Use when the task is the in-service surveillance assessment of a spacecraft or launcher structural assembly under ECSS-E-ST-32C section 4.8 — planning periodic inspections, evaluating detected damage, and deciding on maintenance or repair actions to maintain structural integrity throughout the service life.
Domain quick reference
- Section 4.8 requires the programme to cover all phases where structural degradation can occur: ground handling, launch, and on-orbit or in-service operation. Items are grouped by structural criticality (fracture-critical, significant, or standard consequence) which drives inspection frequency.
- Inspection types are visual (surface condition, cracking, disbond), NDT (ultrasonic, radiographic, eddy-current — detects sub-surface flaws), and dimensional (checks geometric tolerances and deformation against limits). Each item carries exactly one primary inspection type; the type is set when the item enters the surveillance programme.
- Inspection interval is a function of the base interval for the item class reduced by a criticality factor, and further halved when the consumed fatigue fraction exceeds a high-fatigue threshold. This prevents an item approaching end of fatigue life from coasting to its nominal inspection point without an intermediate check.
- Damage evaluation follows a three-tier comparison against the allowable damage limit (ADL) set at design: damage at or below the ADL is accepted and documented; damage between the ADL and an extended limit requires a residual strength analysis before continued operation; damage beyond the extended limit requires repair or replacement. An item in the middle tier that lacks a residual strength analysis is flagged — continued operation is not permitted until the analysis is provided.
- Residual strength analysis must demonstrate that the damaged structure retains the required ultimate load capacity for the remaining service interval. The analysis references the fracture control plan and fatigue analysis for the item's current life consumption.
Workflow
- Inventory all structural items and assign each a criticality level: fracture-critical (loss of mission or vehicle on failure), significant (mission-capability degradation), or standard (limited consequence). Reject any item with an unrecognised criticality before it enters the programme.
- For each item, assign inspection type (visual, NDT, or dimensional) and compute the inspection interval: start from the item's class base interval, apply the criticality factor (0.5 × for fracture-critical, 0.75 × for significant, 1.0 × for standard), then halve the result if the item's consumed fatigue fraction exceeds the high-fatigue threshold (0.8). Record whether the interval was reduced due to high fatigue.
- At each inspection event, record all detected damage with type (crack, dent, corrosion, delamination, impact, scratch), measured size, and whether a residual strength analysis exists for that damage state.
- Evaluate each damage report against the allowable damage limit:
- Damage ≤ ADL: accept; document and monitor at next scheduled inspection.
- ADL < damage ≤ 2 × ADL with residual strength analysis: accept under continued-flight rationale; record the analysis reference.
- ADL < damage ≤ 2 × ADL without residual strength analysis: flag; do not permit continued operation until the analysis is completed.
- Damage > 2 × ADL: repair if a qualified repair scheme exists; otherwise replace the component.
- Aggregate all inspection schedules and damage dispositions into a surveillance result. The assessment is compliant only when no damage disposition remains flagged, unrepaired, or unreplaced, and no item carries invalid data.
- Document findings and reduced-interval notifications in the surveillance report; route flagged items and repair/replace decisions to the responsible structural authority.
Pitfalls
- Applying the base interval directly to fracture-critical items without the criticality factor — this understates inspection frequency for the highest-risk items and allows damage to grow undetected between inspections.
- Treating a missing residual strength analysis as a pass in the middle damage tier — the absence of the analysis is itself a blocking finding, not evidence that the structure is adequate.
- Conflating the allowable damage limit with the extended damage limit: only damage strictly within the ADL is accepted without further analysis. The extended region (ADL to 2 × ADL) always requires residual strength verification.
- Omitting the fatigue-fraction check on inspection interval: an item that has consumed more than 80 % of its fatigue allowable is more susceptible to crack initiation and must be inspected on a shortened cycle, not the nominal one.
- Accepting a damage report for an item not in the surveillance inventory — a damage report with no matching inventory item cannot be evaluated and must be flagged as an unresolved finding.
Behavior contract (gate 3)
The inspection-interval, damage-evaluation, and full-surveillance-compliance logic is exercised by the gate 3 contract test: scripts/test_in_service_surveillance.py against scripts/in_service_surveillance_logic.py (stdlib unittest, offline). Run: python3 scripts/test_in_service_surveillance.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.