ECSS EEE Components — Class 1 Stock Relifing (space-systems/ecss/q60-class-1-stock-relifing)
Use when the task is the relifing of ECSS-Q-ST-60C clause 4.3.10 —
restoring the storage validity of Class 1 parts that have sat in the
store past the period they were accepted under, so that stock already
paid for can go on a build instead of being re-purchased.
Domain quick reference
- The period in force is not the period the parts were bought under.
Every relifing round shortens it by a step, down to a floor, because
stock kept once is not re-granted the period fresh parts get. The
shortening is what stops relifing running forever on its own.
- The clock restarts at the last acceptance or relifing operation,
never at goods-in. Counting from goods-in retires stock that a
previous relifing already put back in date.
- Expiry is calendar-month arithmetic, not a day count, and the expiry
day itself is still in date. The period runs out after that day.
- Two different clocks run at once. The storage period counts months in
the store; the moisture-sensitivity floor-life budget counts hours
outside the dry pack. Stock can be well inside its floor-life budget
and still expired, or freshly accepted and already over-run.
- A floor-life over-run obliges a bake before the re-verification is
worth running, and the bake duration comes from the package thickness
band, not from the sensitivity level alone — a thick body holds
moisture a thin one has already given up. A package thicker than the
widest band has no established bake time and is refused.
- Solderability is the test that usually decides a relifing. Finish
intermetallic growth is what the storage period is really limiting,
and it is the one degradation a bake does nothing for.
- The round ceiling is read before any result. Stock past its
permitted rounds goes to full re-screening whatever the sample did,
because reading the result first invites it to be argued against the
ceiling.
Workflow
- Compute the period in force from the base period and the rounds
already used, floored at the minimum period.
- Add it to the last acceptance or relifing date and compare the
assessment date with the resulting expiry; in-date stock stops here.
- Test the relifing round ceiling. Stock that has used its rounds goes
to re-screening and no results are read.
- Compute the consumed floor-life fraction from the exposure hours and
the sensitivity level, and decide whether a bake is owed.
- Where a bake is owed, read its duration from the package thickness
band and add the post-bake moisture verification to the test set.
- Size the relifing sample and judge every required test against its
accept number; a required test with no result is refused, not passed.
- On a clean re-verification, re-grant the shortened period from the
assessment date and report the new expiry; on any failed test, reject
the stock.
Pitfalls
- Re-granting the base period at every relifing. The period has to
shorten, or stock ages indefinitely on paper while degrading in fact.
- Counting months from goods-in on stock that has already been relifed.
The clock restarted at that operation.
- Treating the expiry date itself as expired. Stock is in date through
that day, and an assessment run on it is an in-date result.
- Conflating the storage period with the floor-life budget. They measure
different degradations on different clocks, and passing one says
nothing about the other.
- Baking to the sensitivity level and ignoring the package thickness. A
thick body needs far longer, and a short bake leaves moisture in place
under a clean-looking verification.
- Reading the re-verification before the round ceiling. Stock past its
ceiling is not made eligible by a clean solderability result.
- Expecting a bake to rescue solderability. A bake drives moisture out;
it does not undo intermetallic growth on the finish.
Behavior contract (gate 3)
The period-in-force arithmetic, calendar-month expiry, round ceiling,
floor-life fraction, bake duration band, required-test derivation,
sample sizing and accept-number evaluation are exercised by the gate 3
contract test: scripts/test_q60_class_1_stock_relifing.py against
scripts/q60_class_1_stock_relifing_logic.py (stdlib unittest, offline).
Run: python3 scripts/test_q60_class_1_stock_relifing.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.
1---2name: q60-class-1-stock-relifing3description: "Determine whether expired Class 1 EEE stock can have its storage validity restored under ECSS-Q-ST-60C clause 4.3.10. Use when testing stored parts against the expiry their last acceptance granted, measuring how much moisture-sensitivity floor life has been consumed to decide whether a bake precedes relifing, sizing the relifing sample, judging external visual, solderability and leak results against their accept numbers, and re-granting a shortened storage period from the relifing date. Refuses an unlisted moisture sensitivity level, a package thicker than the bake register covers, and stock that has used up its permitted relifing rounds. Trigger: ecss, q-st-60c, class-1-stock-storage-expiry, moisture-sensitivity-floor-life-budget, dry-pack-bake-recovery, relifing-solderability-sample, shortened-re-granted-storage-period, stored-stock-re-screening-ceiling."4license: Apache-2.05compliance: STANDARDS-REF6standards:7 - id: ecss8 reference-only: true9gated: false10domain: space-systems11pack: space-systems12compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"13metadata:14 source: https://skillmd.com/skills/ashfordeou/q60-class-1-stock-relifing15 domain: space-systems16 subdomain: ecss17 tags: [ecss, q-st-60c-eee-components-scope, q60-class-1-stock-relifing, class-1-stock-storage-expiry, moisture-sensitivity-floor-life-budget, dry-pack-bake-recovery, relifing-solderability-sample, shortened-re-granted-storage-period]18 version: 0.1.019 author: Aero Agent Skills20---2122# ECSS EEE Components — Class 1 Stock Relifing (space-systems/ecss/q60-class-1-stock-relifing)2324Use when the task is the relifing of ECSS-Q-ST-60C clause 4.3.10 —25restoring the storage validity of Class 1 parts that have sat in the26store past the period they were accepted under, so that stock already27paid for can go on a build instead of being re-purchased.2829## Domain quick reference3031- The period in force is **not** the period the parts were bought under.32 Every relifing round shortens it by a step, down to a floor, because33 stock kept once is not re-granted the period fresh parts get. The34 shortening is what stops relifing running forever on its own.35- The clock restarts at the **last acceptance or relifing operation**,36 never at goods-in. Counting from goods-in retires stock that a37 previous relifing already put back in date.38- Expiry is calendar-month arithmetic, not a day count, and the expiry39 day itself is still in date. The period runs out after that day.40- Two different clocks run at once. The storage period counts months in41 the store; the moisture-sensitivity **floor-life budget** counts hours42 outside the dry pack. Stock can be well inside its floor-life budget43 and still expired, or freshly accepted and already over-run.44- A floor-life over-run obliges a **bake before** the re-verification is45 worth running, and the bake duration comes from the package thickness46 band, not from the sensitivity level alone — a thick body holds47 moisture a thin one has already given up. A package thicker than the48 widest band has no established bake time and is refused.49- Solderability is the test that usually decides a relifing. Finish50 intermetallic growth is what the storage period is really limiting,51 and it is the one degradation a bake does nothing for.52- The round ceiling is read **before** any result. Stock past its53 permitted rounds goes to full re-screening whatever the sample did,54 because reading the result first invites it to be argued against the55 ceiling.5657## Workflow58591. Compute the period in force from the base period and the rounds60 already used, floored at the minimum period.612. Add it to the last acceptance or relifing date and compare the62 assessment date with the resulting expiry; in-date stock stops here.633. Test the relifing round ceiling. Stock that has used its rounds goes64 to re-screening and no results are read.654. Compute the consumed floor-life fraction from the exposure hours and66 the sensitivity level, and decide whether a bake is owed.675. Where a bake is owed, read its duration from the package thickness68 band and add the post-bake moisture verification to the test set.696. Size the relifing sample and judge every required test against its70 accept number; a required test with no result is refused, not passed.717. On a clean re-verification, re-grant the shortened period from the72 assessment date and report the new expiry; on any failed test, reject73 the stock.7475## Pitfalls7677- Re-granting the base period at every relifing. The period has to78 shorten, or stock ages indefinitely on paper while degrading in fact.79- Counting months from goods-in on stock that has already been relifed.80 The clock restarted at that operation.81- Treating the expiry date itself as expired. Stock is in date through82 that day, and an assessment run on it is an in-date result.83- Conflating the storage period with the floor-life budget. They measure84 different degradations on different clocks, and passing one says85 nothing about the other.86- Baking to the sensitivity level and ignoring the package thickness. A87 thick body needs far longer, and a short bake leaves moisture in place88 under a clean-looking verification.89- Reading the re-verification before the round ceiling. Stock past its90 ceiling is not made eligible by a clean solderability result.91- Expecting a bake to rescue solderability. A bake drives moisture out;92 it does not undo intermetallic growth on the finish.9394## Behavior contract (gate 3)9596The period-in-force arithmetic, calendar-month expiry, round ceiling,97floor-life fraction, bake duration band, required-test derivation,98sample sizing and accept-number evaluation are exercised by the gate 399contract test: scripts/test_q60_class_1_stock_relifing.py against100scripts/q60_class_1_stock_relifing_logic.py (stdlib unittest, offline).101Run: python3 scripts/test_q60_class_1_stock_relifing.py102103## Compliance104105- ECSS standards are freely downloadable (ESA); cite the source and106 paraphrase per standards-map.yaml.107- compliance: STANDARDS-REF, gated: false.