ECSS AIT — Anomaly Handling During Testing (space-systems/ecss/e1003-anomaly)
Use when the task is to resolve an anomaly or unexpected failure detected during spacecraft testing per ECSS-E-ST-10C §4.3.4 — categorizing the failure domain, applying immediate containment, verifying the anomaly record, assigning a disposition, and deriving which tests must be repeated.
Domain quick reference
- §4.3.4 requires that every unexpected event or failure observed during a test be formally captured before any recovery action is taken; containment preserves the as-found hardware state and test data so the failure can be accurately reproduced and investigated.
- Anomalies are grouped by failure domain: hardware (component or structural failure), software (crash, data corruption, protocol error), environmental (temperature or pressure exceedance, contamination event), electrical (power anomaly, ESD event, signal degradation), or mechanical (mechanism jam, structural interference). Each anomaly belongs to exactly one domain.
- Severity determines containment urgency: critical anomalies require an immediate test halt, hardware isolation, and responsible-engineer notification; major anomalies require suspension of test activity and a risk-to-hardware assessment; minor anomalies permit continued testing with enhanced monitoring and documentation.
- Disposition codes drive what happens next: accept-as-is closes the anomaly without corrective action; repair-and-retest mandates a corrective action followed by a defined retest scope; waiver-required routes the anomaly to the configuration control authority; reject fails the item outright; pending-analysis holds the anomaly open while investigation continues.
- The retest scope is derived from the disposition and the set of test cases whose results may have been invalidated by the anomaly or by the repair action that follows.
Workflow
- Detect and immediately preserve the test state: record the exact test procedure reference, step number, time-stamp, and instrument readings at the moment of detection before touching any hardware or software controls.
- Categorize the anomaly into exactly one failure domain (hardware, software, environmental, electrical, mechanical). Reject any anomaly type not in the defined domain set before proceeding — an uncategorized anomaly cannot be routed to the correct engineering authority.
- Assess severity (critical, major, or minor) based on the potential for hardware damage, data loss, schedule impact, and mission-risk consequences. Execute the containment action list mandated by that severity level in order; do not skip steps.
- Verify the anomaly record contains all required documentation fields: anomaly identifier, description of the observed behavior, detected-at timestamp, affected item reference, test procedure reference, name of the person who detected it, and initial findings. Flag each missing field as a record gap before assigning disposition.
- Assign a disposition code. If the code is pending-analysis, flag the anomaly as open and do not advance to retest derivation until a final disposition is set. Reject any disposition string outside the recognized code set.
- Derive the retest scope: for repair-and-retest dispositions, union the set of test cases directly affected by the anomaly with any test cases whose scope overlaps the repair action. For all other dispositions, the mandatory retest set is empty (though the responsible engineer may still elect to rerun tests at their discretion).
- Close the anomaly record when the disposition is final, all record gaps are resolved, and either the retest scope is complete or the disposition does not require retesting.
Pitfalls
- Touching hardware or resetting software before capturing the as-found state — containment must precede any recovery action; data lost at this step cannot be reconstructed.
- Treating a pending-analysis disposition as closed — an anomaly in this state is still open and must not be counted toward test completion.
- Defining the retest scope only as the test that surfaced the anomaly — the repair may invalidate results from earlier tests that exercised the same interface or subsystem; those must be included in the scope.
- Leaving the anomaly record with missing fields and proceeding to disposition — §4.3.4 requires a complete record before the configuration control authority can act on the disposition.
- Assigning a minor severity to an anomaly that involves any hardware damage risk, even if the immediate observable impact is small — severity must reflect the worst credible consequence, not the observed symptom.
Behavior contract (gate 3)
The anomaly-categorization, containment-action derivation, record-field validation, disposition handling, and retest-scope derivation logic is exercised by the gate 3 contract test: scripts/test_e1003_anomaly.py against scripts/e1003_anomaly_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e1003_anomaly.py