ECSS Nonconformance Control — Corrective and Preventive Action (space-systems/ecss/q1009-capa)
Use when the task is the action-definition step of ECSS-Q-ST-10-09C clause 5.3 — deciding which actions a nonconformance actually earns, whether they reach its root causes, and whether recurrence has been stopped rather than merely detected next time.
Domain quick reference
- Three kinds of action follow a nonconformance and only two of them are what the clause asks for. Containment stops the escape now: segregate, impound, screen the built stock. Corrective action removes a cause that has already produced a nonconformance. Preventive action removes a cause before it produces one, wherever the same mechanism can reach.
- Containment is not correction. An action set made only of containment holds the escape and leaves every cause in place, so it closes nothing.
- An action is worth the control it installs. Eliminating the possibility outranks a substitution, which outranks an engineering control, which outranks a written procedure or a training session, which outranks an added inspection. Added inspection detects the defect again; it has not removed the cause, so it never closes one on its own.
- Some causes reach further than the item in hand. A design, process, procedure, training or supplier cause is systemic by nature, and a cause that has now occurred more than once has demonstrated it, so both owe a preventive action as well as a corrective one.
- Every cause needs evidence behind it. A cause asserted from opinion gives the action set nothing to be effective against, and the effectiveness check downstream has nothing to measure.
- The rationale is part of the record. An action chosen without a stated reason cannot be re-argued when it fails to hold, and the next occurrence starts the same investigation from nothing.
Workflow
- Take the root causes with their categories, occurrence counts and supporting evidence; reject an empty or duplicated cause set rather than proceeding against an unknown target.
- Mark the causes that owe prevention: every systemic category, plus any cause whose occurrence count has reached the recurrence threshold the programme declares.
- Validate each proposed action — identifier, type, the control it installs, the cause it addresses and its rationale. A corrective or preventive action pointing at a cause outside the set is an input error, not a weak action.
- Map corrective actions onto causes and keep the strongest control per cause. Name any cause with no corrective action at all, and any cause whose only cover is added detection.
- Compare the preventive actions against the causes that owe one and report the gaps by cause, not as a single count.
- Report the weakest corrective control in the set: it is the action most likely to be the one that fails the effectiveness check later.
- Close with an adequacy verdict and the named gaps, so the implementation step downstream tracks actions that are worth tracking.
Pitfalls
- Recording a screening campaign as the corrective action. Screening is containment; it finds the units already affected and changes nothing about why they were affected.
- Adding an inspection step and calling the cause closed. The inspection detects the same defect on the next unit, so the cause is still producing nonconformances and the only change is that the programme pays to find them.
- Writing one action against several causes and counting it once per cause. Coverage is per cause, and an action that removes one mechanism does not remove the others because it was listed against them.
- Answering a second occurrence with the same one-off correction. A repeat is evidence that the cause is systemic, and what it owes is a preventive action across the family, not a second repair.
- Assigning training as the standing answer to a workmanship cause. Training is a weak control by rank; where a fixture, a tool change or a design change can remove the possibility, the stronger control is the one the clause is asking for.
- Leaving the rationale out because the action is obvious. Obvious actions are exactly the ones that get reversed quietly later, with nothing in the record to say what they were for.
Behavior contract (gate 3)
The cause validation, recurrence marking, action validation, coverage mapping, preventive-gap detection and adequacy verdict are exercised by the gate 3 contract test: scripts/test_q1009_capa.py against scripts/q1009_capa_logic.py (stdlib unittest, offline). Run: python3 scripts/test_q1009_capa.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.