# Rakytap Sequential Quantum Gate Decomposer Sequential Quantum Gate Decomposer

> Spec-Driven Development (Density Matrix Project)

- Skill: `tomevault-io/rakytap-sequential-quantum-gate-decomposer-sequential-quantu` (Agent Skill, multi-file: 2 files)
- Install (CLI): `npx skillmds@latest add tomevault-io/rakytap-sequential-quantum-gate-decomposer-sequential-quantu`
- Raw SKILL.md: https://api.skillmd.com/api/skills/tomevault-io/rakytap-sequential-quantum-gate-decomposer-sequential-quantu/raw
- Safety review: pending (external: skill-scanner PASS, skillspector CAUTION)
- Works with: Claude Code, Claude.ai, OpenAI Codex
- Category: Coding & Dev Tools
- Author: tomevault-io (https://skillmd.com/u/tomevault-io)
- Updated: 2026-09-17
- Page: https://skillmd.com/skills/tomevault-io/rakytap-sequential-quantum-gate-decomposer-sequential-quantu

---


# Spec-Driven Development (Density Matrix Project)

**Scope:** `docs/density_matrix_project/` only — not other SQUANDER trees unless
the user explicitly extends scope.

This skill documents the working model for spec-driven development in that
documentation set. All phase work follows a layered hierarchy: contracts
first, then task mini-specs, then stories, then code.

**Path rule:** Phase artifacts always live under
`docs/density_matrix_project/phases/...` (no shorthand `phases/` from repo root).

## Source-of-Truth Documents

Phase work is driven by:

- `docs/density_matrix_project/planning/PLANNING.md` — high-level research plan
- `docs/density_matrix_project/planning/PUBLICATIONS.md` — publication strategy
- `docs/density_matrix_project/planning/` — ADRs, REFERENCES, etc.
- `docs/density_matrix_project/phases/<phase-dir>/` — phase-specific outputs

### Phase directories and sub-phases

- **Numeric phase:** `docs/density_matrix_project/phases/phase-2/`,
  `phase-3/`, etc.
- **Sub-phase (same artifact set, extended slug):** e.g.
  `docs/density_matrix_project/phases/phase-3-1/` uses the same document
  types as `phase-3/`, with phase-specific filenames using the underscore form
  of the slug (e.g. `DETAILED_PLANNING_PHASE_3_1.md`, `ADRs_PHASE_3_1.md`,
  `SHORT_PAPER_PHASE_3_1.md`, `ABSTRACT_PHASE_3_1.md`, `PAPER_PHASE_3_1.md`).
  The narrative companion stays **`SHORT_PAPER_NARRATIVE.md`** in that directory
  (unprefixed; same convention as `phase-3/`).

## Four-Layer Hierarchy

### Layer 1: Phase Contract (whole-phase level)

Define before implementation. Documents:

- **What Phase X is** and what it is not
- **Prerequisites** before implementation can start
- **Success criteria** for the phase

Primary deliverables:

| Document | Purpose |
|----------|---------|
| `DETAILED_PLANNING_PHASE_X.md` | Scope, tasks (as goals), acceptance criteria, traceability |
| `ADRs_PHASE_X.md` | Architecture and scope decisions for the phase |
| `PRE_IMPLEMENTATION_COMPLETION_CHECKLIST.md` | Gap list validating that the plan is detailed enough to implement |

Replace `PHASE_X` with the phase id matching the directory (e.g. `PHASE_2`,
`PHASE_3_1`).

**Practical rule:** If a decision affects multiple tasks, close it at the phase level (ADRs). If it affects only one task, defer to that task's mini-spec.

### Layer 2: Task-Level Mini-Spec (before each task)

Before starting each task, define in a mini-spec:

- Required behavior
- Unsupported behavior
- Acceptance evidence
- Affected interfaces
- Publication relevance (if any)

**Location:**
`docs/density_matrix_project/phases/phase-X/task-N/TASK_N_MINI_SPEC.md`

Example:
`docs/density_matrix_project/phases/phase-2/task-1/TASK_1_MINI_SPEC.md`

### Layer 3: Stories (behavioral slices)

Stories describe **behavioral slices**, not code chores. Examples:

- "Backend selection works for workflow X"
- "Observable path supports Hamiltonian form Y"
- "Unsupported gate families fail in a documented way"

### Layer 4: Engineering Tasks

Only here do you create:

- Code changes
- Test additions
- Benchmark runs
- Doc updates
- Validation runs

## Industry Best-Practice Refinements

Apply these practices when authoring or reviewing phase artifacts:

1. **Contract-first, decision-fast:** close cross-task decisions in ADRs early to
   avoid implementation drift.
2. **Behavior over mechanism:** write outcomes users/researchers can observe
   before implementation details.
3. **Testable acceptance language:** each required behavior should map to
   reproducible evidence and a pass/fail criterion.
4. **Traceability by default:** maintain requirement -> decision -> task ->
   evidence links.
5. **Explicit non-goals and unsupported behavior:** ambiguity is treated as
   scope risk.
6. **Publication-aware definitions of done:** claims in abstract/papers must be
   backed by planned validation evidence.
7. **Small vertical slices for delivery:** stories are the behavioral unit;
   engineering tasks are implementation units under each story.

## Behavioral Story Template (Layer 3)

Use this template for story-level behavioral slices (not code chores):

```markdown
### Story: [Behavioral outcome]

**User/Research value**
- Why this behavior matters to the phase objective

**Given / When / Then**
- Given [initial system contract state]
- When [workflow action]
- Then [observable outcome and boundary behavior]

**Scope**
- In: [what this story covers]
- Out: [explicit exclusions]

**Acceptance signals**
- [Signal 1: measurable behavioral evidence]
- [Signal 2: negative/unsupported behavior handling]

**Traceability**
- Phase requirement(s): [IDs or section references]
- ADR decision(s): [ADR IDs]
```

Quality gate for stories:
- independent enough to validate in isolation,
- negotiable in implementation details,
- valuable to workflow outcomes,
- estimable and small enough for one implementation cycle,
- testable via concrete acceptance signals.

## Engineering Task Template (Layer 4)

Use this template for implementation tasks created under a story:

```markdown
### Engineering Task: [Action-oriented title]

**Implements story**
- [Story title/reference]

**Change type**
- code | tests | benchmark harness | docs | validation automation

**Definition of done**
- [Concrete completion condition 1]
- [Concrete completion condition 2]

**Execution checklist**
- [ ] Implement targeted change
- [ ] Add/adjust tests
- [ ] Run validation/benchmarks needed by the story
- [ ] Update docs/reproducibility artifacts

**Evidence produced**
- [Test run reference]
- [Benchmark/validation artifact]

**Risks / rollback**
- Risk: [known risk]
- Rollback/mitigation: [how to revert or isolate impact]
```

Quality gate for engineering tasks:
- maps to exactly one primary story outcome,
- has objective done criteria,
- produces evidence artifacts,
- declares risk and mitigation.

## Phase Workflow (Three Steps)

The first step for any phase is creating the initial phase documents. Then validate, then close the checklist. Use the prompts below (substitute `phase-X` and `Phase X` for the target directory, e.g. `phase-2` / Phase 2, or `phase-3-1` / Phase 3.1).

### Short Paper Surfaces (Two-Paper Model)

Each phase produces two short paper surfaces with distinct roles:

| Document | Purpose | Audience |
|----------|---------|----------|
| `SHORT_PAPER_PHASE_X.md` | Technical methods paper — structured sections, detailed validation plan, numerical thresholds, scope boundaries, claim boundary | Venue-ready technical audience |
| `SHORT_PAPER_NARRATIVE.md` | Narrative positioning companion — scientific motivation, research arc, "why this phase matters", scientific positioning | General PhD-conference audience |

The two surfaces are **not** different lengths of the same content. They serve
genuinely different purposes:

- **PHASE_X** answers "what is the contribution and how is it validated?"
- **NARRATIVE** answers "why does this phase matter in the research arc?"

Do **not** create a third `SHORT_PAPER_4PAGE.md`. The two surfaces above replace
the earlier three-paper pattern (consolidated from phases 2-3 onward).

### Publication Sync After Implementation

Before revising `ABSTRACT_PHASE_X.md`, `SHORT_PAPER_PHASE_X.md`,
`SHORT_PAPER_NARRATIVE.md`, or `PAPER_PHASE_X.md` after implementation work has
started:

1. Verify the current state from code, tests, and emitted artifacts, not only
   from planning documents.
2. Classify publication statements as:
   - implemented and validated,
   - implemented but only partially validated,
   - scaffolded/planned only.
3. Keep the technical short paper and full paper aligned to the current evidence
   boundary.
4. Keep `SHORT_PAPER_NARRATIVE.md` science-first unless the user explicitly asks
   for a software/systems-paper framing:
   - avoid repo file-path inventory,
   - avoid internal task IDs and roadmap phrasing,
   - avoid API-level detail that does not matter to the scientific audience.

### Step 1: Create Initial Phase Documents

Work out a detailed plan per `docs/density_matrix_project/planning/PLANNING.md` and all docs in `docs/density_matrix_project/planning/`, plus findings. Write into `DETAILED_PLANNING_PHASE_X.md`. Do not change code. Apply spec-driven development principles. Prepare publication outputs per `docs/density_matrix_project/planning/PUBLICATIONS.md` in 4 steps: (1) technical short paper in `SHORT_PAPER_PHASE_X.md`, (2) narrative positioning short paper in `SHORT_PAPER_NARRATIVE.md`, (3) abstract in `ABSTRACT_PHASE_X.md` for PhD conference presentation, (4) full paper in `PAPER_PHASE_X.md`. Put all phase documents in `docs/density_matrix_project/phases/phase-X/`. Break down implementation into tasks and acceptance criteria. Tasks are goals, not implementations. No code snippets in phase docs except API-reference ones after implementation. Document all phase decisions in `ADRs_PHASE_X.md`.

**Example invocation (phase 2):** "Work out a detailed plan for phase 2 according to @docs/density_matrix_project/planning/PLANNING.md and according to all the documentation in @docs/density_matrix_project/planning and according to all the findings. Write it into file DETAILED_PLANNING_PHASE_2.md. Do not change code. Apply spec driven development principles. Prepare outputs per @docs/density_matrix_project/planning/PUBLICATIONS.md in 4 steps: (1) technical short paper in SHORT_PAPER_PHASE_2.md, (2) narrative positioning short paper in SHORT_PAPER_NARRATIVE.md, (3) abstract in ABSTRACT_PHASE_2.md for PhD conference presentation, (4) full paper in PAPER_PHASE_2.md. Put all new phase-2 documents in @docs/density_matrix_project/phases/phase-2. Break down the phase 2 implementation into tasks and acceptance criteria. Tasks are goals, not implementations. No code snippets in phase files except for the API reference related ones after the implementation. Document all phase-2 decisions in detail in ADRs_PHASE_2.md."

### Step 2: Validate Completeness and Implementation Readiness

Validate whether `DETAILED_PLANNING_PHASE_X.md` is detailed and thorough enough to start implementation. Turn the validation into a concise gap list in `PRE_IMPLEMENTATION_COMPLETION_CHECKLIST.md`.

**Example invocation (phase 2):** "Validate if docs/density_matrix_project/phases/phase-2/DETAILED_PLANNING_PHASE_2.md is detailed and thorough enough to start implementation. Turn this validation into a concise gap list in docs/density_matrix_project/phases/phase-2/PRE_IMPLEMENTATION_COMPLETION_CHECKLIST.md."

### Step 3: Close Pre-Implementation Checklist Items

Close each open checklist item so the phase contract is solid. Ask questions or decide; record the decision and trade-offs. Map each open item to a concrete contract decision or clarification. Define the relevant phase decisions (e.g. backend-selection, observable, bridge, support-matrix, workflow-anchor, benchmark-minimum, acceptance-threshold) with trade-offs. Update planning, ADRs, and checklist. Re-read updated docs for internal consistency and verify the checklist is solidly closed and implementation-ready.

**Example invocation (phase 2):** "Close the pre implementation checklist items for phase 2 to make the phase 2 contract solid enough. Ask question or decide but record the decision and the trade-offs. Review the Phase 2 pre-implementation checklist and map each open item to a concrete contract decision or required clarification. Define backend-selection, observable, bridge, support-matrix, workflow-anchor, benchmark-minimum, and acceptance-threshold decisions with trade-offs. Update the Phase 2 planning, ADR, and checklist docs to record decisions, trade-offs, and checklist closure. Re-read updated Phase 2 docs for internal consistency and verify the checklist is solidly closed and ready for implementation."

Note: Adjust decision areas per phase — Phase 2 needs all listed; later phases may differ.

### Sequence Summary

1. **Step 1** → Creates DETAILED_PLANNING, ADRs, abstract, two short papers (technical + narrative), full paper under `docs/density_matrix_project/phases/phase-X/`.
2. **Step 2** → Creates `PRE_IMPLEMENTATION_COMPLETION_CHECKLIST.md` with initial gap list.
3. **Step 3** → Closes each gap; updates planning, ADRs, checklist until implementation-ready.
4. **Implementation** → Create task mini-specs as needed; implement task by task.

### After Layer 1 Closure

Once `PRE_IMPLEMENTATION_COMPLETION_CHECKLIST.md` is fully closed and the phase
is implementation-ready:

- do **not** fully story-split the entire phase before coding,
- create Layer 3 stories and Layer 4 engineering tasks only for the **first
  vertical slice**,
- prefer one thin end-to-end slice that validates the new scientific object
  before broad horizontal infrastructure work,
- expand bundle/pipeline/schema migration only after that first slice produces
  real runtime and evidence feedback.

## Spec-Driven Principles

1. Define contracts, scope, and success criteria **before** implementation.
2. Separate **required behavior** from implementation choices.
3. Maintain traceability from milestone goals to validation evidence.
4. Treat **unsupported** and **deferred** cases as documented outcomes.
5. Use publication evidence requirements to guide "done."
6. Keep task descriptions **goal-oriented**, not implementation-prescriptive.

## Document Structure for Phase Planning

`DETAILED_PLANNING_PHASE_X.md` should include:

- Purpose and mission
- Source-of-truth hierarchy
- Traceability matrix (requirements → phase interpretation)
- In-scope / out-of-scope
- Assumptions
- Success conditions
- Frozen implementation contracts (backend, observable, bridge, support matrix, workflow anchor, benchmark minimum, numeric thresholds)
- Task breakdown (goals, why, success looks like, evidence required)
- Full-phase acceptance criteria
- Validation and benchmark matrix
- Risks and decision gates
- Non-goals
- Expected outcome

## Template Validation Rubric (ADRs, Planning, Mini-Spec)

Use this rubric to validate template quality before implementation starts.

### ADR template must include

- title and unique ADR ID,
- status,
- context,
- decision,
- rationale,
- consequences,
- rejected alternatives,
- upstream alignment and traceability.

### Detailed planning template must include

- purpose/mission and source-of-truth hierarchy,
- traceability matrix,
- in-scope/out-of-scope boundaries,
- assumptions and success conditions,
- frozen implementation contracts and numeric thresholds,
- task breakdown as goals plus evidence expectations,
- acceptance criteria, validation matrix, risks, and decision gates.

### Task mini-spec template must include

- required behavior,
- unsupported behavior,
- acceptance evidence,
- affected interfaces,
- publication relevance.

### Historical rubric snapshot (Phase 2, for calibration only)

Phase 2 artifacts were reviewed once against this rubric; **new phases should
be validated again** — this is not a standing “Pass” for future work.

- **ADRs template:** Pass (all core ADR sections present and consistent).
- **Detailed planning template:** Pass with strength (full contract structure,
  thresholds, tasks, risks, gates).
- **Task mini-spec template:** Pass (required sections present, behavior first).

Improvements noted during that review (still recommended):
- add explicit `Given/When/Then` behavioral wording where helpful,
- add a lightweight assumptions/dependencies subsection to mini-specs when
  external coupling is significant,
- keep evidence references stable (IDs or artifact names) for auditability.

## Pre-Implementation Checklist

`PRE_IMPLEMENTATION_COMPLETION_CHECKLIST.md`:

- Maps each open item to the contract that closes it
- States readiness verdict (implementation-ready or not)
- Records closure decisions and trade-offs
- Includes a **Go / No-Go rule** for when implementation can begin

## Do Not

- Write implementation code in phase docs except API references post-implementation
- Fully story-split the entire phase before starting
- Defer multi-task decisions to task mini-specs (close at phase level)
- Treat papers as a downstream retrofit — prepare them in parallel with planning

## Additional Resources

**Canonical workflow** (three steps, two-paper model, path rules) is this file.
[reference.md](reference.md) holds copy-paste prompts and historical Phase 2
closure examples; it must stay aligned with this SKILL — if in doubt, edit
SKILL first, then mirror prompts in reference.

## Example Phase 2 References

- `docs/density_matrix_project/phases/phase-2/DETAILED_PLANNING_PHASE_2.md`
- `docs/density_matrix_project/phases/phase-2/ADRs_PHASE_2.md`
- `docs/density_matrix_project/phases/phase-2/PRE_IMPLEMENTATION_COMPLETION_CHECKLIST.md`
- `docs/density_matrix_project/phases/phase-2/ABSTRACT_PHASE_2.md`
- `docs/density_matrix_project/phases/phase-2/SHORT_PAPER_PHASE_2.md`
- `docs/density_matrix_project/phases/phase-2/SHORT_PAPER_NARRATIVE.md`
- `docs/density_matrix_project/phases/phase-2/PAPER_PHASE_2.md`

Sub-phase example (same artifact set, `PHASE_3_1` filename stem):
`docs/density_matrix_project/phases/phase-3-1/DETAILED_PLANNING_PHASE_3_1.md`

---
> Source: [rakytap/sequential-quantum-gate-decomposer](https://github.com/rakytap/sequential-quantum-gate-decomposer) — distributed by [TomeVault](https://tomevault.io).