First Article Inspection

Use when preparing or reviewing an AS9102 first article inspection (FAI) report: determine whether forms 1, 2, and 3 (part accountability, material and special processes, characteristic accountability) are present and acceptable, validate that all nonconformances are closed, classify the FAI as complete or not complete, and check whether a production change triggers a delta FAI. Also scope the characteristic accountability count against the measured population. Trigger: first article inspection, fai, as9102, form 1, form 2, form 3, part accountability, characteristic, delta fai, production.