ECSS Post-Landing Verification (space-systems/ecss/e1002-post-landing)
Use when the task is running the post-landing verification stage under ECSS-E-ST-10-02C for an element whose mission profile returns hardware to Earth.
Domain quick reference
- ECSS-E-ST-10-02C clause 5.2.4.6 adds post-landing to the set of verification stages (alongside qualification, acceptance, pre-launch, in-orbit -- see the sibling e1002-stages leaf) for elements whose mission profile brings hardware physically back to Earth: a descent or re-entry capsule, a sample-return canister, a recoverable payload, or a stage recovered after splashdown.
- The stage is conditional, not universal: it applies "where applicable" -- an element that stays in orbit through disposal (no physical return) has no post-landing stage at all.
- Post-landing verification compares the condition of each recovered item (structure, mechanisms, thermal protection system, pyrotechnics, propulsion residuals, payload or samples, data recorders) against its pre-flight baseline, to confirm the item survived descent/landing as predicted and to close out any requirements that could only be verified after recovery.
- Not every item is guaranteed to be recoverable intact: an item lost, destroyed, or otherwise not physically recovered cannot be verified by inspection and needs alternate evidence (e.g. telemetry recorded before loss of signal) instead of being silently dropped.
Workflow
- Determine applicability: does the element's mission profile include physical return of hardware to Earth? If not, the post-landing stage does not apply and no further steps are needed.
- If applicable, enumerate the recovery item list for the element (structure, mechanisms, thermal protection system, pyrotechnics, propulsion residuals, payload/samples, data recorders -- only the types actually present on the element).
- For each item, record its recovery status (recovered intact, recovered degraded, not recovered) and whether its condition matches the pre-flight baseline.
- Classify each item's verification outcome: not recovered -> not verifiable by inspection (alternate evidence required); recovered degraded, or recovered but not matching baseline -> verified with findings (anomaly needs engineering disposition); recovered intact and matching baseline -> verified.
- Collect open findings (items needing disposition) and unverifiable items (items needing alternate evidence) separately -- both are gaps that block stage close-out until resolved.
- Close out the post-landing stage only once every open finding and every unverifiable item carries a recorded disposition; an element that was never applicable closes out trivially.
Pitfalls
- Running post-landing verification on an element that never returns to Earth (wasted effort; the stage is conditional per clause 5.2.4.6).
- Treating "not recovered" as equivalent to "no finding" -- a lost or destroyed item is a verification gap requiring alternate evidence, not a pass.
- Closing out the stage while a safety-critical item still has an open finding or missing disposition.
- Forgetting that "recovered degraded" is itself a finding even when the item's condition still nominally matches the pre-flight baseline on the checked characteristics.
Behavior contract (gate 3)
The applicability, outcome-classification, findings-collection, and close-out logic is exercised by the gate 3 contract test: scripts/test_e1002_post_landing.py against scripts/e1002_post_landing_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e1002_post_landing.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.