Q40 Verification Planning

Plan safety verification under ECSS-Q-ST-40C: assign a method to each safety requirement — test, analysis, inspection, review of design, similarity — on the rule that rising severity withdraws the weaker methods, then check the assignment is supportable (analysis of a catastrophic requirement needs correlated test data behind it, similarity needs a named baseline item), that every requirement has a planned verification report, and that closure is planned no later than the review milestone its severity allows. Use when a safety verification plan is drafted or reviewed. Trigger: ecss, q-st-40c, safety-verification-planning, safety-verification-method-assignment, safety-verification-report-planning, safety-closure-milestone, verification-method-admissibility.