E1006 Process

Use when execute the Technical Specification establishment process under ECSS-E-ST-10C §5: advance through phase-0 preliminary TS tasks (F1.1–F1.4), verify that prerequisites are satisfied before starting each task, iterate requirements at each decomposition level until no open changes remain, then advance through phase-A TS tasks (F1.5–F1.10) and issue the phase-A Technical Specification. Trigger: ecss, e-st-10-system-scope, ts-establishment, technical-specification, phase-0, phase-a, requirements-iteration, decomposition, systems-engineering.

ashfordeOU Updated 5 repo stars
Aero Agent Skills — aerospace engineering · agentskills.io format · Apache-2.0

File contents

ashfordeou/aero-agent-skills commit 06085be771

Frequently asked questions

npx get-skill add ashfordeou/e1006-process