# Checklist Design

> checklist design principle. checklist-designer agent execution inspectiontable and quality designto do when reference. 'checklist design', 'quality ', 'inspectiontable writing' request when usage. However, checklist development specialist whensystem building scope outside.

- Skill: `revfactory/checklist-design` (Agent Skill, multi-file: 2 files)
- Install (CLI): `npx skillmds@latest add revfactory/checklist-design`
- Raw SKILL.md: https://api.skillmd.com/api/skills/revfactory/checklist-design/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: AI & ML
- Author: revfactory (https://skillmd.com/u/revfactory)
- Updated: 2026-09-17
- Page: https://skillmd.com/skills/revfactory/checklist-design

---


# Checklist Design — checklist design principle

checklist-designer agent checklist quality design principle and pattern.

## checklist type classification

### Atul Gawande classification (The Checklist Manifesto)

| type | description | usage timing |
|------|------|----------|
| DO-CONFIRM | task after confirm | specialist basis00M dependency degree |
| READ-DO | orderversus execution | reportspecialist/basis task/risk task |
| COMMUNICATION | team between information deliver | personnumberpersontotal, versus |

### SOP annualtotal type

| checklist type | SOP mapping | examplewhen |
|---------------|---------|------|
| companybefore inspection | procedure whenwork before preparation confirm | equipment inspection, re- preparation |
| stageby confirm | each procedure stage complete confirm | , quality company |
| complete verify | procedure after result confirm | final number, personnumber standard |
| basis company | cyclequality operations status inspection | monthbetween planbefore inspection, minutebasis company |

## checklist writing 7principle

### 1. MECE (Mutually Exclusive, Collectively Exhaustive)
- item between during None
- overall 
- categoryby 

### 2. item = confirm
** example**: "from status and annual confirm"
** example**: "from process execution duringpersondegree confirm" + " ping confirm"

### 3. verify possibleKorean standard specify
** example**: " also qualityKoreandegree confirm"
** example**: " also 18~22°C scopepersondegree confirm ( position: during from)"

### 4. 5~9item rule (Killer Items during)
- overall item during core risk item only by
- 9item exceeding when category minute
- " also planbeforeKorean item" 

### 5. order = task flow
- actual task order and dayvalue
- dependency total reflected (A complete after B)

### 6. example processing 
- fail when action procedure specify
- standard included

### 7. cyclequality items
- usage feedback reflected (minutebasis 1)
- company/personwhen after i.e.when 

## checklist template

### READ-DO checklist (stageby execution)

```markdown
# [taskpeople] checklist
- version: v1.0 | final revision: 2025-01-15 | person: 

## companybefore preparation
-  needed tool/re- preparation?
-  task authority confirm?
-  before stage deliverable personnumber?

## execution stage
-  stage 1: [specific action] → standard: [figure/condition]
-  stage 2: [specific action] → standard: [figure/condition]
-  stage 3: [specific action] → standard: [figure/condition]

## complete confirm
-  deliverable standard : [standard]
-  next stage person responsibleto persontotal?

## fail when action
- standard un- item → [person responsible]to reporting
- re-task needed when → [procedure] reference
```

### DO-CONFIRM checklist (companyafter confirm)

```markdown
# [taskpeople] confirm checklist
- daywhen: ______ | confirmspecialist: ______

| # | confirm item | standard | result | notes |
|---|----------|------|------|------|
| 1 | [item] | [standard] | □pass □fail | |
| 2 | [item] | [standard] | □pass □fail | |

- total ___case during pass ___case, fail ___case
- fail action: ___________________
```

## quality design

### standard setting

| element | description |
|------|------|
| standard | company basis for minimum condition |
| required item | mustwhen item (1case also failure when fail) |
| optional item | fail also conditiondepartment and possible |
| and standard | required 100% + optional N% or more |
| conditiondepartment and | when action plan when Koreanwhenquality |

### review process

```
1. deliverable ( specialistto)
2. checklist based review
3. : PASS / CONDITIONAL / FAIL
4. CONDITIONAL: when deadline setting → re-company
5. FAIL: before stage exchange → re-task
```

## checklist quality checklist

| item | standard |
|------|------|
| item number | category 5~9items |
| verify standard | all item quality standard |
| example | fail when action specify |
| responsibilityspecialist | confirmspecialist/approver specify |
| version information | version, date, approver |
| consistency | SOP procedure document and day |

