Decide whether one real AI workflow candidate is ready to test now, needs more validation, should be sequenced later, or should be avoided for now. Use the supplied job, owner, value, complexity, risk, dependencies, user and technical readiness, human boundary, support, and smallest-test evidence without inventing adoption, value, safety, or production claims.
Use this skill before building or piloting one concrete AI workflow. It turns
the workflow's evidence and missing prerequisites into one bounded readiness
route: Test now, Validate further, Sequence later, or Avoid for now.
The result is a review packet, not an approval, rollout, model evaluation, or
proof that the workflow will create value.
When to use
Use it when:
a PM or workflow owner has one plausible AI workflow and needs a pre-test
decision;
a team is moving from a problem statement or demo toward a representative
test and needs to check owner, inputs, access, controls, and support first;
an AI Activator needs to make the user job, dependencies, human boundary,
smallest test, and stop conditions visible;
a promising workflow is being compared with other work and the question is
whether this specific candidate is feasible and ready for attention now;
a reviewer needs a dated, evidence-bounded reason to test, gather evidence,
defer, or stop.
Use pm-opportunity-to-bet when the main decision is which opportunity to
choose from a set. Use pm-ai-evaluation-plan when readiness is sufficient and
the main job is to design a paired quality, safety, or outcome test. Use
pm-ai-workflow-to-scale after a test, validation, or pilot when the decision
is exposure or maturity. Use pm-ai-workflow-to-package after a workflow has
been tested and the job is to make it repeatable for another person or team.
Do not use
Do not use this skill to:
rank a portfolio, manufacture a market estimate, calculate an ungrounded
priority score, or declare a roadmap commitment;
call a workflow valuable, adopted, safe, reliable, production-ready, or
successful from a proposal, demo, benchmark, request, download, star, or
one favorable trace;
approve a budget, grant access, change a model or policy, deploy, send,
create a ticket, or start an external action automatically;
hide missing owner, source, permission, fallback, reviewer, capacity, or
outcome evidence inside a score;
expose customer data, credentials, private URLs, raw traces, proprietary
prompts, or provider secrets in a public packet.
Write Not provided, Not verified, Not run, Unknown, Need evidence,
Blocked, and Not covered when the input does not support a stronger claim.
Readiness boundary
Readiness means that the workflow has enough named context and control to
justify the next learning action. It does not mean the workflow is good.
Keep these layers separate:
Layer
It may establish
It cannot establish by itself
workflow_context
who has what job, trigger, workaround, and boundary
demand, value, or quality
feasibility
whether inputs, access, tools, dependencies, and support can be named
that the AI output is correct
user_readiness
whether eligible users, owner, and reviewer can participate
that users will adopt or benefit
technical_readiness
whether a bounded test environment and version can be described
reliability in production
human_control
where a person stops, checks, edits, approves, or escalates
that review prevents every error
testability
whether a smallest representative test and receipt can be defined
a test result or outcome
readiness_route
what to do next under the supplied evidence
execution, value, safety, adoption, or scale
Do not use a weighted score to turn a missing critical prerequisite into a
pass. A decisive unknown stays visible and can route the candidate to
Validate further, Sequence later, or Avoid for now.
Workflow
1. Frame one workflow candidate
Write one sentence:
For [eligible user] trying to complete [job] in [context], decide
whether [workflow] is ready for [smallest test] under [human, access, risk, support, and evidence boundary].
Capture:
Field
Question
workflow_id/version
What exact workflow, source, model, prompt, tool, policy, or UI is being considered?
user_job
What must the person or team complete, and what is the current workaround?
eligible_users
Who may participate, and who must be excluded?
owner
Who is accountable for the workflow, decision, review, and fallback?
trigger/frequency
When does the job occur, and how repeatable is it?
value_hypothesis
What progress might matter, and what evidence is still missing?
complexity/risk
What makes the workflow hard, consequential, sensitive, or easy to misuse?
decision_date
When was the evidence reviewed, and when should it be rechecked?
If the job, owner, or accountable reviewer is missing, do not route directly to
Test now.
2. Map the readiness signals
Review each dimension as Ready, Partial, Missing, Blocked, Not run,
or Not provided. Cite the supplied source, owner, date, or receipt for every
material assertion.
Dimension
Minimum question
User/job
Is the job concrete enough to observe, and is the workaround visible?
Owner
Is one person or team accountable for approval, review, support, and stop?
Value
Is there a stated progress hypothesis without pretending it is measured value?
Repeatability
Does the job recur often enough, or have a defined representative slice?
Complexity/risk
Are edge cases, sensitivity, consequence, and misuse risks named?
Inputs/sources
Are allowed inputs, source authority, freshness, and redaction rules known?
Access/dependencies
Are tools, permissions, approvals, integrations, and upstream dependencies available or explicitly blocked?
User readiness
Can eligible users participate, review, and give a meaningful receipt?
Technical readiness
Can the exact version, environment, test boundary, and failure path be held stable enough to learn?
Human boundary
Is it clear what AI may draft/recommend/do and what a person must check, approve, or reject?
Support/maintenance
Is support, incident handling, update authority, and fallback named?
Testability
Is the smallest representative test, oracle/receipt, duration, and stop rule defined?
3. Resolve blockers before routing
Treat these as critical until an owner supplies evidence:
no accountable owner or reviewer;
no legitimate input/source access or unresolved sensitive-data boundary;
no safe human boundary for a consequential decision or external action;
no manual fallback, escalation path, or stop condition;
no representative user/job slice or no observable receipt;
a dependency, approval, support, or environment requirement is blocked;
the requested exposure is broader than the test boundary.
For each gap, write the smallest receipt that could resolve it, the evidence
owner, the due/recheck date, and what happens if it remains missing. Do not
call an absent receipt Ready because the workflow sounds simple.
4. Define the smallest safe test
Only propose Test now when a human-owned, reversible test can be described.
State:
one user/job slice and who is excluded;
the current alternative and the candidate workflow version;
allowed inputs, source authority, access, permissions, and redaction;
test owner, reviewer, participants, duration, environment, and change limit;
what the AI may produce and what it must not do;
representative positive, negative, ambiguous, and abstain cases;
receipt/oracle: what a reviewer records for each eligible unit;
success signal, uncertainty signal, cost/latency status if supplied, and
stop/escalate conditions;
manual fallback, rollback/containment, and the next review date.
Not run is the correct status before the test actually happens. A proposed
test is not an evaluation result or an outcome claim.
5. Choose one route
Use the route supported by the weakest material prerequisite, not by overall
enthusiasm.
Route
Use when
Required next receipt
Test now
owner, job, access, human boundary, support/fallback, representative slice, and smallest test are sufficiently defined
test record with scope, reviewer, cases, stop rule, and dated receipt
Validate further
the workflow may be testable, but one or more recoverable readiness signals are missing or partial
named evidence owner, missing receipt, recheck trigger, and safe interim route
Sequence later
the job may matter, but timing, dependency, capacity, user readiness, or opportunity cost makes a near-term test a poor next move
reopen condition, dependency owner, and review date
Avoid for now
no accountable owner, no legitimate access, no safe human boundary, unacceptable risk, or no credible way to observe the job
explicit stop reason, fallback/alternative, and authority for reconsideration
Do not use Test now as a synonym for approval. The route only authorizes a
bounded learning action after the responsible owner confirms the boundary.
6. Write claims and limits
For every claim, record literal statement, status (Observed, Reported,
Proposed, Measured, Unknown), scope, source/method, date/version,
denominator if relevant, limitation, and next receipt. Keep these statements
separate:
Readiness route: proposed — a recommendation from supplied evidence;
Test: not run — no execution receipt exists;
Outcome: not measured — no accepted user/job outcome is established;
Adoption: not measured — repeated voluntary use is not established;
Production: not verified — runtime, operations, and release evidence are
outside this packet.
7. Handoff without execution
Give the accountable owner one smallest next action, the surfaces and source
checks involved, the evidence to collect, the fallback, and the follow-on
skill. The skill is tool-free: it does not call a model, browse a private
source, grant permission, run the test, or change an external system.
Output contract
Return these sections in order. Preserve missingness instead of smoothing it
over.
Decision on the desk
State decision owner, eligible user/job, current workaround, candidate
workflow/version, proposed test boundary, decision date, and the evidence that
could change the route.
Workflow candidate
Use a table for workflow_id/version, trigger/frequency, users, owner, inputs,
sources, dependencies, value hypothesis, complexity, risk, human boundary,
support, fallback, and evidence status.
Readiness map
List every readiness dimension with status, evidence/source, limitation, gap
owner, and next receipt. Keep Missing, Blocked, and Not run distinct.
Route
Return exactly one of Test now, Validate further, Sequence later, or
Avoid for now, followed by the decisive signals, unresolved blockers, and
why the other routes are not currently better supported.
Smallest safe test or recovery
For Test now, define scope, participants, version, allowed inputs, cases,
reviewer, receipt/oracle, duration, stop rule, fallback, and review date. For
other routes, define the smallest evidence, dependency, sequencing condition,
or safe alternative that changes the decision.
Claims ledger
Use a table with claim, status, scope/unit, source/method, date/version,
limitation, and next receipt. Do not make an unmeasured value, adoption,
quality, safety, or production claim.
Human control and support
State what AI may draft/recommend/do, what a person must check/approve/reject,
when to stop/ask/escalate, who supports the work, and the manual fallback.
Implementation handoff
Name the owner, smallest authorized next action, affected surfaces, source and
privacy review, acceptance/evidence receipt, writeback location, and follow-on
skill. Do not imply that the action was executed.
Not covered
List unsupported market size, demand, business value, ROI, adoption, traffic,
stars, quality, model performance, safety, privacy, security, accessibility,
localization, cost, latency, reliability, production readiness, rollout,
rollback execution, or causal impact.
Review ask
Ask the reviewer to choose exactly one: Test now, Validate further,
Sequence later, or Avoid for now. Name the one unresolved evidence or risk
that should be corrected before the route changes.
Edge cases
Missing owner: route to Validate further or Avoid for now; do not
infer accountability from the requester.
Missing access or approval: keep the workflow untested and name the
legitimate owner and permission receipt; never suggest bypassing controls.
High-impact or external action: require narrow exposure, explicit human
approval, visible fallback, stop/escalation behavior, and a reviewable
receipt before Test now.
No repeated workflow: a one-off job can still be tested only if the
representative case, oracle, reviewer, and learning purpose are explicit;
do not call it repeatable or valuable.
Conflicting signals: preserve the contexts and route to Validate further or Sequence later with a tie-break receipt.
Synthetic or fictional input: label the entire output fictional fixture; it can exercise the packet but cannot establish a real decision,
value, adoption, or growth claim.
Provider/model/tool change: route to a change-aware evaluation and
revalidation plan; readiness does not replace paired testing.
Unsafe or unobservable job: route to Avoid for now and state the human
or manual alternative. Do not convert uncertainty into a green light.
Question asks for stars, traffic, or growth: keep those claims outside
the workflow decision and mark them Not measured or Not covered.
Final check
Before handoff, confirm:
one workflow candidate, user/job, owner, and decision date are explicit;
current workaround, value hypothesis, complexity, and risk are separated;
inputs, sources, permissions, dependencies, support, and fallback are named;
user readiness, technical readiness, human boundary, and testability are separate;
missing and blocked evidence is not hidden in a score;
exactly one of the four readiness routes is selected;
Test now has a bounded representative test and stop rule, or another route has a recovery condition;
every material claim has status, scope, source/method, limitation, and next receipt;
no adoption, value, safety, quality, production, or growth claim outruns evidence;
human owner, support path, and manual fallback are visible;
unsupported surfaces are listed under Not covered.
1---2name: pm-ai-workflow-to-readiness3description: Decide whether one real AI workflow candidate is ready to test now, needs more validation, should be sequenced later, or should be avoided for now. Use the supplied job, owner, value, complexity, risk, dependencies, user and technical readiness, human boundary, support, and smallest-test evidence without inventing adoption, value, safety, or production claims.4---56# PM AI Workflow to Readiness78Use this skill before building or piloting one concrete AI workflow. It turns9the workflow's evidence and missing prerequisites into one bounded readiness10route: `Test now`, `Validate further`, `Sequence later`, or `Avoid for now`.11The result is a review packet, not an approval, rollout, model evaluation, or12proof that the workflow will create value.1314## When to use1516Use it when:1718- a PM or workflow owner has one plausible AI workflow and needs a pre-test19 decision;20- a team is moving from a problem statement or demo toward a representative21 test and needs to check owner, inputs, access, controls, and support first;22- an AI Activator needs to make the user job, dependencies, human boundary,23 smallest test, and stop conditions visible;24- a promising workflow is being compared with other work and the question is25 whether this specific candidate is feasible and ready for attention now;26- a reviewer needs a dated, evidence-bounded reason to test, gather evidence,27 defer, or stop.2829Use `pm-opportunity-to-bet` when the main decision is which opportunity to30choose from a set. Use `pm-ai-evaluation-plan` when readiness is sufficient and31the main job is to design a paired quality, safety, or outcome test. Use32`pm-ai-workflow-to-scale` after a test, validation, or pilot when the decision33is exposure or maturity. Use `pm-ai-workflow-to-package` after a workflow has34been tested and the job is to make it repeatable for another person or team.3536## Do not use3738Do not use this skill to:3940- rank a portfolio, manufacture a market estimate, calculate an ungrounded41 priority score, or declare a roadmap commitment;42- call a workflow valuable, adopted, safe, reliable, production-ready, or43 successful from a proposal, demo, benchmark, request, download, star, or44 one favorable trace;45- approve a budget, grant access, change a model or policy, deploy, send,46 create a ticket, or start an external action automatically;47- replace security, privacy, legal, safety, accessibility, reliability,48 finance, data-governance, or change-management review;49- hide missing owner, source, permission, fallback, reviewer, capacity, or50 outcome evidence inside a score;51- expose customer data, credentials, private URLs, raw traces, proprietary52 prompts, or provider secrets in a public packet.5354Write `Not provided`, `Not verified`, `Not run`, `Unknown`, `Need evidence`,55`Blocked`, and `Not covered` when the input does not support a stronger claim.5657## Readiness boundary5859Readiness means that the workflow has enough named context and control to60justify the next learning action. It does not mean the workflow is good.6162Keep these layers separate:6364| Layer | It may establish | It cannot establish by itself |65| --- | --- | --- |66| `workflow_context` | who has what job, trigger, workaround, and boundary | demand, value, or quality |67| `feasibility` | whether inputs, access, tools, dependencies, and support can be named | that the AI output is correct |68| `user_readiness` | whether eligible users, owner, and reviewer can participate | that users will adopt or benefit |69| `technical_readiness` | whether a bounded test environment and version can be described | reliability in production |70| `human_control` | where a person stops, checks, edits, approves, or escalates | that review prevents every error |71| `testability` | whether a smallest representative test and receipt can be defined | a test result or outcome |72| `readiness_route` | what to do next under the supplied evidence | execution, value, safety, adoption, or scale |7374Do not use a weighted score to turn a missing critical prerequisite into a75pass. A decisive unknown stays visible and can route the candidate to76`Validate further`, `Sequence later`, or `Avoid for now`.7778## Workflow7980### 1. Frame one workflow candidate8182Write one sentence:8384> For `[eligible user]` trying to complete `[job]` in `[context]`, decide85> whether `[workflow]` is ready for `[smallest test]` under `[human, access,86> risk, support, and evidence boundary]`.8788Capture:8990| Field | Question |91| --- | --- |92| `workflow_id/version` | What exact workflow, source, model, prompt, tool, policy, or UI is being considered? |93| `user_job` | What must the person or team complete, and what is the current workaround? |94| `eligible_users` | Who may participate, and who must be excluded? |95| `owner` | Who is accountable for the workflow, decision, review, and fallback? |96| `trigger/frequency` | When does the job occur, and how repeatable is it? |97| `value_hypothesis` | What progress might matter, and what evidence is still missing? |98| `complexity/risk` | What makes the workflow hard, consequential, sensitive, or easy to misuse? |99| `decision_date` | When was the evidence reviewed, and when should it be rechecked? |100101If the job, owner, or accountable reviewer is missing, do not route directly to102`Test now`.103104### 2. Map the readiness signals105106Review each dimension as `Ready`, `Partial`, `Missing`, `Blocked`, `Not run`,107or `Not provided`. Cite the supplied source, owner, date, or receipt for every108material assertion.109110| Dimension | Minimum question |111| --- | --- |112| User/job | Is the job concrete enough to observe, and is the workaround visible? |113| Owner | Is one person or team accountable for approval, review, support, and stop? |114| Value | Is there a stated progress hypothesis without pretending it is measured value? |115| Repeatability | Does the job recur often enough, or have a defined representative slice? |116| Complexity/risk | Are edge cases, sensitivity, consequence, and misuse risks named? |117| Inputs/sources | Are allowed inputs, source authority, freshness, and redaction rules known? |118| Access/dependencies | Are tools, permissions, approvals, integrations, and upstream dependencies available or explicitly blocked? |119| User readiness | Can eligible users participate, review, and give a meaningful receipt? |120| Technical readiness | Can the exact version, environment, test boundary, and failure path be held stable enough to learn? |121| Human boundary | Is it clear what AI may draft/recommend/do and what a person must check, approve, or reject? |122| Support/maintenance | Is support, incident handling, update authority, and fallback named? |123| Testability | Is the smallest representative test, oracle/receipt, duration, and stop rule defined? |124125### 3. Resolve blockers before routing126127Treat these as critical until an owner supplies evidence:128129- no accountable owner or reviewer;130- no legitimate input/source access or unresolved sensitive-data boundary;131- no safe human boundary for a consequential decision or external action;132- no manual fallback, escalation path, or stop condition;133- no representative user/job slice or no observable receipt;134- a dependency, approval, support, or environment requirement is blocked;135- the requested exposure is broader than the test boundary.136137For each gap, write the smallest receipt that could resolve it, the evidence138owner, the due/recheck date, and what happens if it remains missing. Do not139call an absent receipt `Ready` because the workflow sounds simple.140141### 4. Define the smallest safe test142143Only propose `Test now` when a human-owned, reversible test can be described.144State:145146- one user/job slice and who is excluded;147- the current alternative and the candidate workflow version;148- allowed inputs, source authority, access, permissions, and redaction;149- test owner, reviewer, participants, duration, environment, and change limit;150- what the AI may produce and what it must not do;151- representative positive, negative, ambiguous, and abstain cases;152- receipt/oracle: what a reviewer records for each eligible unit;153- success signal, uncertainty signal, cost/latency status if supplied, and154 stop/escalate conditions;155- manual fallback, rollback/containment, and the next review date.156157`Not run` is the correct status before the test actually happens. A proposed158test is not an evaluation result or an outcome claim.159160### 5. Choose one route161162Use the route supported by the weakest material prerequisite, not by overall163enthusiasm.164165| Route | Use when | Required next receipt |166| --- | --- | --- |167| `Test now` | owner, job, access, human boundary, support/fallback, representative slice, and smallest test are sufficiently defined | test record with scope, reviewer, cases, stop rule, and dated receipt |168| `Validate further` | the workflow may be testable, but one or more recoverable readiness signals are missing or partial | named evidence owner, missing receipt, recheck trigger, and safe interim route |169| `Sequence later` | the job may matter, but timing, dependency, capacity, user readiness, or opportunity cost makes a near-term test a poor next move | reopen condition, dependency owner, and review date |170| `Avoid for now` | no accountable owner, no legitimate access, no safe human boundary, unacceptable risk, or no credible way to observe the job | explicit stop reason, fallback/alternative, and authority for reconsideration |171172Do not use `Test now` as a synonym for approval. The route only authorizes a173bounded learning action after the responsible owner confirms the boundary.174175### 6. Write claims and limits176177For every claim, record literal statement, status (`Observed`, `Reported`,178`Proposed`, `Measured`, `Unknown`), scope, source/method, date/version,179denominator if relevant, limitation, and next receipt. Keep these statements180separate:181182- `Readiness route: proposed` — a recommendation from supplied evidence;183- `Test: not run` — no execution receipt exists;184- `Outcome: not measured` — no accepted user/job outcome is established;185- `Adoption: not measured` — repeated voluntary use is not established;186- `Production: not verified` — runtime, operations, and release evidence are187 outside this packet.188189### 7. Handoff without execution190191Give the accountable owner one smallest next action, the surfaces and source192checks involved, the evidence to collect, the fallback, and the follow-on193skill. The skill is tool-free: it does not call a model, browse a private194source, grant permission, run the test, or change an external system.195196## Output contract197198Return these sections in order. Preserve missingness instead of smoothing it199over.200201## Decision on the desk202203State decision owner, eligible user/job, current workaround, candidate204workflow/version, proposed test boundary, decision date, and the evidence that205could change the route.206207## Workflow candidate208209Use a table for `workflow_id/version`, trigger/frequency, users, owner, inputs,210sources, dependencies, value hypothesis, complexity, risk, human boundary,211support, fallback, and evidence status.212213## Readiness map214215List every readiness dimension with status, evidence/source, limitation, gap216owner, and next receipt. Keep `Missing`, `Blocked`, and `Not run` distinct.217218## Route219220Return exactly one of `Test now`, `Validate further`, `Sequence later`, or221`Avoid for now`, followed by the decisive signals, unresolved blockers, and222why the other routes are not currently better supported.223224## Smallest safe test or recovery225226For `Test now`, define scope, participants, version, allowed inputs, cases,227reviewer, receipt/oracle, duration, stop rule, fallback, and review date. For228other routes, define the smallest evidence, dependency, sequencing condition,229or safe alternative that changes the decision.230231## Claims ledger232233Use a table with claim, status, scope/unit, source/method, date/version,234limitation, and next receipt. Do not make an unmeasured value, adoption,235quality, safety, or production claim.236237## Human control and support238239State what AI may draft/recommend/do, what a person must check/approve/reject,240when to stop/ask/escalate, who supports the work, and the manual fallback.241242## Implementation handoff243244Name the owner, smallest authorized next action, affected surfaces, source and245privacy review, acceptance/evidence receipt, writeback location, and follow-on246skill. Do not imply that the action was executed.247248## Not covered249250List unsupported market size, demand, business value, ROI, adoption, traffic,251stars, quality, model performance, safety, privacy, security, accessibility,252localization, cost, latency, reliability, production readiness, rollout,253rollback execution, or causal impact.254255## Review ask256257Ask the reviewer to choose exactly one: `Test now`, `Validate further`,258`Sequence later`, or `Avoid for now`. Name the one unresolved evidence or risk259that should be corrected before the route changes.260261## Edge cases262263- **Missing owner:** route to `Validate further` or `Avoid for now`; do not264 infer accountability from the requester.265- **Missing access or approval:** keep the workflow untested and name the266 legitimate owner and permission receipt; never suggest bypassing controls.267- **High-impact or external action:** require narrow exposure, explicit human268 approval, visible fallback, stop/escalation behavior, and a reviewable269 receipt before `Test now`.270- **No repeated workflow:** a one-off job can still be tested only if the271 representative case, oracle, reviewer, and learning purpose are explicit;272 do not call it repeatable or valuable.273- **Conflicting signals:** preserve the contexts and route to `Validate274 further` or `Sequence later` with a tie-break receipt.275- **Synthetic or fictional input:** label the entire output `fictional276 fixture`; it can exercise the packet but cannot establish a real decision,277 value, adoption, or growth claim.278- **Provider/model/tool change:** route to a change-aware evaluation and279 revalidation plan; readiness does not replace paired testing.280- **Unsafe or unobservable job:** route to `Avoid for now` and state the human281 or manual alternative. Do not convert uncertainty into a green light.282- **Question asks for stars, traffic, or growth:** keep those claims outside283 the workflow decision and mark them `Not measured` or `Not covered`.284285## Final check286287Before handoff, confirm:288289- [ ] one workflow candidate, user/job, owner, and decision date are explicit;290- [ ] current workaround, value hypothesis, complexity, and risk are separated;291- [ ] inputs, sources, permissions, dependencies, support, and fallback are named;292- [ ] user readiness, technical readiness, human boundary, and testability are separate;293- [ ] missing and blocked evidence is not hidden in a score;294- [ ] exactly one of the four readiness routes is selected;295- [ ] `Test now` has a bounded representative test and stop rule, or another route has a recovery condition;296- [ ] every material claim has status, scope, source/method, limitation, and next receipt;297- [ ] no adoption, value, safety, quality, production, or growth claim outruns evidence;298- [ ] human owner, support path, and manual fallback are visible;299- [ ] unsupported surfaces are listed under `Not covered`.300301## Source notes302303This skill's readiness framing is informed by the official OpenAI Academy304materials on [AI use-case discovery and prioritization](https://academy.openai.com/public/clubs/champions-ecqup/resources/ai-use-case-discovery-and-prioritizer-2026-05-07),305the [AI workflow starter worksheet](https://academy.openai.com/en/public/clubs/champions-ecqup/resources/ai-workflow-starter-worksheet-2026-07-07),306[Activator Labs foundations](https://academy.openai.com/public/clubs/champions-ecqup/videos/recording-activator-labs-101-foundations-2026-07-23),307and [Getting Started as an Agent Activator](https://academy.openai.com/public/clubs/champions-ecqup/resources/getting-started-as-an-ai-activator-2026-06-08).308The source material is guidance, not evidence that any particular workflow is309ready, safe, valuable, or adopted.
Run npx skillmds@latest add asdc163/pm-ai-workflow-to-readiness in your terminal (requires Node.js), paste this page's agent-chat prompt into Claude, Cursor, or any MCP-connected agent, or download the SKILL.md file and copy it into your agent's skills directory.
Decide whether one real AI workflow candidate is ready to test now, needs more validation, should be sequenced later, or should be avoided for now. Use the supplied job, owner, value, complexity, risk, dependencies, user and technical readiness, human boundary, support, and smallest-test evidence without inventing adoption, value, safety, or production claims. It is listed under Productivity on SkillMD.
This skill has not completed SkillMD's automated safety review yet. SkillMD never runs a skill's scripts for you; review the SKILL.md before installing.
This skill is tagged as working with Claude Code, Claude.ai, OpenAI Codex. SKILL.md is an open format, so most agents that read a skills directory can load it too.
Yes. Installing skills from SkillMD is free, and the skill stays under its author's original license.
asdc163 (@asdc163) published this skill. Their other Agent Skills are listed on their SkillMD profile.