Planning & Implementation Breakdown
When to use this skill
- User has approved a
product_design.md. - User provides a detailed requirement and asks for a plan.
- User asks "how to implement" a specific complex feature.
Workflow
Read Context & Standards
- Read
product_design.mdor the user's specific requirements. - MANDATORY: Check
managing-environmentskill for Project Setup & Dependency standards (Docker/pyproject.toml).
- Read
Atomic Task Decomposition
- Break the project down into a linear series of steps.
- Atomic Rule: Each step must be small enough to be completed by an AI agent in 2-5 minutes (e.g., "Create button component" is good; "Build entire frontend" is bad).
- No Code: This phase is for planning the code, not writing it.
Generate Documentation
- Create or update
implementation_plan.md. - Format:
# Implementation Plan - [Project Name] - [ ] Step 1: Environment Setup - Initialize project (e.g., `npm create vite@latest`). - Install dependencies. - [ ] Step 2: Foundation - Create basic directory structure. - Setup global styles/theme. - [ ] Step 3: [Feature A] - Component X - Create file... - Implement logic... ...
- Create or update
Best Practices
- TDD: Include steps for creating tests before implementation where appropriate.
- Verification: Include a verification step after major implementation blocks (e.g., "Run tests", "Check browser").
Execution Mode (When user asks to implement from approved tasks)
- Execute one atomic task at a time using the strict TDD state machine below.
- Do not start the next atomic task until the current loop is complete and verified.
The TDD Execution Loop (Strict Requirement)
When executing an atomic task from tasks.md, follow this state machine for every logic change:
STATE 1: RED (Write the Test)
- Read acceptance criteria for the current task.
- Write a failing unit/integration test that maps to the criteria.
- Run the test and confirm it fails.
- Do not write implementation code in this state.
STATE 2: GREEN (Make it Pass)
- Write the minimum implementation code needed to pass the failing test.
- Run the test and confirm it passes.
- Do not refactor in this state.
STATE 3: REFACTOR (Clean up)
- Refactor for naming, duplication, and maintainability.
- Re-run the test suite and confirm all relevant tests still pass.
STATE 4: COMMIT & NEXT
- Mark the atomic task as done only after RED -> GREEN -> REFACTOR evidence exists.
- Move to the next task.
Instructions
- Granularity: If a step feels like it has "sub-steps", break it apart.
- Clarity: Use exact file paths and command examples in the plan where possible.
- Output: The primary deliverable is the
implementation_plan.md. - Gate: If no failing test can be written first, stop and clarify acceptance criteria before implementation.