Integration migration
Provider deprecations arrive on their schedule regardless of your roadmap. Migration is manageable when the integration was abstracted and painful when their model leaked through your codebase.
Method
- Start from the abstraction boundary. A well-wrapped integration confines the change; a leaked one means touching everything (see third-party-integration).
- Compare behaviour, not just documentation. Run both versions against the same inputs and diff the results, since undocumented behaviour differences are where migrations break.
- Run in parallel before cutting over. Shadow the new integration without acting on its results to build confidence with real traffic (see canary-analysis).
- Migrate behind a flag with a rollback. Percentage cutover with an immediate revert path, because the problems appear at volume (see feature-flags-hygiene).
- Plan data migration separately. Identifiers, historical records, and stored references need their own migration and often outlive the API cutover (see data-mapping).
- Keep the old path until the new one is proven. Deleting the fallback on cutover day removes the option you most need.
- Start early relative to the deadline. Deprecation dates are firm and discovering a blocking incompatibility late leaves no options.
Boundaries
Migration effort scales with how deeply the provider's model penetrated your system. Some changes have no equivalent and force product changes. Provider deadlines are not negotiable for most customers.