ECSS Verification — Integration and Test Facility Qualification (space-systems/ecss/e1002-facilities)
Use when the task is qualifying an integration and test facility or a test tool per ECSS-E-ST-10-02C clause 5.2.6.6 -- confirming a facility or tool is fit to host a specific test on a flight article before that test is run, with the facility's quality standing tied to the ECSS-Q-ST-20-07 test-centre quality framework.
Domain quick reference
- A test method (thermal-vacuum, thermal-balance, sine/random vibration, acoustic, EMC emissions/susceptibility, mass-properties, alignment, cleanliness inspection) has exactly one facility type that can host it. A method with no mapped facility type is not recognized and must be rejected before qualification proceeds -- it is not defaulted to the nearest-looking facility.
- A facility is qualified only when three independent checks all pass: its operating envelope covers the test's required range end to end (partial overlap is a fail, not a partial pass), its quality accreditation is currently "accredited" and specifically against Q-ST-20-07 (a live accreditation against a different quality standard, e.g. a generic lab-competence standard, does not satisfy this clause), and its calibration is current at the day the test is run. All three findings are collected, not short-circuited on the first failure, so a facility with multiple defects reports all of them at once.
- A test tool (mechanical/electrical/software GSE, measurement instrument, handling equipment) is qualified when its interfaces are a superset of what the article requires -- a tool missing even one required interface is incompatible, not "mostly compatible." Only a measurement-instrument tool additionally carries a calibration-currency requirement; other tool types are interface-checked only.
- Calibration currency is a day-count comparison: an asset stays current through the exact day its interval elapses (day count equal to the interval is still current) and expires the day after. A calibration record whose "current day" precedes its own last-calibration day is invalid input, not an edge case to silently accept.
- A qualification-plan record is complete only when it carries every one of: facility_id, requirement_ref, capability_check, calibration_check, accreditation_check, qualification_date. A record missing any of these cannot support a qualification decision, regardless of what the present fields say.
- AIT readiness is a roll-up across every facility and tool qualification result feeding a test campaign: the gate opens only when every result is "qualified." One blocking (not-qualified) result holds the whole gate, and the roll-up reports how many results are blocking so the campaign owner knows the size of the punch list.
Workflow
- For each planned test, map its test method to the required facility type. Reject a test method that has no mapping rather than guessing a facility type for it.
- For the candidate facility, check its capability envelope against the test's required range, its accreditation status and standard against the "accredited" + Q-ST-20-07 requirement, and its calibration currency against the day the test is scheduled. Collect every finding the facility produces; do not stop at the first one.
- For each test tool associated with the test, check its interfaces against the article's required interface set, and -- if the tool is a measurement instrument -- its calibration currency for the same scheduled day.
- Before relying on a qualification-plan record, verify it carries all six required fields; treat a record with any field missing as insufficient to support a go decision.
- Roll every facility and tool qualification result for the campaign up into a single AIT readiness verdict. Do not declare readiness while any individual result remains not-qualified.
- Re-run the qualification checks whenever a facility's accreditation, calibration, or capability envelope changes, or whenever a tool's interface set or calibration changes -- qualification is a point-in-time result, not a permanent attribute of the asset.
Pitfalls
- Treating a facility whose envelope only partially overlaps the required range as usable "for most of the test" -- clause 5.2.6.6 qualification requires the envelope to cover the full required range, not merely intersect it.
- Accepting a facility's accreditation against a different quality standard as satisfying the Q-ST-20-07 test-centre requirement -- accreditation is standard-specific, and a lab-competence certificate against an unrelated standard does not substitute for it.
- Stopping the facility check at the first failing item -- a facility can simultaneously fail envelope, accreditation, and calibration, and reporting only the first hides the rest of the punch list from whoever has to fix it.
- Skipping the calibration check for a test tool that is not a measurement instrument -- correct, but only for that tool type; a measurement instrument still needs the same currency check the facility gets, and skipping it there is a miss, not a shortcut.
- Declaring AIT readiness from a partial set of qualification results (e.g. only the facilities, not the tools) -- the roll-up is only meaningful over the complete set of assets feeding the campaign.
Behavior contract (gate 3)
The method-to-facility mapping, capability-envelope, calibration-currency, accreditation, tool-interface, plan-completeness, and readiness roll-up logic is exercised by the gate 3 contract test: scripts/test_e1002_facilities.py against scripts/e1002_facilities_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e1002_facilities.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.