ECSS System Engineering — Test Programme Definition (space-systems/ecss/e1003-test-programme)
Use when the task is to define the test programme for a space system or subsystem under ECSS-E-ST-10C §4.1: establishing which hardware models participate, which test level each model is subject to, what ordered test sequence each model follows, which programme-level documents must be on record before testing begins, and which verification inputs must be supplied before each test activity can be scheduled.
Domain quick reference
- §4.1 distinguishes hardware models by their role in the programme. Bread Board (BB) and Engineering Model (EM) are used for development verification and are subject to development test levels. Qualification Model (QM) and Engineering Qualification Model (EQM) are tested at qualification levels to demonstrate design margin. Proto-Flight Model (PFM) is tested to qualification levels but is then retained as the flight unit rather than being consumed in the programme. Flight Model (FM) is tested to acceptance levels only. Each model type maps to exactly one test level — development, qualification, proto-flight, or acceptance — and that mapping must be established before any test activity is assigned to the model.
- The test sequence for a given model is an ordered list of test
activities assigned unique consecutive position numbers starting from
- A functional test at position 1 provides the performance baseline before any environment is applied. A functional test at the final position confirms the unit survived the preceding environments without degradation. Any gap or duplication in position numbering is a programme fault, not a scheduling preference, and must be resolved before the sequence is accepted.
- Four programme-level documents must be on record before any test activity is scheduled: the test plan, test procedures, verification control document, and test reports template. A missing document is a programme finding that blocks test scheduling.
- Each test activity type requires specific verification inputs to be supplied in advance (for example, a vibration-random activity requires a loads environment and qualification levels; a thermal-vacuum activity also requires a thermal model). An activity missing any of its required inputs is an open finding and must not be scheduled until those inputs are resolved.
Workflow
- Collect every hardware item entering the test programme and assign each one a model type from the recognised set: BB, EM, QM, EQM, PFM, FM. Reject any type that is not in that set — an unrecognised type signals a programme documentation error upstream.
- For each model, derive its test level from the model type using the fixed mapping (BB/EM → development; QM/EQM → qualification; PFM → proto-flight; FM → acceptance). Record this level before assigning any test activities, because the level governs the environment magnitudes and margin factors for all subsequent activities.
- For each model, build the ordered test sequence: list every planned test activity with a unique, consecutive position starting from 1. Validate that each test type is from the recognised set, that all positions are unique and consecutive, and that every activity references the correct model identifier.
- Check the functional bookend: confirm the first activity in the sequence (position 1) is a functional test and the last activity is also a functional test. Both conditions must hold; a missing bookend is a sequence fault.
- Confirm that all programme-level documents are on record: test plan, test procedures, verification control document, test reports. Record each missing document as a programme finding and do not proceed to scheduling until it is resolved.
- For each test activity across all model sequences, check that the activity's required verification inputs are supplied. Record each missing input as a verification input gap.
- Aggregate all findings (model type errors, sequence faults, bookend faults, missing documents, input gaps) into a programme summary. The programme is valid only when the findings list is empty.
Pitfalls
- Treating a PFM as equivalent to a QM — PFM maps to the proto-flight test level, not qualification, because the hardware is not consumed in the programme. Misassigning the level changes the applicable margins and the disposition of the unit after testing.
- Allowing non-consecutive or duplicate sequence positions — a gap means an activity was silently omitted; a duplicate means two activities were merged without programme documentation to record the decision.
- Starting test scheduling before all programme documents are confirmed — a test plan that is signed off after testing has begun cannot govern that testing retroactively.
- Treating "inputs will be supplied later" as a schedule risk rather than a programme finding — a test activity with missing inputs is an open finding that blocks that activity from being scheduled.
- Omitting the functional bookend check because environmental tests look complete — without a post-environmental functional test there is no objective evidence that the unit survived the applied environments.
Behavior contract (gate 3)
The model categorization, sequence validation, functional bookend check, programme documentation check, and verification input check logic is exercised by the gate 3 contract test: scripts/test_e1003_test_programme.py against scripts/e1003_test_programme_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e1003_test_programme.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.