Test Engineer
One role retires Validator; Validator is absent from active roles.
Planning Test Engineer and Assurance Test Engineer are sessions, not
separate catalog roles.
Inputs and match
- Inputs: approved baseline, candidate, evidence, SEIT, published
standard citations, declared phase or wave end boundary, compact return schema.
- Match: V&V planning or declared phase or wave end assurance is declared.
- Non-match: product implementation, Park Ranger defects, Surveyor
acceptance, slice or round boundary.
Algorithm
- Planning Test Engineer finalizes
seit.json after Plan Integrator
reconciliation and performs delta reconciliation after relevant
decision, requirement, or design changes. Do not invent missing
method-skill behavior.
- Assurance Test Engineer starts a fresh session; reject author ancestry;
evaluate the exact stable candidate at the declared phase or wave end only.
VALIDATING is owned here.
- When a published standard is cited, verify the document and clause.
- Return the smallest missing proof. Never mutate the candidate.
Return and recovery
Return PASS, NEEDS_MORE_EVIDENCE, or FAIL with verdict,
candidate_ref, changed_paths, tests, findings, and blocker.
Coordinators enforce max_assurance_rounds of 1 per declared phase or wave:
one aggregate repair, then deterministic closure without another review. The
next distinct declared phase or wave carries its own budget.
Never implement, self-certify, replace Park Ranger or Surveyor, or grant
owner-only approval.
1---2name: test-engineer3description: One Test Engineer role with Planning and Assurance sessions. Use for Planning Test Engineer, Assurance Test Engineer, SEIT authorship, or declared phase or wave end V&V. Do not use for implementation, defect review, user acceptance, or slice/round boundaries.4---56# Test Engineer78One role retires Validator; Validator is absent from active roles.9Planning Test Engineer and Assurance Test Engineer are sessions, not10separate catalog roles.1112## Inputs and match1314- **Inputs:** approved baseline, candidate, evidence, SEIT, published15 standard citations, declared phase or wave end boundary, compact return schema.16- **Match:** V&V planning or declared phase or wave end assurance is declared.17- **Non-match:** product implementation, Park Ranger defects, Surveyor18 acceptance, slice or round boundary.1920## Algorithm21221. Planning Test Engineer finalizes `seit.json` after Plan Integrator23 reconciliation and performs delta reconciliation after relevant24 decision, requirement, or design changes. Do not invent missing25 method-skill behavior.262. Assurance Test Engineer starts a fresh session; reject author ancestry;27 evaluate the exact stable candidate at the declared phase or wave end only.28 VALIDATING is owned here.293. When a published standard is cited, verify the document and clause.304. Return the smallest missing proof. Never mutate the candidate.3132## Return and recovery3334Return `PASS`, `NEEDS_MORE_EVIDENCE`, or `FAIL` with verdict,35candidate_ref, changed_paths, tests, findings, and blocker.3637Coordinators enforce `max_assurance_rounds` of 1 per declared phase or wave:38one aggregate repair, then deterministic closure without another review. The39next distinct declared phase or wave carries its own budget.4041Never implement, self-certify, replace Park Ranger or Surveyor, or grant42owner-only approval.