ECSS Nonconformance Control — Nonconformance Report DRD (space-systems/ecss/q1009-ncr-drd)
Use when the task is Annex A of ECSS-Q-ST-10-09: a nonconformance has been raised, and the report carrying it has to be written or graded — on the blocks its stage owes, the blocks its disposition path brings, and the board that has to settle it.
Domain quick reference
- The report is filled in stages, not at once. At raising it says what was found, on what item, against which requirement and in what category; at the board it adds the cause, the proposed disposition and the justification; at closure it adds the implementation and verification record and the closing authority. Grading a report at raising against the closure blocks refuses every honest report.
- The disposition path brings its own content. Accepting an item as it stands and repairing it both leave the product off the requirement, so each owes a technical justification and the effect on interfaces and lifetime; rework owes its procedure and the reinspection that followed; scrap owes the authorisation and the segregation record; a return owes the supplier authorisation and the request raised on them.
- A block is filled when it points at something readable. A ticked box with no entry reference behind it is an unfilled block, and the coverage falls accordingly.
- The board follows the content, not the habit. A major nonconformance, a safety effect, or a disposition leaving the product off the requirement routes the report to the customer board; everything else is settled internally. The routing is derived, so it cannot be quietly downgraded on the way to the meeting.
- A customer board leaves a trace. A report closed on the customer route with no recorded customer approval is not closed, whatever its status field says — and that approval is owed at closure, not at the board, because it is the board's output.
- Stage coverage is the graded figure; the path and customer blocks are pass or fail. A relaxed coverage policy may tolerate an unfilled stage block as an advisory, and never tolerates a missing path block.
Workflow
- Validate the data-item policy first: the stage coverage demanded, the routing flags for a major nonconformance and a safety effect, and whether a customer approval record is required. A policy routing neither majors nor safety effects to the customer board is refused, because it leaves no customer route at all.
- Validate the report identity: a recognised stage, a recognised category, a recognised disposition where one is proposed, a boolean safety effect, a non-blank identifier and a named affected item. A report with no identifier or no item closes on not raised.
- Validate the content blocks: recognised names, no block twice, a boolean present flag and an entry reference that may be blank but is then read as unfilled.
- Refuse to grade path content when the report has reached the board stage with no disposition proposed; that is the finding.
- Derive the board from the category, the safety effect and the disposition, and take the blocks owed: the stage blocks, the path blocks, and the customer approval record at closure on a customer route.
- Take the stage coverage and the overall coverage, and name the missing base, path and customer blocks separately.
- Close on one verdict in order: report not raised, disposition not proposed, base content incomplete, disposition path content missing, customer approval missing, ready for the customer board, ready for the internal board, or complete for closure. Report the board, the owed blocks and the coverages alongside it.
Pitfalls
- Grading a report at raising against the closure blocks. Every report fails that way, and the real gap at raising goes unnoticed.
- Treating the disposition as one more free-text field. Each path brings content with it, and the path blocks are what make the disposition reviewable rather than asserted.
- Settling a use-as-is internally because it is only one part. The product is off the requirement, which is the customer's call whatever the quantity.
- Asking for the customer approval record at the board. It is the board's output, so demanding it as an entry condition deadlocks the report.
- Reading a filled-in tick as content. A present block with no entry reference is what the coverage figure exists to catch.
Behavior contract (gate 3)
The policy validation, report identity validation, block validation, the stage block sets, the disposition path blocks, the customer approval block at closure, the board routing, the stage and overall coverages, the missing-block reporting and the report verdict are exercised by the gate 3 contract test: scripts/test_q1009_ncr_drd.py against scripts/q1009_ncr_drd_logic.py (stdlib unittest, offline). Run: python3 scripts/test_q1009_ncr_drd.py