Q20 Gse Production

Evaluate the production of a ground support equipment item under ECSS-Q-ST-20C clause 5.8.3: grade each bought-in lot on supplier approval state, incoming inspection, conformity evidence and lot traceability, apply the surveillance a conditionally approved supplier owes, replay the manufacturing, assembly and integration operations in sequence against process qualification and operator certification validity, check every mandatory inspection point for completion and the right witness, and return released, released-with-actions or held. Use when a GSE build is up for release. Trigger: ecss, q-st-20c-clause-5-8-3, gse-procurement-assurance, gse-supplier-surveillance, gse-mandatory-inspection-point, gse-process-qualification-validity, gse-build-release-verdict.

ashfordeOU Updated 5 repo stars
Aero Agent Skills — aerospace engineering · agentskills.io format · Apache-2.0

File contents

ashfordeou/aero-agent-skills commit 8d8889a82f

Frequently asked questions

npx get-skill add ashfordeou/q20-gse-production