ECSS Structures — DRD Fracture-Critical Item Lists (space-systems/ecss/drd-fci-lists)
Use when the task is building or auditing the Annex G fracture-critical item register required by ECSS-E-ST-32C -- screening structural items against fracture-criticality criteria, assigning each item to the PFCIL, FCIL, or FLLIL, and verifying the consistency of the three lists with one another.
Domain quick reference
- ECSS-E-ST-32C Annex G establishes three fracture-critical registers. The FCIL (Fracture Critical Item List) covers every item whose fracture would degrade mission performance or cause loss; it is the superset. The PFCIL (Primary Fracture Critical Item List) is the subset whose single fracture causes immediate loss of life, vehicle, or mission. The FLLIL (Fracture Limited Life Item List) is the subset of FCIL items for which the required fracture life is met by analysis or test within a finite service interval rather than through a fracture-proof design; these carry a life limit and a retest interval. A structural item not meeting any fracture-criticality criterion is screened out and does not appear on any list.
- Because PFCIL and FLLIL are derived subsets of the FCIL, every item on the PFCIL must also appear on the FCIL, and every item on the FLLIL must also appear on the FCIL. A cross-reference gap is a register deficiency, not an acceptable shortcut.
- Each FCIL entry requires: item identifier, description, material, assumed initial flaw size, fracture toughness, applied stress, required service life in load cycles, computed fracture life, and disposition (fracture-proof, safe-life, leak-before-burst, or retirement). PFCIL entries additionally require the failure consequence category (loss_of_life, loss_of_vehicle, or loss_of_mission). FLLIL entries additionally require the life limit in cycles and the retest interval in cycles.
- The fracture life margin of safety is (computed_life / required_life) - 1; a negative margin means the item does not satisfy its service-life requirement and must be dispositioned before the register is closed.
Workflow
- Enumerate every structural item in scope and apply the fracture-criticality screening question: would a single through-crack or fracture of this item cause loss of life, loss of vehicle, loss of mission, or degrade mission performance? Items answering no to all consequent levels are screened out and recorded as non-fracture-critical; they do not enter any register.
- For each fracture-critical item, determine its failure consequence level. If a single fracture causes immediate loss of life, vehicle, or mission, add the item to both the PFCIL and the FCIL. Otherwise add it to the FCIL only.
- For each fracture-critical item, determine whether its required service life is met through a fracture-proof design margin or through a bounded analysis with a defined life limit. If the item carries a finite life limit and a retest interval, add it to the FLLIL as well as the FCIL.
- Validate each FCIL entry: confirm all required fields are present, flaw size and fracture toughness are positive, stress and life values are positive, and disposition is one of the four accepted values. Compute the fracture life margin of safety for every entry; flag any entry with a negative margin.
- Validate each PFCIL entry against the FCIL rules plus the additional check that failure_consequence is present and is one of the three accepted consequence categories.
- Validate each FLLIL entry against the FCIL rules plus the additional checks that life_limit_cycles is not less than required_life_cycles and that retest_interval_cycles does not exceed life_limit_cycles.
- Perform cross-reference checks: verify every PFCIL item ID appears in the FCIL, and every FLLIL item ID appears in the FCIL. Record any discrepancies as register deficiencies.
- Aggregate findings from all validation and cross-reference checks; the register is not complete until all finding lists are empty.
Pitfalls
- Treating the PFCIL as independent of the FCIL -- the PFCIL is a derived subset; an item cannot be on the PFCIL without appearing on the FCIL, and any gap between the two is a register deficiency, not an allowed simplification.
- Setting a life limit on an FLLIL item below the required service life -- the life limit must meet or exceed the required_life_cycles; a limit shorter than the service requirement means the item was retired before the mission ended, which must be captured in the mission design, not papered over in the register.
- Leaving the fracture toughness or flaw assumption fields blank and treating the absence as conservative -- the mandatory fields exist precisely because the computed fracture life depends on them; an entry without these values cannot be verified and must not be counted as validated.
- Reading a zero or positive margin of safety as proof the design is mature -- a margin of exactly zero means the computed life equals the required life with no reserve; a margin below the project-level fracture control requirement (often MOS >= 0 after scatter factors) must still be flagged.
Behavior contract (gate 3)
The item-categorization, entry-validation, margin-of-safety, and cross-reference logic is exercised by the gate 3 contract test: scripts/test_drd_fci_lists.py against scripts/drd_fci_lists_logic.py (stdlib unittest, offline). Run: python3 scripts/test_drd_fci_lists.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.