ECSS Bare Solar Cells -- Delivery (space-systems/ecss/e2008-bare-cell-delivery)
Use when the task is clause 7.8 of ECSS-E-ST-20-08C: the ordered bare cells are ready to leave, and whether they may go has to be settled against both the order they answer and the documentation set the preceding clause asks for.
Domain quick reference
- Two arms have to close, not one. A shipment is not releasable because the cells are counted and present; every cell also has to come from a lot whose data package is released. A cell whose lot has no released package is not a cell with late paperwork, it is a cell nobody downstream can trace back to a qualified process.
- That is why a count is the weakest possible check. An ordered quantity can be met in full by cells drawn entirely from a lot whose package was never released, and a pure counting sweep passes it without a word.
- Release state is a state, not an entry. A lot listed in the package register with the release still pending is a lot without a released package, and reading the register for presence rather than for state is the quiet way this arm goes green.
- Bare cells are ordered by grade, which raises a substitution question an assembly-level delivery never has to answer. A line asking for a lower grade may be filled from a higher one when the order permits the upgrade -- the customer receives more than was bought. It may never be filled from a lower grade, which is a downgrade of the article dressed up as a substitution.
- Allocation order therefore matters as much as the rule. Exact grade is spent first and only then is a permitted upgrade drawn on, or a high line goes short because its cells were consumed by a low line that had its own stock available.
- A cell under an open nonconformance is not shippable because somebody wrote a concession; it is shippable when that concession is accepted, and those cells are named in the dispatch rather than folded into the clean count.
- What is left over is not slack. A shippable cell that no order line asks for is surplus the shipment was never asked to carry, and it is reported rather than quietly loaded.
- A partial dispatch is a decision. The order declares the fraction of a line below which a partial delivery is refused outright; a line that clears that floor without being complete still goes, and is still named as partial. A line sitting exactly on its floor clears it -- the comparison absorbs representation error rather than moving the floor.
Workflow
- Validate the order: every line carries an identifier, a grade, a positive ordered count and an explicit substitution permission, and the partial-delivery floor is a stated fraction between nought and one.
- Resolve which lots have a released data package, reading the release state rather than the presence of a register entry.
- Disposition every offered cell: held when its lot has no released package, held when an open nonconformance carries no accepted concession, shippable on an accepted concession when it does, and shippable otherwise.
- Fill each order line from the shippable cells, taking the exact grade first and only then the nearest permitted upgrade; never take a lower grade.
- Reconcile each line: shipped against ordered, the short count, the fill fraction, and which allocated cells were substitutions.
- Compare each fill fraction with the declared floor under a named tolerance, marking the line complete, partial within the floor, or refused below it.
- Report the surplus shippable cells no line asked for, the held cells with their reasons, the concession cells by name, and release only when the finding list is empty.
Pitfalls
- Counting to the ordered quantity and stopping. The count says nothing about which lots the cells came from, and the documentation arm is where a traceability break actually shows.
- Reading the lot package register for presence. An entry whose release is still pending is an entry, and treating it as coverage puts untraceable cells on the shipment.
- Letting an accepted concession stand in for documentation. A concession disposes of a nonconformance; it does not release a lot's data package, and a cell can fail both arms at once.
- Allowing a downgrade as a substitution. Filling a higher-grade line from a lower grade delivers an article the order did not buy, whatever the count says.
- Taking upgrades before exact stock. A permitted upgrade spent on a low line can starve the high line the cell was the only candidate for, so the same pool produces a short line purely through allocation order.
- Loading the surplus. A shippable cell no line wants is not a free extra; it leaves the shipment and the order disagreeing.
- Moving the floor to pass a line that sits exactly on it. An equality at the limit is a representation question, handled by the tolerance inside the comparison; the declared fraction stays as declared.
- Reporting a bare rejection. One refused line, one held cell or one surplus cell each block the dispatch for a different reason, and the report names which.
Behavior contract (gate 3)
The grade ladder and its rank order, the order and line validation with the explicit substitution permission and the bounded partial-delivery floor, the release-state reading of the lot package register, the three-way cell disposition with its concession states, the exact-grade -before-upgrade allocation with downgrades refused, the per-line short and surplus reconciliation, the floor comparison under a named tolerance and the aggregated dispatch verdict are exercised by the gate 3 contract test: scripts/test_e2008_bare_cell_delivery.py against scripts/e2008_bare_cell_delivery_logic.py (stdlib unittest, offline). Run: python3 scripts/test_e2008_bare_cell_delivery.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.