexecute` directly. Self-review, scope-creep check, and backwards-compat restatement are unchanged. Ambiguities that would require a user call go to `### Deferred (needs user input)` and the plan stops — do not guess around them.

## Terminal state

Plan written, self-reviewed, scope-checked. Interactive: present highlights, wait for approval, invoke `up:uexecute`. Hands-off: present highlights, log auto-approval, invoke `up:uexecute`.