Wrike Automation via Rube MCP
Automate Wrike project management operations through Composio's Wrike toolkit via Rube MCP.
Prerequisites
- Rube MCP must be connected (RUBE_SEARCH_TOOLS available)
- Active Wrike connection via
RUBE_MANAGE_CONNECTIONS with toolkit wrike
- Always call
RUBE_SEARCH_TOOLS first to get current tool schemas
Setup
Get Rube MCP: Add https://rube.app/mcp as an MCP server in your client configuration. No API keys needed — just add the endpoint and it works.
- Verify Rube MCP is available by confirming
RUBE_SEARCH_TOOLS responds
- Call
RUBE_MANAGE_CONNECTIONS with toolkit wrike
- If connection is not ACTIVE, follow the returned auth link to complete Wrike OAuth
- Confirm connection status shows ACTIVE before running any workflows
Core Workflows
1. Create and Manage Tasks
When to use: User wants to create, assign, or update tasks in Wrike
Tool sequence:
WRIKE_GET_FOLDERS - Find the target folder/project [Prerequisite]
WRIKE_GET_ALL_CUSTOM_FIELDS - Get custom field IDs if needed [Optional]
WRIKE_CREATE_TASK - Create a new task [Required]
WRIKE_MODIFY_TASK - Update task properties [Optional]
Key parameters:
folderId: Parent folder ID where the task will be created
title: Task title
description: Task description (supports HTML)
responsibles: Array of user IDs to assign
status: 'Active', 'Completed', 'Deferred', 'Cancelled'
importance: 'High', 'Normal', 'Low'
customFields: Array of {id, value} objects
dates: Object with type, start, due, duration
Pitfalls:
- folderId is required; tasks must belong to a folder
- responsibles requires Wrike user IDs, not emails or names
- Custom field IDs must be obtained from GET_ALL_CUSTOM_FIELDS
- priorityBefore and priorityAfter are mutually exclusive
- Status field may not be available on Team plan
- dates.start and dates.due use 'YYYY-MM-DD' format
2. Manage Folders and Projects
When to use: User wants to create, modify, or organize folders and projects
Tool sequence:
WRIKE_GET_FOLDERS - List existing folders [Required]
WRIKE_CREATE_FOLDER - Create a new folder/project [Optional]
WRIKE_MODIFY_FOLDER - Update folder properties [Optional]
WRIKE_LIST_SUBFOLDERS_BY_FOLDER_ID - List subfolders [Optional]
WRIKE_DELETE_FOLDER - Delete a folder permanently [Optional]
Key parameters:
folderId: Parent folder ID for creation; target folder ID for modification
title: Folder name
description: Folder description
customItemTypeId: Set to create as a project instead of a folder
shareds: Array of user IDs or emails to share with
project: Filter for projects (true) or folders (false) in GET_FOLDERS
Pitfalls:
- DELETE_FOLDER is permanent and removes ALL contents (tasks, subfolders, documents)
- Cannot modify rootFolderId or recycleBinId as parents
- Folder creation auto-shares with the creator
- customItemTypeId converts a folder into a project
- GET_FOLDERS with descendants=true returns folder tree (may be large)
3. Retrieve and Track Tasks
When to use: User wants to find tasks, check status, or monitor progress
Tool sequence:
WRIKE_FETCH_ALL_TASKS - List tasks with optional filters [Required]
WRIKE_GET_TASK_BY_ID - Get detailed info for a specific task [Optional]
Key parameters:
status: Filter by task status ('Active', 'Completed', etc.)
dueDate: Filter by due date range (start/end/equal)
fields: Additional response fields to include
page_size: Results per page (1-100)
taskId: Specific task ID for detailed retrieval
resolve_user_names: Auto-resolve user IDs to names (default true)
Pitfalls:
- FETCH_ALL_TASKS paginates at max 100 items per page
- dueDate filter supports 'equal', 'start', and 'end' fields
- Date format: 'yyyy-MM-dd' or 'yyyy-MM-ddTHH:mm:ss'
- GET_TASK_BY_ID returns read-only detailed information
- customFields are returned by default for single task queries
4. Launch Task Blueprints
When to use: User wants to create tasks from predefined templates
Tool sequence:
WRIKE_LIST_TASK_BLUEPRINTS - List available blueprints [Prerequisite]
WRIKE_LIST_SPACE_TASK_BLUEPRINTS - List blueprints in a specific space [Alternative]
WRIKE_LAUNCH_TASK_BLUEPRINT_ASYNC - Launch a blueprint [Required]
Key parameters:
task_blueprint_id: ID of the blueprint to launch
title: Title for the root task
parent_id: Parent folder/project ID (OR super_task_id)
super_task_id: Parent task ID (OR parent_id)
reschedule_date: Target date for task rescheduling
reschedule_mode: 'RescheduleStartDate' or 'RescheduleFinishDate'
entry_limit: Max tasks to copy (1-250)
Pitfalls:
- Either parent_id or super_task_id is required, not both
- Blueprint launch is asynchronous; tasks may take time to appear
- reschedule_date requires reschedule_mode to be set
- entry_limit caps at 250 tasks/folders per blueprint launch
- copy_descriptions defaults to false; set true to include task descriptions
5. Manage Workspace and Members
When to use: User wants to manage spaces, members, or invitations
Tool sequence:
WRIKE_GET_SPACE - Get space details [Optional]
WRIKE_GET_CONTACTS - List workspace contacts/members [Optional]
WRIKE_CREATE_INVITATION - Invite a user to the workspace [Optional]
WRIKE_DELETE_SPACE - Delete a space permanently [Optional]
Key parameters:
spaceId: Space identifier
email: Email for invitation
role: User role ('Admin', 'Regular User', 'External User')
firstName/lastName: Invitee name
Pitfalls:
- DELETE_SPACE is irreversible and removes all space contents
- userTypeId and role/external are mutually exclusive in invitations
- Custom email subjects/messages require a paid Wrike plan
- GET_CONTACTS returns workspace-level contacts, not task-specific assignments
Common Patterns
Folder ID Resolution
1. Call WRIKE_GET_FOLDERS (optionally with project=true for projects only)
2. Navigate folder tree to find target
3. Extract folder id (e.g., 'IEAGKVLFK4IHGQOI')
4. Use as folderId in task/folder creation
Custom Field Setup
1. Call WRIKE_GET_ALL_CUSTOM_FIELDS to get definitions
2. Find field by name, extract id and type
3. Format value according to type (text, dropdown, number, date)
4. Include as {id: 'FIELD_ID', value: 'VALUE'} in customFields array
Task Assignment
1. Call WRIKE_GET_CONTACTS to find user IDs
2. Use user IDs in responsibles array when creating tasks
3. Or use addResponsibles/removeResponsibles when modifying tasks
Pagination
- FETCH_ALL_TASKS: Use page_size (max 100) and check for more results
- GET_FOLDERS: Use nextPageToken when descendants=false and pageSize is set
- LIST_TASK_BLUEPRINTS: Use next_page_token and page_size (default 100)
Known Pitfalls
ID Formats:
- Wrike IDs are opaque alphanumeric strings (e.g., 'IEAGTXR7I4IHGABC')
- Task IDs, folder IDs, space IDs, and user IDs all use this format
- Custom field IDs follow the same pattern
- Never guess IDs; always resolve from list/search operations
Permissions:
- Operations depend on user role and sharing settings
- Shared folders/tasks are visible only to shared users
- Admin operations require appropriate role
- Some features (custom statuses, billing types) are plan-dependent
Deletion Safety:
- DELETE_FOLDER removes ALL contents permanently
- DELETE_SPACE removes the entire space and contents
- Consider using MODIFY_FOLDER to move to recycle bin instead
- Restore from recycle bin is possible via MODIFY_FOLDER with restore=true
Date Handling:
- Dates use 'yyyy-MM-dd' format
- DateTime uses 'yyyy-MM-ddTHH:mm:ssZ' or with timezone offset
- Task dates include type ('Planned', 'Actual'), start, due, duration
- Duration is in minutes
Quick Reference
| Task |
Tool Slug |
Key Params |
| Create task |
WRIKE_CREATE_TASK |
folderId, title, responsibles, status |
| Modify task |
WRIKE_MODIFY_TASK |
taskId, title, status, addResponsibles |
| Get task by ID |
WRIKE_GET_TASK_BY_ID |
taskId |
| Fetch all tasks |
WRIKE_FETCH_ALL_TASKS |
status, dueDate, page_size |
| Get folders |
WRIKE_GET_FOLDERS |
project, descendants |
| Create folder |
WRIKE_CREATE_FOLDER |
folderId, title |
| Modify folder |
WRIKE_MODIFY_FOLDER |
folderId, title, addShareds |
| Delete folder |
WRIKE_DELETE_FOLDER |
folderId |
| List subfolders |
WRIKE_LIST_SUBFOLDERS_BY_FOLDER_ID |
folderId |
| Get custom fields |
WRIKE_GET_ALL_CUSTOM_FIELDS |
(none) |
| List blueprints |
WRIKE_LIST_TASK_BLUEPRINTS |
limit, page_size |
| Launch blueprint |
WRIKE_LAUNCH_TASK_BLUEPRINT_ASYNC |
task_blueprint_id, title, parent_id |
| Get space |
WRIKE_GET_SPACE |
spaceId |
| Delete space |
WRIKE_DELETE_SPACE |
spaceId |
| Get contacts |
WRIKE_GET_CONTACTS |
(none) |
| Invite user |
WRIKE_CREATE_INVITATION |
email, role |
When to Use
This skill is applicable to execute the workflow or actions described in the overview.
Limitations
- Use this skill only when the task clearly matches the scope described above.
- Do not treat the output as a substitute for environment-specific validation, testing, or expert review.
- Stop and ask for clarification if required inputs, permissions, safety boundaries, or success criteria are missing.
1---2name: wrike-automation3description: Automate Wrike project management via Rube MCP (Composio): create tasks/folders, manage projects, assign work, and track progress. Always search tools first for current schemas.4---5
6# Wrike Automation via Rube MCP
7
8Automate Wrike project management operations through Composio's Wrike toolkit via Rube MCP.
9
10## Prerequisites
11
12- Rube MCP must be connected (RUBE_SEARCH_TOOLS available)
13- Active Wrike connection via `RUBE_MANAGE_CONNECTIONS` with toolkit `wrike`
14- Always call `RUBE_SEARCH_TOOLS` first to get current tool schemas
15
16## Setup
17
18**Get Rube MCP**: Add `https://rube.app/mcp` as an MCP server in your client configuration. No API keys needed — just add the endpoint and it works.
19
20
211. Verify Rube MCP is available by confirming `RUBE_SEARCH_TOOLS` responds
222. Call `RUBE_MANAGE_CONNECTIONS` with toolkit `wrike`
233. If connection is not ACTIVE, follow the returned auth link to complete Wrike OAuth
244. Confirm connection status shows ACTIVE before running any workflows
25
26## Core Workflows
27
28### 1. Create and Manage Tasks
29
30**When to use**: User wants to create, assign, or update tasks in Wrike
31
32**Tool sequence**:
331. `WRIKE_GET_FOLDERS` - Find the target folder/project [Prerequisite]
342. `WRIKE_GET_ALL_CUSTOM_FIELDS` - Get custom field IDs if needed [Optional]
353. `WRIKE_CREATE_TASK` - Create a new task [Required]
364. `WRIKE_MODIFY_TASK` - Update task properties [Optional]
37
38**Key parameters**:
39- `folderId`: Parent folder ID where the task will be created
40- `title`: Task title
41- `description`: Task description (supports HTML)
42- `responsibles`: Array of user IDs to assign
43- `status`: 'Active', 'Completed', 'Deferred', 'Cancelled'
44- `importance`: 'High', 'Normal', 'Low'
45- `customFields`: Array of {id, value} objects
46- `dates`: Object with type, start, due, duration
47
48**Pitfalls**:
49- folderId is required; tasks must belong to a folder
50- responsibles requires Wrike user IDs, not emails or names
51- Custom field IDs must be obtained from GET_ALL_CUSTOM_FIELDS
52- priorityBefore and priorityAfter are mutually exclusive
53- Status field may not be available on Team plan
54- dates.start and dates.due use 'YYYY-MM-DD' format
55
56### 2. Manage Folders and Projects
57
58**When to use**: User wants to create, modify, or organize folders and projects
59
60**Tool sequence**:
611. `WRIKE_GET_FOLDERS` - List existing folders [Required]
622. `WRIKE_CREATE_FOLDER` - Create a new folder/project [Optional]
633. `WRIKE_MODIFY_FOLDER` - Update folder properties [Optional]
644. `WRIKE_LIST_SUBFOLDERS_BY_FOLDER_ID` - List subfolders [Optional]
655. `WRIKE_DELETE_FOLDER` - Delete a folder permanently [Optional]
66
67**Key parameters**:
68- `folderId`: Parent folder ID for creation; target folder ID for modification
69- `title`: Folder name
70- `description`: Folder description
71- `customItemTypeId`: Set to create as a project instead of a folder
72- `shareds`: Array of user IDs or emails to share with
73- `project`: Filter for projects (true) or folders (false) in GET_FOLDERS
74
75**Pitfalls**:
76- DELETE_FOLDER is permanent and removes ALL contents (tasks, subfolders, documents)
77- Cannot modify rootFolderId or recycleBinId as parents
78- Folder creation auto-shares with the creator
79- customItemTypeId converts a folder into a project
80- GET_FOLDERS with descendants=true returns folder tree (may be large)
81
82### 3. Retrieve and Track Tasks
83
84**When to use**: User wants to find tasks, check status, or monitor progress
85
86**Tool sequence**:
871. `WRIKE_FETCH_ALL_TASKS` - List tasks with optional filters [Required]
882. `WRIKE_GET_TASK_BY_ID` - Get detailed info for a specific task [Optional]
89
90**Key parameters**:
91- `status`: Filter by task status ('Active', 'Completed', etc.)
92- `dueDate`: Filter by due date range (start/end/equal)
93- `fields`: Additional response fields to include
94- `page_size`: Results per page (1-100)
95- `taskId`: Specific task ID for detailed retrieval
96- `resolve_user_names`: Auto-resolve user IDs to names (default true)
97
98**Pitfalls**:
99- FETCH_ALL_TASKS paginates at max 100 items per page
100- dueDate filter supports 'equal', 'start', and 'end' fields
101- Date format: 'yyyy-MM-dd' or 'yyyy-MM-ddTHH:mm:ss'
102- GET_TASK_BY_ID returns read-only detailed information
103- customFields are returned by default for single task queries
104
105### 4. Launch Task Blueprints
106
107**When to use**: User wants to create tasks from predefined templates
108
109**Tool sequence**:
1101. `WRIKE_LIST_TASK_BLUEPRINTS` - List available blueprints [Prerequisite]
1112. `WRIKE_LIST_SPACE_TASK_BLUEPRINTS` - List blueprints in a specific space [Alternative]
1123. `WRIKE_LAUNCH_TASK_BLUEPRINT_ASYNC` - Launch a blueprint [Required]
113
114**Key parameters**:
115- `task_blueprint_id`: ID of the blueprint to launch
116- `title`: Title for the root task
117- `parent_id`: Parent folder/project ID (OR super_task_id)
118- `super_task_id`: Parent task ID (OR parent_id)
119- `reschedule_date`: Target date for task rescheduling
120- `reschedule_mode`: 'RescheduleStartDate' or 'RescheduleFinishDate'
121- `entry_limit`: Max tasks to copy (1-250)
122
123**Pitfalls**:
124- Either parent_id or super_task_id is required, not both
125- Blueprint launch is asynchronous; tasks may take time to appear
126- reschedule_date requires reschedule_mode to be set
127- entry_limit caps at 250 tasks/folders per blueprint launch
128- copy_descriptions defaults to false; set true to include task descriptions
129
130### 5. Manage Workspace and Members
131
132**When to use**: User wants to manage spaces, members, or invitations
133
134**Tool sequence**:
1351. `WRIKE_GET_SPACE` - Get space details [Optional]
1362. `WRIKE_GET_CONTACTS` - List workspace contacts/members [Optional]
1373. `WRIKE_CREATE_INVITATION` - Invite a user to the workspace [Optional]
1384. `WRIKE_DELETE_SPACE` - Delete a space permanently [Optional]
139
140**Key parameters**:
141- `spaceId`: Space identifier
142- `email`: Email for invitation
143- `role`: User role ('Admin', 'Regular User', 'External User')
144- `firstName`/`lastName`: Invitee name
145
146**Pitfalls**:
147- DELETE_SPACE is irreversible and removes all space contents
148- userTypeId and role/external are mutually exclusive in invitations
149- Custom email subjects/messages require a paid Wrike plan
150- GET_CONTACTS returns workspace-level contacts, not task-specific assignments
151
152## Common Patterns
153
154### Folder ID Resolution
155
156```
1571. Call WRIKE_GET_FOLDERS (optionally with project=true for projects only)
1582. Navigate folder tree to find target
1593. Extract folder id (e.g., 'IEAGKVLFK4IHGQOI')
1604. Use as folderId in task/folder creation
161```
162
163### Custom Field Setup
164
165```
1661. Call WRIKE_GET_ALL_CUSTOM_FIELDS to get definitions
1672. Find field by name, extract id and type
1683. Format value according to type (text, dropdown, number, date)
1694. Include as {id: 'FIELD_ID', value: 'VALUE'} in customFields array
170```
171
172### Task Assignment
173
174```
1751. Call WRIKE_GET_CONTACTS to find user IDs
1762. Use user IDs in responsibles array when creating tasks
1773. Or use addResponsibles/removeResponsibles when modifying tasks
178```
179
180### Pagination
181
182- FETCH_ALL_TASKS: Use page_size (max 100) and check for more results
183- GET_FOLDERS: Use nextPageToken when descendants=false and pageSize is set
184- LIST_TASK_BLUEPRINTS: Use next_page_token and page_size (default 100)
185
186## Known Pitfalls
187
188**ID Formats**:
189- Wrike IDs are opaque alphanumeric strings (e.g., 'IEAGTXR7I4IHGABC')
190- Task IDs, folder IDs, space IDs, and user IDs all use this format
191- Custom field IDs follow the same pattern
192- Never guess IDs; always resolve from list/search operations
193
194**Permissions**:
195- Operations depend on user role and sharing settings
196- Shared folders/tasks are visible only to shared users
197- Admin operations require appropriate role
198- Some features (custom statuses, billing types) are plan-dependent
199
200**Deletion Safety**:
201- DELETE_FOLDER removes ALL contents permanently
202- DELETE_SPACE removes the entire space and contents
203- Consider using MODIFY_FOLDER to move to recycle bin instead
204- Restore from recycle bin is possible via MODIFY_FOLDER with restore=true
205
206**Date Handling**:
207- Dates use 'yyyy-MM-dd' format
208- DateTime uses 'yyyy-MM-ddTHH:mm:ssZ' or with timezone offset
209- Task dates include type ('Planned', 'Actual'), start, due, duration
210- Duration is in minutes
211
212## Quick Reference
213
214| Task | Tool Slug | Key Params |
215|------|-----------|------------|
216| Create task | WRIKE_CREATE_TASK | folderId, title, responsibles, status |
217| Modify task | WRIKE_MODIFY_TASK | taskId, title, status, addResponsibles |
218| Get task by ID | WRIKE_GET_TASK_BY_ID | taskId |
219| Fetch all tasks | WRIKE_FETCH_ALL_TASKS | status, dueDate, page_size |
220| Get folders | WRIKE_GET_FOLDERS | project, descendants |
221| Create folder | WRIKE_CREATE_FOLDER | folderId, title |
222| Modify folder | WRIKE_MODIFY_FOLDER | folderId, title, addShareds |
223| Delete folder | WRIKE_DELETE_FOLDER | folderId |
224| List subfolders | WRIKE_LIST_SUBFOLDERS_BY_FOLDER_ID | folderId |
225| Get custom fields | WRIKE_GET_ALL_CUSTOM_FIELDS | (none) |
226| List blueprints | WRIKE_LIST_TASK_BLUEPRINTS | limit, page_size |
227| Launch blueprint | WRIKE_LAUNCH_TASK_BLUEPRINT_ASYNC | task_blueprint_id, title, parent_id |
228| Get space | WRIKE_GET_SPACE | spaceId |
229| Delete space | WRIKE_DELETE_SPACE | spaceId |
230| Get contacts | WRIKE_GET_CONTACTS | (none) |
231| Invite user | WRIKE_CREATE_INVITATION | email, role |
232
233## When to Use
234This skill is applicable to execute the workflow or actions described in the overview.
235
236## Limitations
237- Use this skill only when the task clearly matches the scope described above.
238- Do not treat the output as a substitute for environment-specific validation, testing, or expert review.
239- Stop and ask for clarification if required inputs, permissions, safety boundaries, or success criteria are missing.