Ballooning

Use when you must balloon the characteristics of an engineering drawing for an AS9102 first article inspection: assign sequential balloon numbers to every characteristic, map each verification method label to the AS9102 method code (measuring, attribute, functional, visual, analytical), classify each characteristic as key, critical, or standard, and reconcile the balloon count against the form 3 line items and the D-list accountability matrix. Produce the numbered characteristic list, the method code column, and the accountability verdict that feed the FAI characteristic accountability form. Trigger: ballooning, characteristic numbering, balloon number, D-list, accountability matrix, verification method code, drawing characteristics.

ashfordeOU 61aa15c 3 files · 16.8 KB Updated

File contents

ashfordeOU/aero-agent-skills/tree/main/skills/manufacturing-quality/as9102/ballooning commit 61aa15c6a0

Frequently asked questions

npx skillmds@latest add ashfordeou/ballooning