ECSS E-ST-10C — Test Documentation Set (space-systems/ecss/e1003-test-docs)
Use when the task is to produce and control the test documentation set required by ECSS-E-ST-10C §4.3.3 — defining the AIT plan, the Test Specification (TSPE), the Test Procedure (TPRO), and the Test Report, and verifying that the set is complete, traceable, and sequenced before the test campaign begins.
Domain quick reference
- §4.3.3 mandates four document types for any test campaign: the AIT plan (schedules and resources the campaign), the TSPE (specifies what to test and the pass/fail criteria), the TPRO (step-by-step execution instructions), and the Test Report (records results and dispositions). Each document type belongs to exactly one category within the set; a set that omits any of the four is incomplete.
- Every document must carry document-control fields: a type identifier, an issue number (positive integer), an issue date, and an approval status drawn from DRAFT, APPROVED, RELEASED, or SUPERSEDED. A document without a valid issue number or date has not entered configuration control and cannot gate a test campaign.
- Traceability is required for the TSPE and TPRO: each must reference at least one recorded test requirement by identifier. The AIT plan and Test Report are not required to carry forward requirement traces, but the TSPE must establish them and the TPRO must inherit them. A TSPE or TPRO with no trace entries is a traceability gap.
- Document sequencing follows the campaign lifecycle: the AIT plan must reach APPROVED status before the TSPE is released; the TSPE must reach APPROVED before the TPRO is released; the TPRO must reach APPROVED before the Test Report is issued. Releasing a downstream document while its predecessor is still in DRAFT is a sequence violation, not merely an advisory.
Workflow
- Inventory the planned test campaign and confirm which of the four document types (AIT_PLAN, TSPE, TPRO, TEST_REPORT) are present in the documentation set. Record any type that is absent; the set is not ready for the sequence check until all four are accounted for.
- For each document, verify the document-control fields: confirm the type identifier matches a recognized value, the issue number is a positive integer, the date is populated, and the status is one of DRAFT, APPROVED, RELEASED, or SUPERSEDED. Flag any document that fails these checks before proceeding.
- Check traceability for the TSPE and TPRO: each must list at least one requirement identifier, and every listed identifier must appear in the approved test-requirements register. Flag a document with an empty trace list or with a trace pointing to an unregistered identifier.
- Evaluate document sequencing: confirm the AIT plan is at APPROVED or later before the TSPE is at RELEASED or later; confirm the TSPE is at APPROVED or later before the TPRO is at RELEASED or later; confirm the TPRO is at APPROVED or later before the Test Report is at RELEASED or later. Record any predecessor-not-ready violation.
- Aggregate all findings by document type. A test documentation set is compliant only when the missing-document list is empty, every document passes its field and traceability checks, and no sequence violation is recorded.
Pitfalls
- Treating an incomplete set as ready because the available documents are individually valid — a campaign cannot start without all four document types, regardless of the status of those already present.
- Accepting a TSPE or TPRO with trace entries that do not appear in the registered test-requirements list — a dangling trace is as problematic as no trace because it cannot be verified against a recorded requirement.
- Reading "no sequence violation" as compliant when a predecessor document is absent entirely — if the AIT plan does not exist, the TSPE cannot be sequenced against it, and the absence is itself a finding.
- Treating DRAFT status as equivalent to APPROVED for sequencing purposes — a predecessor in DRAFT has not been formally reviewed and cannot gate the release of a downstream document.
Behavior contract (gate 3)
The document-completeness, field-validation, traceability, and sequence-readiness logic is exercised by the gate 3 contract test: scripts/test_e1003_test_docs.py against scripts/e1003_test_docs_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e1003_test_docs.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.