ECSS Commercial EEE Components -- Class 2 Connectors (space-systems/ecss/q6013-class-2-connectors)
Use when the task is the clause 5.6.6 connector question of ECSS-Q-ST-60-13C at the intermediate assurance class: a connector whose contacts can be taken out of the insert and put back has been picked for a harness, and the question is whether the way it is loaded, the way it has been worked and the way it was documented keep it inside what the class allows.
Domain quick reference
- Removability is the feature that makes the connector repairable and it is the feature that wears it out. Every insertion works the retention clip that holds the contact in the insert, and a clip worked too many times releases under vibration rather than under the extraction tool.
- The insertion count is carried per position, not per connector. One position reworked four times is a failure waiting in an otherwise untouched insert, and the finding has to name that position so the contact is replaced rather than pushed back in again.
- The allowed contact current is derived, not read. The rated current of a single contact is derated for the class, then derated again for the share of positions carrying current at once, because a fully loaded insert heats itself and every contact in it.
- The loading factor is applied to the fraction of positions energised rather than to their count, so one policy works for a nine-way and a sixty-one-way insert without a table per shell size.
- Durability is spent before launch, not during flight. Integration, test and retest matings come out of the same rated mating life, and a connector arriving at launch with its durability already spent has no margin for a late demate.
- Spare positions are the repair budget. A harness with every position used has nowhere to move a wire when a contact is damaged, and the repair becomes a connector change rather than a contact change.
- Evidence is scored, not ticked. A subject may be carried against a heritage connector of the same insert arrangement at this class, which the class above does not allow, and heritage is credited below a direct record so that a build documented entirely by what an earlier programme did cannot read as a documented build.
Workflow
- Validate the connector policy first: the insertion limit, the class current derating, the loading slope, the mating-cycle cap, the spare floor, the evidence share and credited floors, the heritage credit and the marginal band. A limit below one insertion, a zero derating or credit, a loading slope of one, or a credited floor above the plain one is refused rather than used.
- Validate the connector identity: a reference, an insert arrangement, a positive rated contact current, a positive rated mating life, a non-negative planned mating count and a removal tool reference. A connector with no reference, no arrangement or no tool closes the assessment on connector not identified.
- Validate every contact position: a named position, a recognised removable termination, a whole non-negative insertion count, and a consistent loading declaration. A position declared both spare and energised, or energised and carrying nothing, is refused.
- Name every position worked past the insertion limit. That list closes the assessment on its own, because a released contact is a harness fault rather than a derating margin.
- Take the loading fraction, apply the loading factor on top of the class derating, and name every position over the resulting allowance. Compare with a tolerance that absorbs representation error so a current landing on the allowance is admissible.
- Take the planned matings as a share of the rated durability and the spare positions as a share of the insert, and compare each against its limit.
- Dispose each required evidence subject as held directly, held against heritage, declared without a record, or absent, then report every failing list in full rather than truncating at the first entry.
- Report the loading fraction, the allowance, the overloaded and over-inserted positions, the consumed durability, the spare share, the evidence share and the credited evidence, and raise an advisory for every energised position inside the marginal band. Close on one verdict: connector not identified, contact insertion limit exceeded, contact current derating exceeded, mating durability consumed, spare provision short, evidence short, or connector meets class two scope.
Pitfalls
- Sizing the harness on the single-contact rating. That rating describes a connector with one wire in it; the same insert with every position energised runs hotter and carries less per contact.
- Counting insertions per connector rather than per position. The connector average is fine while one position is on its fifth rework, and the average is not the position that lets go.
- Reinserting a contact that has passed the limit because it still feels tight. Retention is measured in a pull test, not in the fingers, and the limit exists because the clip has already been worked.
- Counting only flight matings against the rated durability. Integration and test matings come out of the same life, and they are the ones nobody logs.
- Filling every position because the wire list fits. A repair then needs a new connector rather than a new contact, and the schedule discovers that at the worst moment.
- Crediting a heritage claim in full. Heritage is permitted here and it is thinner than a record from this build with these tools and this operator, which is what the credit records; a heritage claim naming no connector is grouped with the subjects that hold no record at all.
Behavior contract (gate 3)
The policy validation, the connector identity validation, the contact validation, the loading fraction and factor, the derated contact allowance, the overloaded and over-inserted position lists, the consumed mating durability, the spare share, the held, heritage, unrecorded and absent evidence dispositions, the evidence share, the credited evidence, the marginal advisories and the connector verdict are exercised by the gate 3 contract test: scripts/test_q6013_class_2_connectors.py against scripts/q6013_class_2_connectors_logic.py (stdlib unittest, offline). Run: python3 scripts/test_q6013_class_2_connectors.py
Compliance
- ECSS standards are freely downloadable (ESA); cite the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.