Delta Fai

Use when you must classify a change and determine the AS9102 delta first article inspection (delta FAI) scope: classify part number, material, process, tooling, drawing revision, location, or supplier changes as full new FAI, delta FAI, or no FAI, then scope the affected forms 1, 2, and 3 and the affected characteristics for the delta. Determine whether a full new FAI is required or a delta FAI suffices, and produce the change classification, the delta scope forms, and the affected characteristic list. Trigger: delta fai, change classification, full new fai, delta first article, material change, process change, tooling change, drawing revision.