E1011 Timeline

Use when build the operations timeline for a human-rated space system per ECSS-E-ST-10-11C §4.9.3: sequence each crew task in a phased timeline, compute the time-averaged workload index for each hourly assessment window, verify no window exceeds the maximum allowable workload level, confirm mandatory rest gaps are preserved between consecutive high-demand activity clusters, and check that concurrent task counts remain within the cognitive limit specified by the HFE requirement. Trigger: ecss, e-st-10-system-scope, operations-timeline, crew-workload, workload-index, human-factors, task-sequencing, rest-period, concurrent-tasks.