ECSS System Engineering — Interface Management/Control (space-systems/ecss/e10-interface-control)
Use when the task is system-level interface management/control under ECSS-E-ST-10C clause 5.6.4 -- identifying every interface between two interfacing elements, determining the control document each interface needs per ECSS-E-ST-10-24, and tracking that interface through its control lifecycle from identification to verification.
Domain quick reference
- An interface exists between exactly two interfacing elements and belongs to exactly one physical domain: mechanical, electrical, thermal, data, or fluid. A source pairing outside these five domains is rejected before it enters the register.
- An interface's responsibility boundary is internal (both interfacing elements sit under the same responsible owner) or external (the two elements have different responsible owners, e.g. a spacecraft-to- launcher or spacecraft-to-ground interface). The boundary determines the control document ECSS-E-ST-10-24 requires once the interface matures past drafting: an internal interface is controlled by a lighter-weight interface control note, an external interface must be controlled by a formal, configuration-baselined ICD.
- Every interface progresses through a fixed control status sequence: identified, ird_drafted, ird_agreed, icd_baselined, verified. The interface requirement document (IRD) captures the needed interface characteristics before design commitment; the interface control document (ICD) (or, for an internal interface, the interface control note) baselines the agreed, as-designed definition once the interface has matured. A status cannot advance more than one step at a time -- an interface cannot jump from identified straight to icd_baselined without first passing through the IRD steps.
- Each interfacing side declares its own parameter set for the interface (e.g. connector type, voltage, data rate, mounting envelope). The two declarations must agree key-for-key; a parameter present on only one side, or present on both with different values, is an unresolved interface definition, not a controlled one.
Workflow
- For each candidate interface, record the two interfacing elements and their responsible owners, and classify the interface's physical domain. Reject an unrecognized domain before the interface enters the register.
- Determine the interface's responsibility boundary from the two owners: internal if they match, external if they differ. Use the boundary to look up the control document ECSS-E-ST-10-24 requires once the interface reaches baselining (ICD for an external interface, interface control note for an internal one).
- Check the interface's current control status against the documents on record: an interface at ird_drafted or later must show an IRD on record; an interface at icd_baselined or later must additionally show the boundary-appropriate control document on record. Flag any status/document mismatch.
- Compare the two sides' declared interface parameters key by key. Flag a parameter missing from one side and a parameter present on both sides with mismatched values.
- When advancing an interface's status, verify the move is exactly one step forward along the fixed sequence (identified -> ird_drafted -> ird_agreed -> icd_baselined -> verified); reject a skipped step, a backward move, or an unrecognized status name.
- Aggregate the documentation and parameter findings per interface; the interface is not under control until both lists are empty.
Pitfalls
- Treating an internal interface as exempt from control -- it still needs an IRD and a baselined control record, just not the formal external ICD; only the required document changes with the boundary, not whether control is required at all.
- Letting an interface reach icd_baselined or verified while its two sides still declare different parameter values -- a status advance is not evidence that the definitions agree; check the parameters independently of the status.
- Allowing a status to jump straight from identified to icd_baselined because "the design is obviously done" -- the IRD steps exist to capture the interface requirement before the design commits to a specific ICD, and skipping them removes that checkpoint.
- Reporting an interface as controlled because an IRD exists, without checking whether the later-stage document (ICD or control note) was ever baselined -- an IRD is a precursor, not a substitute, for the baselined control record.
Behavior contract (gate 3)
The domain-classification, boundary/required-document, status- transition, and parameter-consistency logic is exercised by the gate 3 contract test: scripts/test_e10_interface_control.py against scripts/e10_interface_control_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e10_interface_control.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.