ECSS Requirement Verification Method & Level Assignment (space-systems/ecss/e10-req-verif-methods)
Use when the task is assigning a verification method and a verification level to requirements under ECSS-E-ST-10C, ahead of detailed verification planning (E-ST-10-02) and test planning (E-ST-10-03).
Domain quick reference
- ECSS-E-ST-10C clause 5.2.3.4 requires that every requirement carry a verification method and a verification level as part of requirement engineering, before the detailed verification programme is planned under E-ST-10-02.
- Four verification methods (detailed in E-ST-10-02 clause 5.2.2): test (measurement under representative or controlled conditions), analysis (calculation, modelling, simulation, or similarity/heritage argument), review of design (examination of existing design or heritage records), inspection (visual or dimensional examination of a physical characteristic).
- Verification levels (E-ST-10-02 clause 5.2.3) run equipment, subsystem, element, segment, system. A requirement is normally verified at the level it is allocated to (see the sibling e10-req-allocation leaf), unless compliance is only observable once the element is integrated with its neighbours (an interface or emergent-behaviour requirement), in which case verification moves up one level.
- Safety-critical requirements should not be closed out by review of design alone; test is preferred when feasible, analysis is the fallback when it is not.
Workflow
- For each requirement, capture its verification-relevant attributes: characteristic category (physical, functional, design, or performance), whether test is feasible, whether existing design or heritage evidence already covers it, whether it is safety-critical, and the product-tree level it is allocated to.
- Select the verification method by precedence: physical characteristic -> inspection; else safety-critical -> test if feasible, otherwise analysis; else existing heritage evidence -> review of design; else test if feasible; otherwise analysis.
- Assign the verification level: default to the requirement's allocation level; bump one level up only for an interface or emergent-behaviour requirement whose compliance is only observable after integration (a system-level requirement stays at system).
- Build the verification matrix: one (method, level) pair per requirement id, and confirm no requirement id from the input set is missing from the matrix -- clause 5.2.3.4 calls for a method and a level on every requirement, not a sample.
- Before closing the assignment, re-check any manually overridden method against the safety-critical rule and flag violations (a safety-critical requirement overridden to review of design) for engineering disposition rather than silently accepting them.
- Hand the matrix to the Verification Plan / VCD (E-ST-10-02 clause 5.2.8) and to test planning (E-ST-10-03) for every requirement assigned the test method.
Pitfalls
- Defaulting every requirement to test regardless of feasibility, driving unnecessary cost and schedule instead of using analysis or review of design where they are legitimate.
- Closing out a safety-critical requirement by review of design alone.
- Leaving an interface or emergent-behaviour requirement assigned at its component level instead of the integrated level where the interaction is actually observable.
- Dropping requirements from the matrix -- an incomplete matrix fails the "every requirement" mandate of clause 5.2.3.4 even if the requirements present are assigned correctly.
Behavior contract (gate 3)
The method-selection, level-assignment, matrix-completeness, and safety-override logic is exercised by the gate 3 contract test: scripts/test_e10_req_verif_methods.py against scripts/e10_req_verif_methods_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e10_req_verif_methods.py