E10 Risk Mgmt

Use when managing technical risk for a space project under ECSS-E-ST-10C clause 5.6.8: identify a risk, analyse it into a likelihood x severity risk class, plan and record mitigation actions for risks that require them, assess the residual risk left after mitigation, and escalate residual risk that remains above the acceptable band for formal acceptance, in coordination with the ECSS risk-management standard M-ST-80. Distinct from the sibling e10-req-risk-analysis leaf, which scores risk per individual requirement rather than tracking the project-wide risk register through mitigation, residual assessment, and acceptance. Trigger: ecss, e-st-10c, technical risk management, risk register, mitigation action, residual risk, risk acceptance, m-st-80, risk escalation.