# Mission Spliter

> Split clarified requirements into phased missions AND accept each phase as it completes. Plans stage goals, deliverables, dependencies, task order, and a per-phase acceptance gate; then, after each phase is implemented, runs that gate against real evidence (Pass/Partial/Fail) before the next phase may start, and finally rolls phase verdicts up into one delivery acceptance. Use after requirements are clarified (by the user or Initer), before and during implementation of a project, major feature, workflow, integration, refactor, or multi-step task. If requirements are still unclear, hand back to clarification before splitting.

- Skill: `ruosong320/mission-spliter` (Agent Skill, multi-file: 2 files)
- Install (CLI): `npx skillmds@latest add ruosong320/mission-spliter`
- Raw SKILL.md: https://api.skillmd.com/api/skills/ruosong320/mission-spliter/raw
- Safety review: pending
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Integrations & APIs
- Author: Ruosong320 (https://skillmd.com/u/ruosong320)
- Updated: 2026-09-22
- Page: https://skillmd.com/skills/ruosong320/mission-spliter

---


# Mission Spliter & Acceptor

This skill owns two jobs that used to be split across planning and a final acceptance gate:

1. **Plan** — turn clarified requirements into an executable phased plan.
2. **Accept per phase** — verify each phase against real evidence at its own gate, the moment that phase is implemented, before the next phase starts. The final delivery acceptance is a rollup of the phase verdicts plus cross-cutting checks, not a separate end-of-project scramble.

Verification is pushed to where the work happens. "Not run" is never "pass." A phase is not done until its gate is green.

## Core Rule

Do not split vague work. First verify the requirement boundary is clear enough to plan. If goal, scope, acceptance criteria, main workflows, data/state, or technical constraints are unclear, ask targeted questions or hand back to Initer before creating stages.

Once planning starts, every phase must carry a **concrete, executable acceptance gate** defined up front — the exact command, check, screenshot, or observation that will prove the phase works. A gate you cannot execute is not a gate; rewrite it until it is checkable. If no checkable form exists at all, take the unrunnable-gate row of `When The Phase Plan Breaks` rather than shipping an unverifiable phase as verified.

## Required Inputs

Collect or infer: original request; clarified requirements or Initer build brief; included/excluded scope; acceptance criteria; technical constraints and repo conventions; known dependencies, blockers, risks, deadlines; verification expectations.

If an input is missing but low risk, state the assumption. If it can change the plan meaningfully, ask before splitting.

## Workflow

### 1. Confirm Planning Readiness

State: `Ready` | `Needs Clarification` | `Blocked`. Do not split a `Blocked` mission.

### 2. Define The Mission

Summarize goal, final deliverable, success criteria, out-of-scope items, primary risks. Reference the single source of truth (the build brief / project record) — do not re-author scope prose that already exists elsewhere; link to it and note only deltas.

### 3. Split Into Phases

Prefer 3-6 phases for substantial work; fewer for small features. Each phase must be an **independently inspectable unit of real behavior** — not a template slot. If two "phases" touch the same file with no separately verifiable outcome between them, merge them.

Each phase includes:

- Objective.
- Deliverables.
- Tasks (ordered by dependency).
- Dependencies (what must exist first).
- **Acceptance gate** — the concrete, executable check that proves this phase, with its expected result. Specify the method (command/test/screenshot/observed behavior) and the pass condition.
- Exit criteria.
- Risks / unknowns.

### 4. Order Tasks By Dependency

Within each phase: discovery → architecture/interface decisions → data model/contracts → core implementation → external surfaces/UI → verification → record update → phase acceptance. Adjust to fit the project.

### 5. Execute Each Phase With Its Gate

**🔴 CHECKPOINT — before executing the first phase, and again whenever a phase boundary moves or a requirement changes mid-flight, run this check. Any "yes": work from the named row of `When The Phase Plan Breaks` before proceeding, instead of proceeding and reconciling at the rollup.**

- **Is this phase's acceptance gate not executable as written?** → the row beginning *"A phase's acceptance gate cannot be executed as written"*.
- **Did this phase fail its gate for a reason outside the phase — a wrong boundary, a mis-ordered dependency, or a phase that is not independently inspectable?** → the row beginning *"A phase fails its gate and the cause is not inside the phase"*.
- **Has a requirement changed since the plan was confirmed?** → the row beginning *"A requirement changes after the plan was confirmed"*.
- **Does the next phase depend on a `Partial` the user has not explicitly accepted?** → the row beginning *"A phase can only be finished as `Partial`"*.

For every phase, in order:

1. Implement the phase tasks.
2. Update the Recoder record for the phase's change points (including the work path / problem-solving notes Recoder now captures).
3. **Run the phase acceptance gate against real evidence** using the rubric below. Capture the evidence (command output, test result, screenshot, observed behavior) — do not assert success from code reading alone when the behavior is observable.
4. **🛑 STOP — assign the verdict from evidence captured at this phase's own gate, never from the fact that the tasks were completed.** If the gate is green but the phase's real behavior is visibly wrong, stop and take the row beginning *"The gate is green but the phase's real behavior is visibly wrong"* before accepting it. A `Pass` requires direct evidence covering that gate's pass condition; when that evidence was not obtained, the verdict is `Not Verified` or `Partial`, never `Pass`. Then mark the phase `Pass` / `Partial` / `Fail` / `Not Verified`. Only a `Pass` (or an explicitly user-accepted `Partial`) unlocks the next phase. A `Fail` stays in the current phase until fixed.

This replaces the old "verify everything at the end" model. By the time the last phase passes, delivery is already substantially verified.

### 6. Final Rollup Acceptance

After the last phase, produce the delivery acceptance as a **rollup**, not a re-do:

- Aggregate the per-phase verdicts.
- Run only the cross-cutting checks that no single phase covered: end-to-end workflow, security/privacy constraints, handoff readiness, and that excluded scope was not accidentally built.
- Confirm the Recoder record is complete and non-contradictory. If a `Partial` accepted earlier turns out to be load-bearing here, take the row beginning *"A `Partial` accepted earlier turns out to be load-bearing"* before issuing the rollup verdict.
- Decide overall status: `Pass` | `Conditional Pass` | `Fail`.

## Per-Phase Acceptance Rubric

Apply at each phase gate and at the final rollup.

Mark each checked item:

- `Pass`: implemented and verified with real evidence.
- `Partial`: works with a stated, non-blocking limitation.
- `Fail`: missing, broken, or contradicted by evidence.
- `Not Verified`: likely done but unchecked — treat as not done; either verify now or justify explicitly.
- `Out Of Scope`: explicitly excluded/deferred.

Evidence standard (match verification to risk):

- Run automated tests / build / lint / typecheck where available.
- Exercise the main workflow manually when behavior is observable.
- For visual or interactive work, capture a screenshot or drive the running app — do not accept "the code looks right."
- Cover edge cases and failure states that were in scope.
- Every `Partial` / `Fail` / `Not Verified` gets a concrete reason and next action.

Be strict about user-facing correctness, data integrity, security, and that the record matches reality.

## Decision Statuses (Final Rollup)

- `Pass`: all acceptance-critical items implemented, verified, recorded; only low-risk follow-ups remain.
- `Conditional Pass`: core goal works; non-blocking gaps remain (partial docs, deferred scope, minor polish) — state exactly what is and isn't accepted.
- `Fail`: any acceptance-critical item missing, broken, unverified at unacceptable risk, undocumented enough to block handoff, or contradicted by the record. State the minimum fixes required.

## When The Phase Plan Breaks

The workflow above assumes every gate is runnable, every phase boundary is right, and the requirement holds still. When it does not, handle it by this table — never carry a broken phase into a green rollup.

**This section is the exception clause for the workflow above: where it conflicts with "A `Fail` stays in the current phase until fixed", "only a `Pass` (or an explicitly user-accepted `Partial`) unlocks the next phase", or "split by independently verifiable outcome", this table governs — but only where one of its rows actually conflicts with that rule. When one situation matches more than one row, take the row whose first-line fix is the most conservative — a row that stops, asks, or declines to write outranks any row that proceeds. Every exception must still name the phase it touched in the rollup.**

| Trigger | First-line fix | Fallback if that fails |
|---|---|---|
| A phase's acceptance gate cannot be executed as written — no environment, no data, no reachable entry point | Rewrite the gate into the strongest check that *can* run against the real artifact (targeted command, fixture, screenshot, observed behavior), and record what it does not cover | If no executable check exists at all, mark the phase `Not Verified` rather than `Pass`, and state in the rollup exactly what a reviewer must inspect by hand and why automation was impossible |
| A phase fails its gate and the cause is not inside the phase — the boundary is wrong, a dependency was mis-ordered, or the phase is not independently inspectable | Re-cut or re-order the boundary before writing more code; state which boundary moved and why. The phase list is a draft, not a contract | If re-cutting would invalidate the confirmed plan, stop and take it to the user as a plan amendment rather than absorbing it silently. Re-run the gate of any merged phase and say which verdicts were superseded |
| A requirement changes after the plan was confirmed | Name the exact requirement and the exact phases whose gates it invalidates; redefine those gates before continuing | If the user wants to continue without re-planning, continue but mark every affected phase `Partial`, and lead the rollup with the fact that its gates no longer match the requirement |
| The gate is green but the phase's real behavior is visibly wrong — the gate did not cover the real requirement | Stop. Name the real behavior the gate fails to cover and strengthen the gate before accepting the phase | If the user insists the original gate is enough, accept it, but lead the rollup with: gate does not cover <X>, actual behavior is <Y> |
| A phase can only be finished as `Partial` and the next phase depends on it | Ask the user to accept that specific `Partial`, stating what is missing and what the next phase inherits | If the user does not respond and the work is reversible, hold the next phase rather than stacking on an unaccepted gap, and state the hold in the rollup |
| A `Partial` accepted earlier turns out to be load-bearing for the delivery | Re-open that phase, re-run its gate, and re-issue the verdict | If it cannot be re-opened, downgrade the rollup to `Conditional Pass` or `Fail` and name the phase explicitly — never carry a stale `Partial` into a `Pass` |

## Do Not

- Do not split by calendar, by file, or by layer — split by independently verifiable outcome.
- Do not write a gate that only restates its own task ("implemented X"). A gate is a check with an expected result.
- Do not mark a phase `Pass` from task completion, from code reading, or because the next phase is waiting.
- Do not absorb a wrong boundary, a changed requirement, or an unaccepted `Partial` silently — each one goes to its named row of `When The Phase Plan Breaks`.
- Do not let the rollup introduce a verdict that no phase gate produced.

## Splitting Heuristics

- Put uncertain or high-risk work early.
- Put irreversible migrations, destructive changes, and public-interface changes behind explicit gates.
- Separate foundation from feature behavior; keep phases small enough to validate, large enough to matter.
- Mark tasks parallel-safe only when files/data/responsibilities are disjoint.
- Fold the Recoder update and the acceptance gate into each phase — they are phase work, not afterthoughts.
- Where it helps execution, emit the phases as tasks via your environment's task tracker instead of keeping a parallel markdown list, so plan and tracker are one thing.

## Output Template

Use `assets/mission-split-plan-template.md` (relative to this skill's directory). It carries the per-phase acceptance gate and the rollup section. If it is unreachable, build the plan inline from the sections this skill names — phases with tasks, dependencies, and a gate each, plus the rollup — and say the template was not used.

## Final Planning Rules

- If the user asked for execution, start after presenting the plan when no blocking clarification remains; then execute phase-by-phase with gates.
- If the plan depends on user approval (preference/product judgment), stop after the plan and ask.
- Log plan creation and each phase's completion + acceptance verdict in the Recoder record.
- The final response leads with the rollup decision, names the strongest evidence and the most important gap, and never hides skipped checks or unresolved risks.