# Risk Register Builder

> This skill builds and maintains a product risk register that identifies, categorises, and scores delivery, market, and technical risks for an initiative or release. Use when asked to assess risks before committing to a roadmap slot, sprint plan, or go-live decision. Also consider when a project has changed scope significantly and existing risk assumptions may be stale. Suggest when the user is about to approve a launch or major milestone without a documented risk assessment.

- Skill: `mittuled/risk-register-builder` (Agent Skill, multi-file: 3 files)
- Install (CLI): `npx skillmds@latest add mittuled/risk-register-builder`
- Raw SKILL.md: https://api.skillmd.com/api/skills/mittuled/risk-register-builder/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Product & Planning
- Author: mittuled (https://skillmd.com/u/mittuled)
- Updated: 2026-09-17
- Page: https://skillmd.com/skills/mittuled/risk-register-builder

---


# risk-register-builder

## Agent: Product Manager
L2 product manager (multi-instance) responsible for customer discovery, requirements extraction, sprint planning, backlog management, and go-live approval. Bridges customer needs and engineering delivery.

Department ethos: [ideal-product.md](../../../../departments/product/ideal-product.md)

## Skill Description
Builds and maintains the product risk register, identifying delivery, market, and technical risks with likelihood and impact scores, mitigation plans, and ownership assignments.

## When to Use
- When a new initiative is entering the roadmap and needs a formal risk assessment before resources are committed
- When an in-flight project encounters scope changes, dependency shifts, or team changes that invalidate prior risk assumptions
- When preparing for a go/no-go decision on launch and stakeholders need a consolidated view of outstanding risks and their mitigations
- When a post-mortem reveals risks that were known but undocumented, signalling that the risk capture process has gaps

## Workflow
1. **Define risk scope**: Establish the boundaries of the assessment — which initiative, release, or milestone is covered. Identify the decision the register will inform (roadmap placement, sprint commitment, go-live approval). Deliverable: one-paragraph scope statement naming the initiative, time horizon, and decision context.
2. **Identify risk candidates**: Conduct a structured risk brainstorm across four categories — delivery (schedule, staffing, dependencies), technical (architecture, scalability, integration), market (competition, timing, adoption), and compliance (regulatory, data privacy, contractual). Source risks from engineering estimates, discovery findings, competitive intel, and past post-mortems. Deliverable: flat list of candidate risks with source attribution.
3. **Score likelihood and impact**: Rate each risk on a 3-point scale for likelihood (low/medium/high) and impact (low/medium/high). Compute a composite risk score (likelihood x impact mapped to a 1-9 grid). Sort by composite score descending. Deliverable: scored risk table with columns for ID, category, description, likelihood, impact, composite score, and source.
4. **Assign ownership and mitigation**: For each medium- and high-severity risk, define a mitigation strategy (avoid, reduce, transfer, or accept) and assign a named owner responsible for executing it. Set a review-by date. For low-severity risks, document the accept rationale. Deliverable: mitigation plan appended to each risk row — strategy, owner, action items, and review date.
5. **Identify risk dependencies and cascades**: Map which risks compound each other — e.g., a staffing risk that amplifies a schedule risk. Flag cascade chains where one risk materialising triggers downstream risks. Deliverable: dependency notes on linked risk rows, with cascade chains highlighted.
6. **Define trigger thresholds**: For each high-severity risk, define a leading indicator that signals the risk is materialising — e.g., "if API latency exceeds 500ms in staging, the scalability risk has triggered." Specify the escalation path when a trigger fires. Deliverable: trigger column added to the risk table with indicator, threshold, and escalation action.
7. **Validate with cross-functional leads**: Review the full register with engineering, design, and business stakeholders. Confirm scoring accuracy, mitigation feasibility, and ownership assignments. Capture dissenting opinions as register annotations. Deliverable: sign-off record or revision log with dissent notes.
8. **Establish review cadence**: Set a recurring review schedule tied to the initiative's rhythm — per-sprint for active delivery, monthly for roadmap-level risks. Define the update process: who reviews, what triggers an ad-hoc re-score, and where the living register is stored. Deliverable: review schedule and process note appended to the register header.

## Anti-Patterns
- **Risk theatre**: Creating a register once to satisfy a process gate, then never updating it. *Why*: A stale register is worse than none — it creates false confidence that risks are managed while actual conditions drift unchecked.
- **Uniform scoring**: Rating all risks as "medium/medium" to avoid difficult prioritisation conversations. *Why*: Flat scoring eliminates the signal the register exists to provide — it prevents the team from focusing mitigation effort where it matters most.
- **Mitigation without ownership**: Documenting a mitigation strategy like "monitor closely" without a named owner or concrete action. *Why*: Unowned mitigations are indistinguishable from wishes — no one is accountable, so the mitigation never executes.
- **Ignoring cascade effects**: Treating each risk as independent when several share root causes or amplify each other. *Why*: Cascade-blind registers undercount total exposure and produce mitigation plans that address symptoms while the shared root cause persists.
- **Excluding non-technical risks**: Limiting the register to engineering and infrastructure risks while ignoring market timing, regulatory, or adoption risks. *Why*: Product failures are more often caused by market and business risks than by technical ones — an incomplete register misallocates mitigation effort.

## Output
**On success**: A living risk register document containing scored risks across delivery, technical, market, and compliance categories, each with mitigation strategy, owner, trigger thresholds, and review cadence — formatted as a markdown table with a header section summarising scope, total risk count, and high-severity count. Suitable for embedding in a PRD, attaching to a go/no-go decision brief, or maintaining as a standalone artefact linked from the initiative tracker.

**On failure**: Report which risk categories could not be assessed (missing engineering estimates, unavailable competitive data, absent compliance guidance), which stakeholders did not participate in validation, and recommend specific information-gathering actions to complete the register. Flag any high-severity risks that were identified but lack feasible mitigation — these require immediate escalation regardless of register completeness.

## Related Skills
- [`backlog-groomer`](../backlog-groomer/SKILL.md) — sibling skill under the same agent — combine with backlog-groomer for end-to-end coverage
- [`backlog-populator`](../backlog-populator/SKILL.md) — sibling skill under the same agent — combine with backlog-populator for end-to-end coverage
- [`customer-discovery-planner`](../customer-discovery-planner/SKILL.md) — sibling skill under the same agent — combine with customer-discovery-planner for end-to-end coverage
- [`demand-validator`](../demand-validator/SKILL.md) — sibling skill under the same agent — combine with demand-validator for end-to-end coverage
- [`dependency-mapper-review`](../dependency-mapper-review/SKILL.md) — sibling skill under the same agent — combine with dependency-mapper-review for end-to-end coverage
- [`dependency-resolver`](../dependency-resolver/SKILL.md) — sibling skill under the same agent — combine with dependency-resolver for end-to-end coverage
- [`design-approval`](../design-approval/SKILL.md) — sibling skill under the same agent — combine with design-approval for end-to-end coverage
- [`flow-designer-review`](../flow-designer-review/SKILL.md) — sibling skill under the same agent — combine with flow-designer-review for end-to-end coverage
- [`go-live-approver`](../go-live-approver/SKILL.md) — sibling skill under the same agent — combine with go-live-approver for end-to-end coverage
- [`internal-demo-runner`](../internal-demo-runner/SKILL.md) — sibling skill under the same agent — combine with internal-demo-runner for end-to-end coverage
- [`jtbd-to-stories`](../jtbd-to-stories/SKILL.md) — sibling skill under the same agent — combine with jtbd-to-stories for end-to-end coverage
- [`launch-checklist-runner`](../launch-checklist-runner/SKILL.md) — sibling skill under the same agent — combine with launch-checklist-runner for end-to-end coverage
- [`market-sizer`](../market-sizer/SKILL.md) — sibling skill under the same agent — combine with market-sizer for end-to-end coverage
- [`milestone-definer`](../milestone-definer/SKILL.md) — sibling skill under the same agent — combine with milestone-definer for end-to-end coverage
- [`performance-budget-setter`](../performance-budget-setter/SKILL.md) — sibling skill under the same agent — combine with performance-budget-setter for end-to-end coverage
- [`phase-planner`](../phase-planner/SKILL.md) — sibling skill under the same agent — combine with phase-planner for end-to-end coverage
- [`phase-scope-adjuster`](../phase-scope-adjuster/SKILL.md) — sibling skill under the same agent — combine with phase-scope-adjuster for end-to-end coverage
- [`pmm-pre-briefer`](../pmm-pre-briefer/SKILL.md) — sibling skill under the same agent — combine with pmm-pre-briefer for end-to-end coverage
- [`requirements-extractor`](../requirements-extractor/SKILL.md) — sibling skill under the same agent — combine with requirements-extractor for end-to-end coverage
- [`story-writer`](../story-writer/SKILL.md) — sibling skill under the same agent — combine with story-writer for end-to-end coverage
- [`roadmap-placer`](../roadmap-placer/SKILL.md) — sibling skill under the same agent — combine with roadmap-placer for end-to-end coverage
- [`scope-boundary-setter`](../scope-boundary-setter/SKILL.md) — sibling skill under the same agent — combine with scope-boundary-setter for end-to-end coverage
- [`spec-translator`](../spec-translator/SKILL.md) — sibling skill under the same agent — combine with spec-translator for end-to-end coverage
- [`sprint-planner`](../sprint-planner/SKILL.md) — sibling skill under the same agent — combine with sprint-planner for end-to-end coverage
- [`sprint-reviewer`](../sprint-reviewer/SKILL.md) — sibling skill under the same agent — combine with sprint-reviewer for end-to-end coverage
- [`support-pre-briefer`](../support-pre-briefer/SKILL.md) — sibling skill under the same agent — combine with support-pre-briefer for end-to-end coverage
- [`third-party-integrator-review`](../third-party-integrator-review/SKILL.md) — sibling skill under the same agent — combine with third-party-integrator-review for end-to-end coverage
- [`uat-coordinator`](../uat-coordinator/SKILL.md) — sibling skill under the same agent — combine with uat-coordinator for end-to-end coverage
- [`user-researcher`](../user-researcher/SKILL.md) — sibling skill under the same agent — combine with user-researcher for end-to-end coverage