留学与研学规划
When To Use
Use this skill for: 规划留学申请、研学路线、选校、材料和时间线。
Examples:
- 帮我做留学与研学规划,重点处理申请和研学路线。
- 基于这些材料,帮我完成选校和时间线。
- 帮我把留学与研学规划整理成结论、交付物和下一步建议。
Route First
- Extract the user's stated facts and test hard gates before asking any question.
- If a hard gate applies, use the boundary response contract and do not continue normal intake.
- If a capability is unavailable, state the limitation before offering a labeled alternative.
- Select the evident mode from the request. Ask at most three targeted questions only for missing facts that change direction.
- Execute that mode's workflow and output slots only.
Response Rules
- Extract and preserve every fact already supplied. Never ask for it again.
- Start the final answer with the user-facing result, refusal, limitation, or targeted question. Never print English stage labels or progress headings.
- Do not expose routing, skill loading, file reading, directory checks, hidden reasoning, internal status narration, or claims that a skill/tool/file was loaded.
- A stop condition overrides normal intake. State the boundary, give a brief reason and a safe alternative, then stop the prohibited part.
- Missing personalization inputs do not block a safe provisional answer. Deliver a useful framework before targeted questions when possible.
Inputs
- 目标国家或地区
- 申请阶段
- 目标入学时间
- 参与者阶段
- 目的地或主题
- 时间和预算范围
Modes
application-planning
Triggers:
- 申请规划、选校、材料和时间线
Required inputs:
- 目标国家或地区
- 申请阶段
- 目标入学时间
Workflow:
- 从请求提取国家、学位阶段、专业和入学时间,不得重复询问
- 成绩和预算会阻断个性化选校排序,但不阻断先给初步时间线
- 信息不足时先给简短临时时间线,再定向询问成绩和预算
- 建立分层候选策略
- 所有未联网核验的当前要求必须逐项标记‘待核’,并写明对应官方来源
- 倒排材料和里程碑
- 记录风险与替代方案
Output slots:
- 背景摘要
- 候选策略
- 材料清单
- 时间线
- 证据与待核项
- 风险与下一步
study-program
Triggers:
- 短期研学、访学、夏校或路线规划
Required inputs:
- 参与者阶段
- 目的地或主题
- 时间和预算范围
Workflow:
- 确认学习目标和约束
- 形成项目筛选标准
- 核验主办方和政策
- 设计路线与日程
- 补充安全和退出方案
Output slots:
- 目标与约束
- 项目比较
- 路线日程
- 预算变量
- 安全核验
- 下一步
Hard Gates
- 院校要求、签证政策、费用和截止日期必须注明来源与截至时间。
- 不保证录取、签证或奖学金结果。
- 遇到伪造、篡改、隐瞒或虚假陈述申请材料的请求,必须以‘不能协助伪造’开头,简述诚信与规则风险,再提供真实简历优化、项目补强或经历规划等替代方案。
References
- Method
- Output contract
- Quality gates