ECSS Verification — Inspection Report DRD (space-systems/ecss/e1002-inspection-report)
Use when the verification method is inspection under ECSS-E-ST-10-02
clause 5.3.2.4 and Annex E -- a measurement or observation made on the
actual article, whose worth depends on the instrument, the inspector and
the tolerance it was judged against.
Domain quick reference
- Calibration is checked against the day the measurement was taken, not
against today. An instrument recalibrated last week says nothing about
a reading it produced after its previous certificate lapsed, and a
present-tense calibration check silently accepts exactly that.
- Calibration expiring on the inspection day still covers it. The
certificate is valid through its due date.
- Equipment with no calibration date on record is treated as invalid,
not as unknown. An unverifiable instrument cannot support a
measurement.
- Tolerances are magnitudes. A negative tolerance is an input error, not
a reversed band -- reversing it silently would invert the conformity
test and pass every out-of-tolerance part.
- A value exactly on a limit conforms. The tolerance band is the
requirement itself, not an open interval, and treating limits as
exclusive rejects parts that meet the drawing.
- Variable and attribute characteristics are judged differently: the
first against its band, the second by its recorded observation. An
attribute characteristic needs no measuring equipment, so the
equipment check does not apply to it.
- A characteristic with no reading is not inspected, which is distinct
from inspected and nonconforming. One is missing work, the other is a
known defect, and they are closed differently.
- Inspector qualification is checked against the roster, not asserted in
the report.
- A lapsed calibration invalidates a conforming result just as much as a
nonconforming one -- the reading itself is not trustworthy.
Workflow
- Confirm the report names the article and the inspection day.
- Check the inspector against the qualified roster.
- For each variable characteristic, confirm measuring equipment is
declared and its calibration covered the inspection day.
- Judge each variable characteristic against its tolerance band, and
take each attribute characteristic's recorded result.
- Partition characteristics into conforming, nonconforming and not
inspected, rejecting duplicate identifiers.
- The inspection is acceptable only when everything was inspected,
everything conforms, and no equipment or inspector finding stands.
Pitfalls
- Checking that an instrument is "in calibration" at audit time rather
than at measurement time, which accepts every reading taken while it
was lapsed.
- Treating tolerance limits as exclusive, rejecting parts that are
exactly on the drawing limit.
- Accepting a negative tolerance and silently building a reversed band.
- Filing an uninspected characteristic with the nonconforming ones, or
worse with the conforming ones by defaulting a blank reading.
- Applying the measuring-equipment check to attribute characteristics
and generating findings against visual inspections that need none.
- Accepting a conforming measurement from a lapsed instrument because
the part passed anyway. The number is not evidence.
Behavior contract (gate 3)
The tolerance-band, limit-inclusive conformity, calibration-validity,
equipment, inspector-qualification and partition logic is exercised by
the gate 3 contract test: scripts/test_e1002_inspection_report.py
against scripts/e1002_inspection_report_logic.py (stdlib unittest,
offline). Run:
python3 scripts/test_e1002_inspection_report.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.
1---2name: e1002-inspection-report3description: "Use when produce or audit an inspection report against the ECSS-E-ST-10-02 clause 5.3.2.4 and Annex E Document Requirements Definition: judge each variable characteristic against its own tolerance band with the limits included, take an attribute characteristic's recorded result, confirm the measuring equipment held a calibration valid on the day the measurement was taken, confirm the inspector appears on the qualified roster, and separate characteristics never inspected from those inspected and found out of tolerance. Trigger: ecss, e-st-10-02c, inspection-report, annex-e-drd, tolerance-band, calibration-validity, inspector-qualification, conformity."4license: Apache-2.05compliance: STANDARDS-REF6standards:7 - id: ecss8 reference-only: true9gated: false10domain: space-systems11pack: space-systems12compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"13metadata:14 source: https://skillmd.com/skills/ashfordeou/e1002-inspection-report15 domain: space-systems16 subdomain: ecss17 tags: [ecss, e-st-10-02c, inspection-report, annex-e-drd, tolerance-band, calibration-validity, conformity]18 version: 0.1.019 author: Aero Agent Skills20---2122# ECSS Verification — Inspection Report DRD (space-systems/ecss/e1002-inspection-report)2324Use when the verification method is inspection under ECSS-E-ST-10-0225clause 5.3.2.4 and Annex E -- a measurement or observation made on the26actual article, whose worth depends on the instrument, the inspector and27the tolerance it was judged against.2829## Domain quick reference3031- Calibration is checked against the day the measurement was taken, not32 against today. An instrument recalibrated last week says nothing about33 a reading it produced after its previous certificate lapsed, and a34 present-tense calibration check silently accepts exactly that.35- Calibration expiring *on* the inspection day still covers it. The36 certificate is valid through its due date.37- Equipment with no calibration date on record is treated as invalid,38 not as unknown. An unverifiable instrument cannot support a39 measurement.40- Tolerances are magnitudes. A negative tolerance is an input error, not41 a reversed band -- reversing it silently would invert the conformity42 test and pass every out-of-tolerance part.43- A value exactly on a limit conforms. The tolerance band is the44 requirement itself, not an open interval, and treating limits as45 exclusive rejects parts that meet the drawing.46- Variable and attribute characteristics are judged differently: the47 first against its band, the second by its recorded observation. An48 attribute characteristic needs no measuring equipment, so the49 equipment check does not apply to it.50- A characteristic with no reading is *not inspected*, which is distinct51 from inspected and nonconforming. One is missing work, the other is a52 known defect, and they are closed differently.53- Inspector qualification is checked against the roster, not asserted in54 the report.55- A lapsed calibration invalidates a conforming result just as much as a56 nonconforming one -- the reading itself is not trustworthy.5758## Workflow59601. Confirm the report names the article and the inspection day.612. Check the inspector against the qualified roster.623. For each variable characteristic, confirm measuring equipment is63 declared and its calibration covered the inspection day.644. Judge each variable characteristic against its tolerance band, and65 take each attribute characteristic's recorded result.665. Partition characteristics into conforming, nonconforming and not67 inspected, rejecting duplicate identifiers.686. The inspection is acceptable only when everything was inspected,69 everything conforms, and no equipment or inspector finding stands.7071## Pitfalls7273- Checking that an instrument is "in calibration" at audit time rather74 than at measurement time, which accepts every reading taken while it75 was lapsed.76- Treating tolerance limits as exclusive, rejecting parts that are77 exactly on the drawing limit.78- Accepting a negative tolerance and silently building a reversed band.79- Filing an uninspected characteristic with the nonconforming ones, or80 worse with the conforming ones by defaulting a blank reading.81- Applying the measuring-equipment check to attribute characteristics82 and generating findings against visual inspections that need none.83- Accepting a conforming measurement from a lapsed instrument because84 the part passed anyway. The number is not evidence.8586## Behavior contract (gate 3)8788The tolerance-band, limit-inclusive conformity, calibration-validity,89equipment, inspector-qualification and partition logic is exercised by90the gate 3 contract test: scripts/test_e1002_inspection_report.py91against scripts/e1002_inspection_report_logic.py (stdlib unittest,92offline). Run:93python3 scripts/test_e1002_inspection_report.py9495## Compliance9697- ECSS standards are freely downloadable (ESA); cite the source and98 paraphrase per standards-map.yaml.99- compliance: STANDARDS-REF, gated: false.