ECSS Requirement Allocation (space-systems/ecss/e10-req-allocation)
Use when the task is allocating system or product requirements to functions and to product-tree elements under ECSS-E-ST-10C clause 5.2.3.5, continuing the requirement flow-down started in the sibling e10-req-analysis and e10-trs-flowdown leaves.
When to use
- A requirement set exists (from e10-req-analysis / e10-trs-flowdown) and needs allocating to the functions that realize it and the configuration items (CIs) that implement it.
- Checking allocation completeness before freezing a requirement baseline (see e10-req-baseline) or a configuration baseline (see e10-config-baselines).
- Tracing which product-tree elements implement a given function, or which requirements land on a given CI.
Domain quick reference
- Functional analysis decomposes the system into functions (the function tree; see e10-config-content / Annex H); the product tree decomposes it into configuration items (CIs).
- Clause 5.2.3.5 requires every requirement to be allocated both to the function(s) it drives and to the product-tree element(s) that implement it -- a two-sided allocation, not just one.
- Allocation is many-to-many: a requirement can drive several functions and land on several CIs; a function or CI can carry several requirements.
- Allocation is distinct from verification-method assignment (see e10-req-verif-methods) and from traceability record-keeping (see e10-req-traceability), though all three ride on the same requirement set.
Procedure
- Fix the reference function tree and product tree for the level being allocated (from functional analysis and the specification tree; see e10-spec-tree).
- For each requirement, identify the function(s) it drives and record the functional allocation.
- For each requirement, identify the product-tree element(s) (CIs) that implement it and record the product-tree allocation.
- Reject an allocation that names a function or CI outside the reference trees (a naming or scope error).
- Reject a requirement recorded with only a functional allocation or only a product-tree allocation -- clause 5.2.3.5 requires both sides before the allocation counts as complete.
- Run the coverage check: list requirements still unallocated, and list functions or CIs carrying zero requirements (orphans worth a second look -- an unused function/CI, or a missed allocation).
- Feed the completed allocation into the requirement baseline (e10-req-baseline) and the configuration baseline (e10-config-baselines); do not freeze either baseline while requirements remain unallocated.
Pitfalls
- Allocating a requirement to a function only (or a CI only) and treating that as complete -- clause 5.2.3.5 needs both sides.
- Allocating to a function or CI name that was never defined in the function/product tree (typo or scope drift).
- Leaving an orphan CI or function unnoticed, which usually means a requirement was missed or the tree includes an element nothing actually needs.
- Confusing allocation (this leaf) with verification-method assignment (e10-req-verif-methods) -- allocation says where a requirement lives, not how it is proven.
Verification
The allocation and coverage logic is exercised by the gate 3 contract test: scripts/test_e10_req_allocation.py against scripts/e10_req_allocation_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e10_req_allocation.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.