Acceptance Test Programme

Use when plan and execute acceptance proof and leak tests on flight hardware under ECSS-E-ST-32C clause 5.5: determine the required proof pressure for each pressurized assembly from its maximum design pressure and the applicable proof factor, confirm the applied test pressure meets or exceeds the requirement and that the hold duration satisfies the minimum dwell time, evaluate the measured leak rate against the allowable limit for each sealed assembly, and determine overall programme acceptance only when every test item passes. Trigger: ecss, e-st-32c, acceptance-test, proof-test, leak-test, flight-hardware, pressure-vessel, structural-acceptance.