E10 Design Budgets

Use when allocate technical budgets (mass, power, data rate, link, pointing, thermal, or any other quantifiable design resource) for a space system under ECSS-E-ST-10C clause 5.4.1.2 and Annex I: determine the minimum required margin for the project's current life-cycle phase, track each item's current best estimate against its allocation and the phase's required margin, verify that sub-item allocations sum within the parent system-level allocation, and check the system-level margin on the summed current best estimates. Trigger: ecss, e-st-10c, technical budget, margin philosophy, budget allocation, current best estimate, mass budget, power budget, margin management, maturity margin.